Ghatkopar metro station

Ghatkopar
घाटकोपर
metro station
Location Ghatkopar Station (West), Mumbai
Coordinates 19°05′12″N 72°54′29″E / 19.086660°N 72.90799°E / 19.086660; 72.90799
Owned by Mumbai Metropolitan Region Development Authority (MMRDA)
Operated by Mumbai Metro One Pvt Ltd (MMOPL)
Platforms 2
Tracks 2
Construction
Structure type Elevated
Platform levels 3
Parking No
Bicycle facilities No
Disabled access Yes
Other information
Station code GHK
History
Opened 8 June 2014 (2014-06-08)
Electrified Yes
Services
Preceding station   Mumbai Metro   Following station
toward Versova
Line 1Terminus
Mumbai Metro train arriving at Ghatkopar

Ghatkopar is a metro station and the eastern terminus of Line 1 of the Mumbai Metro serving the Ghatkopar suburb of Mumbai, India. It was opened to the public on 8 June 2014. Ghatkopar is the busiest station on Line 1, with 27% of all passengers travelling through the station.[1]

The Ghatkopar station is connected with the western side of the Ghatkopar railway station through a 12-meter wide foot-over-bridge (FOB).[2][3][4] Commuters who want to exit the metro station from the main gate must purchase a platform ticket to cross the FOB and reach the road.[5]

Although the Central Railway (CR) had initially permitted metro commuters to use the FOB as a goodwill gesture around two weeks after the metro's opening, they announced that commuters found using the FOB without a platform ticket or a railway pass would be fined. A CR official told Mid Day, "We have seen the flow of passengers and we think that our local train passengers are facing a problem because of the sudden rush of Metro passengers. Therefore we are now insisting that Metro passengers buy tickets to use the railway-owned overbridge." Railway Pravasi Sangh President Subhash Gupta told the paper, "I am aware of this issue and also took it up in the meeting with railway officials. The railway FOB here can't take the burden of thousands of additional Metro passengers. The rush has increased manifold after Metro services started."[6]

There are 7 sets of automated fare collection (AFC) gates at Ghatkopar station. Three more will be installed by the end of June 2014.[7] The station has textured tiles intended to provide grip to wheelchair-bound commuters. The station also has an elevator wide enough to accommodate a wheelchair, and a ramp from road level up to the elevator, enabling access for the disabled.[8]

The Mumbai Metropolitan Region Development Authority (MMRDA) acquired a 1,400 square metre plot near the Ghatkopar railway station for construction of the Ghatkopar metro station. The MMRDA initially believed that the land belonged to the Brihanmumbai Municipal Corporation (BMC). While the metro was being constructed, the CR wrote letters to the MMRDA informing them that the land actually belonged to CR. After CR submitted documents proving the same, the MMRDA agreed to compensate them for the plot. At a meeting between MMRDA and CR officials in April 2014, it was agreed that the former would pay 18 crore (US$2.7 million) for acquiring the land as part of an inter-governmental agency deal. However, some CR officials were reportedly upset as the amount was far lower than the market value of the land. As per market trends at the time, the land was estimated to be worth 180 crore (US$27 million).[9]

References

This article is issued from Wikipedia - version of the Thursday, April 28, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.