Line 4 Sheppard
Line 4 Sheppard | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Platform level of Don Mills Station | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Toronto rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Toronto, Ontario | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
Sheppard–Yonge Don Mills | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 5 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 47,680 (avg. weekday)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | November 22, 2002 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Toronto Transit Commission | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Toronto Transit Commission | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | T1 (will be replaced by Toronto Rocket trains effective summer 2016) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 5.5 km (3.4 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 4 ft 10 7⁄8 in (1,495 mm) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Third rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Line 4 Sheppard[2] is the most recently built subway line of the Toronto rapid transit system, operated by the Toronto Transit Commission (TTC). It has five stations[2] and is 5.5 kilometres (3.4 mi) long. It opened on November 22, 2002.[3]
The entire line runs under or near Sheppard Avenue East. All of its stations connect to surface TTC bus routes. All stations have elevators for wheelchair access, and public art; noteworthy examples are the scenic mural at Sheppard–Yonge, the illusionary trompe l'oeil sketches at Bayview, and Leslie Station’s hundreds of tiles showing the words “Sheppard & Leslie” handwritten by members of the public.
Sheppard is the only rapid transit line without a yard; cars are stored at Davisville Subway Yard on the Yonge section of Line 1 Yonge–University.
Name
When the subway opened it was given the name "Sheppard line" and the official name 4 Sheppard Subway.[4]
In October 2013, the TTC announced plans to give the lines official numbers to help riders and visitors to navigate the system. The Sheppard line is numbered as Line 4 and the new signage commenced in March 2014.[5][6][7]
History
Origins
The Sheppard Line was proposed as part of the Network 2011 transportation plan, unveiled in 1985, which called for a line from Yonge Street to Victoria Park Avenue.[8] The plan was approved by Metropolitan Toronto, but funding was delayed by the provincial government of David Peterson's Liberal Party.
In 1993, the governing New Democratic Party (NDP) under Bob Rae proposed provincial funding for four subway/LRT projects for the TTC. Included in these four proposals were plans to build new subway lines along Eglinton and Sheppard Avenues and work was begun on both projects.[9] The NDP was defeated in the 1995 provincial election, and the Progressive Conservatives under Mike Harris were elected. Harris cancelled the Eglinton subway (and filled in the hole near Eglinton West station), but continued work on the Sheppard Line.
Funding for the Sheppard Line was rejected by city council. However, after a number of votes on different alterations to the project (including only building the subway to Leslie Street), the proposal to build the Sheppard Line tunnels only, without tracks, was passed by a narrow margin. After this vote passed city council, a re-vote was taken on the entire Sheppard line project to Don Mills, which then passed by the narrowest of margins. James Bow, a Toronto Transit reporter, has documented that the political clout of North York Mayor Mel Lastman (he was later elected Mayor of the amalgamated City of Toronto) was crucial to the Sheppard Line proposal being implemented.[10]
Completion and opening
When the Sheppard line opened in 2002, it was the city’s first new subway line since the opening of the Bloor–Danforth line in 1966. It is shorter than had been planned, running from Yonge Street (at the former Sheppard station, renamed Sheppard–Yonge when the Sheppard line opened) east to Don Mills Road rather than further west to Downsview Station and southeast to Scarborough Centre Station.
The Sheppard line cost just under C$1 billion and took eight years to build. It is the first subway line in Canada that had plain tunnel sections built entirely by tunnel boring machine. All stations on the line are in cut-and-cover sections, and just east of Leslie Station, there is an enclosed bridge over the east branch of the Don River. The Sheppard line is the only subway line in Toronto not to have any open sections. Yonge Street had to be diverted for several years in order to accommodate the expansion of Sheppard Station.
Platform screen doors were proposed for the Sheppard line. Installed at the edge of the platforms, platform screen doors would align themselves with the subway-car doors when in station for safety and suicide prevention. The system was dropped on the account of cost.
Stations are built to take the TTC's standard subway trains of six 23-metre (75 ft) cars eventually, but part of each platform has been blocked off, since only four-car trains are needed to carry the amount of traffic the line receives. The line is designed in a way that it can be extended at both ends, allowing for the construction of the planned westward and eastward branches. Likewise, the Sheppard line level of Sheppard–Yonge station is constructed as a roughed-in Spanish solution station to anticipate increased ridership.
The automated system to announce each stop was installed in January 2006.
Rolling stock
Since its opening in November 2002, the line has been operated solely with four-car T1 subway trains. The TTC plans to replace the T1 trains on Line 4 with new four-car Toronto Rocket (TR) subway trains in the summer of 2016. The T1 trains will be moved to Line 2 Bloor–Danforth. This is necessary because Line 4 trains are based out of Davisville Yard, which is accessed via Line 1 Yonge–University. That line will operate using an Automatic train control system which is scheduled to go online in 2020 and the T1 trains are not compatible with this system.
Residential development
The Sheppard line has spurred over $1 billion of construction of new housing, including several high-rise condominium towers, along its route as transit-oriented developments. Condominium towers have been built around Bayview Station, where none had existed prior to the 2000s. In addition, between Leslie and Bessarion stations, a former Canadian Tire warehouse/distribution centre next to Highway 401 (the chain retains a store nearby, along with Mark's Work Wearhouse, also owned by Canadian Tire) was demolished and the land was being sold to Concord Adex Investments Limited of Vancouver. Construction on the first phase is well underway to develop the area into a large multi-condo complex, Concord Park Place, which includes a community park.[11] There is also development around Swedish furniture chain IKEA in the immediate area; IKEA runs a free shuttle bus between the store and Leslie station.
The Daniels Corporation built a six-tower development, called NY Towers, north of the 401 between Bayview and Bessarion; Arc Condominiums on the northeast corner of Bayview/Sheppard; and terraced condos just east of their NY Towers. Shane Baghai built a multi-tower development in the area.
Ridership
From late 2002 to 2011, ridership on the Sheppard subway rose from about 10.7 million riders annually to a peak of 15.9 million. However, in 2014, ridership on the line dropped slightly by 5% to 15.1 million. (The TTC does not consider that a statistically significant decline.)[12]
The following list shows the typical number of customer-trips made on the Sheppard subway on an average weekday:
- 2007–2008 – 45,860[13]
- 2008–2009 – 45,410[14]
- 2009–2010 – 47,700[15]
- 2010–2011 – 49,150[16]
- 2011–2012 – 50,410[17]
- 2012–2013 – 49,410[18]
- 2013–2014 – 47,680[19]
Criticism
The line has been derided as a “subway to nowhere,” a “stubway” or a "white elephant."[20] Apart from the Sheppard–Yonge and Don Mills terminals, its stations have received relatively little use, even during rush hour. The total ridership on the Sheppard subway line is approximately 47,000 per average weekday, similar to a few of the TTC's busiest streetcar and bus routes, though these routes are generally much longer than Sheppard's 5.5-kilometre (3.4 mi) length. One significant problem is that the Sheppard line feeds into the already overcrowded Yonge segment of Line 1 Yonge–University, since the Sheppard line does not have its own train yard and does not continue west to the University segment of the line. During the City of Toronto's 2008 budget crisis, the TTC considered shutting the line down on weekends or entirely.[21]
Jarrett Walker, a transportation consultant and the author of the book Human Transit, says "Sheppard’s technology makes it both expensive to abandon and expensive to extend; that’s the trap."[22]
Councillor Josh Colle, who is chairing the TTC since December 2014, said in May 2015, that given the existing Sheppard subway's performance, he cannot rationalize spending more money to expand it east from Don Mills or west from Sheppard–Yonge. He estimates that the Sheppard subway receives a subsidy of more than $10 per ride.[12]
Future expansion
Several proposals have been made to extend the line in both directions.
Extension
The original proposal for the Sheppard line was for a major subway line running from Downsview Station on the Spadina line to Scarborough Centre Station. Instead, funding was only approved for a truncated line, with several phased expansions.
The TTC considered the eastward extension of the Sheppard line to Scarborough Centre Station as one of its top priorities for rapid-transit expansion, which would see the expansion of rapid transit in Scarborough for the first time since the completion of Line 3 Scarborough. The eastward extension would include new stations at Consumers Road, Victoria Park Avenue, Warden Avenue, Kennedy Road, Agincourt GO Station, and Progress Avenue, terminating at the existing Scarborough Centre Station on the Scarborough RT line. The expansion proposal also included the possible addition of a station at Willowdale Avenue between Sheppard–Yonge and Bayview stations on the existing portion of the line.
The TTC estimates that a Sheppard subway to Scarborough Centre would have 7,800 riders per hour while 10,000 per hour is the minimum number of riders per hour considered appropriate for a subway. The maximum capacity of the subway is about 30,000 riders per hour, approximately the load the Yonge line carries in the morning rush.[12]
A separate 4.5-kilometre (2.8 mi) westward extension to Downsview Station considered the creation of stations at Senlac Road, Bathurst Street, and Faywood Boulevard. Lower population density made this expansion a much lower priority, as the minimal increase in ridership was insufficient to justify the costs. The approval of the Spadina subway extension into York Region renewed interest in this phase, as a subway connection between Downsview and Sheppard–Yonge stations would significantly lower commuting times for York University students. The tunnel from Sheppard–Yonge to Welbeck Road (east of Senlac) was built for train storage at the time of original construction.
Transit City
In March 2007, the City of Toronto and the TTC released the Transit City proposal to begin a new round of transit expansion using light rail technology on dedicated rights-of-way instead of subway technology. Under this plan the Sheppard East subway extension had been replaced by a light rail line running from Don Mills Station along Sheppard Avenue East to Meadowvale Road, where it would meet the northern terminus of an extended Line 3 Scarborough. Under this proposal, there would be no direct connection between North York Centre and Scarborough City Centre.
In 2009, a westward extension was again considered by the TTC to link the line to Wilson Subway Yard. It was immediately dismissed due to cost.[23]
Ford era
As a result of the election of Rob Ford as mayor of Toronto in 2010, the western extension of the Sheppard subway to Downsview Station and the eastern extension to Scarborough Centre were considered a priority again.[24] Ford indicated in a December 2010 interview with The Globe and Mail newspaper that all other transit projects would come second to completing the Sheppard line. Ford stated "I’m just focusing on doing the Sheppard subway underground".[25]
On March 31, 2011, Toronto Mayor Rob Ford announced that the proposed Sheppard East LRT line would be replaced by western and eastern extensions for the Sheppard Subway so that the completed line would run from Downsview Station to Scarborough Centre. The Province of Ontario approved this plan, which is estimated to cost $4.2 billion. The City of Toronto will assume complete financial responsibility for the project, which is proposed to be funded through a public–private partnership, as well as surplus funds from the proposed Eglinton Crosstown line, if there will be any. Massive redevelopment along the route would be needed to generate these funds, as the current population density and projected ridership is too low to support the cost of the expansion by itself.[26][27]
Metrolinx estimates that the Sheppard West extension to Downsview would be 5.45 km (3.39 mi) long, add two stations, and cost $1.48 billion. The Sheppard East extension would be 8 km (5.0 mi) long, add seven stations, and cost $2.75 billion.[28]
Gordon Chong, head of the TTC agency tasked with analyzing the new subway plans, has said it is possible that no new transit development will occur along Sheppard.[29]
Stintz's alternative
On January 23, 2012, TTC Chair Karen Stintz suggested a plan to extend the line two stops eastwards funded by making the eastern portion of the Eglinton Crosstown line at street level.[30] This motion was defeated by the TTC board. She then got 24 councillors (a majority) to sign a petition calling for a special council meeting for February 8 of that year.
In the meeting, council voted to build the Eglinton project according to the original Transit City plan (partly underground and partly at grade), build an at-grade Finch LRT, and to appoint a panel to recommend whether to pursue the eastward extension of the Sheppard subway or construct the Sheppard East LRT instead. The panel reported back to council on March 31, 2012.[31] At this council meeting, council approved light rail rather than a subway extension for Sheppard.[32] On April 26 of that year, the motion to build the LRT was announced by the Minister of Transportation after being approved unanimously by Metrolinx.[33] The plan still needs to be approved by Ontario's cabinet, though on June 29, 2012, the Board of Directors of Metrolinx unanimously approved the same motion approved by Metrolinx in April.[34]
Tory era and beyond
During the 2014 Toronto mayoral election, incumbent Rob Ford (and his brother Doug Ford after the prior's withdrawal) were the only major candidates who supported completing the Sheppard Line east to Sheppard and McCowan (phase one projects) and west to Downsview Station (phase two projects).[35] John Tory, who won the election, did not include anything on the Sheppard corridor in his maps. However, he did say that he would proceed with the LRT, although the project would not be a priority for him.[36]
On April 27, 2015, Steven Del Duca, the Ontario Minister of Transportation, said that the LRT project would not start until at least 2021. Another municipal election will be held in 2018.[37]
Service frequency
The frequency for this line is 5–6 minutes at all times.
On September 4, 2005, an overnight service on Sheppard Avenue East was introduced. The 385 Sheppard East Blue Night bus provides late-night service when the subway is not in operation with the frequency of 30 minutes. This service terminates at Sheppard–Yonge Station and follows Sheppard Avenue to Meadowvale.
See also
- Toronto rapid transit
- MoveOntario 2020
- Sheppard East LRT
- Transit-oriented development
- List of transport megaprojects
References
- ↑ Toronto Transit Commission Subway ridership, 2014
- 1 2 "Subway". Schedules & Maps. Toronto Transit Commission. Retrieved January 2015.
Line 4 Sheppard has five stations
- ↑ "Toronto Transit Commission - History". City of Toronto. Retrieved 2007-11-22.
- ↑ http://www3.ttc.ca/Subway/index.jsp
- ↑ http://www.citynews.ca/2013/10/23/ttc-considers-numbering-subway-lines/
- ↑ http://toronto.ctvnews.ca/ttc-tests-new-numerical-signage-system-1.1710500
- ↑ "New TTC Signage at Eglinton Station".
- ↑ Michael Smith. "$2.7 Billion Metro transit plan called affordable." Toronto Star. May 29, 1985. pg. A1
- ↑ Royson James. "Deciding which train to take." Toronto Star." March 8, 1994. pg. A15
- ↑ http://transit.toronto.on.ca/subway/5110.shtml
- ↑ http://www.concordadex.com/parkplace/discovery/
- 1 2 3 Tess Kalinowski (2015-05-18). "Could the Finch LRT reshape the Sheppard transit debate?". The Toronto Star. Retrieved 2015-05-19.
- ↑ http://www.ttc.ca/PDF/Transit_Planning/subway_ridership_2007-2008.pdf
- ↑ http://www.ttc.ca/PDF/Transit_Planning/Subway_ridership_2008-2009.pdf
- ↑ http://www.ttc.ca/PDF/Transit_Planning/Subway_ridership_2009-2010.pdf
- ↑ http://www.ttc.ca/PDF/Transit_Planning/Subway_ridership_2010-2011.pdf
- ↑ http://www.ttc.ca/PDF/Transit_Planning/Subway_ridership_2011-2012.pdf
- ↑ http://www.ttc.ca/PDF/Transit_Planning/Subway_ridership_2012-2013.pdf
- ↑ https://www.ttc.ca/PDF/Transit_Planning/Subway_ridership_2014.pdf
- ↑ "Stop the Sheppard LRT" Business Group Says
- ↑ Lewington, Jennifer; Gray, Jeff (July 20, 2007). "Toronto threatens to shut Sheppard subway". The Globe and Mail (Toronto).
- ↑ Morrow, Adrian. "Lessons from Toronto's Sheppard suwbay line". Retrieved 23 March 2013.
- ↑ http://www3.ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2009/December_16_2009/Reports/Yonge_University_Spa.pdf
- ↑ Kalinowski, Tess; Rider, David (2 December 2010). "‘War on the car is over': Ford moves transit underground". The Star (Toronto).
- ↑ "Search". The Globe and Mail (Toronto). December 21, 2010.
- ↑ "Toronto Mayor Rob Ford’s transit plan wins provincial approval" By John Lorinc and Adrian Morrow, The Globe and Mail, 30 March 2011
- ↑ "Funding questions linger after new transit plan announced" By Natalie Alcoba, National Post. March 31, 2011
- ↑ "Metrolinx / Toronto Transit Plan" Metrolinx. April 28, 2011
- ↑ Granatstein, Rob. "Rob Ford's Sheppard hole: Granatstein". Toronto Sun. Retrieved 4 April 2011.
- ↑ http://news.nationalpost.com/2012/01/23/save-money-on-eglinton-lrt-to-extend-sheppard-subway-ttc-chair-suggests/
- ↑ Kalinowski, Tess (February 9, 2012). "Special transit meeting: Mayor Rob Ford dismisses council’s vote against his subway plan". Toronto Star. Retrieved 9 Feb 2012.
- ↑ Kalinowski, Tess; Rider, David (March 22, 2012). "Rob Ford's subway dream dead as Toronto council votes 24-19 for LRT". Toronto Star (Toronto).
- ↑ http://news.ontario.ca/mto/en/2012/04/ministers-statement-on-toronto-transit-projects.html
- ↑ Eglinton Crosstown
- ↑ "Rob Ford unveils subway-heavy transit plan". CBC News. September 3, 2014. Retrieved June 12, 2015.
- ↑ Dale, Daniel (August 25, 2014). "Finch, Sheppard LRTs are election ‘hot potatoes’ again". Toronto Star. Retrieved June 12, 2015.
- ↑ Kalinowski, Tess (April 27, 2015). "Finch LRT to be complete in 2021, before Sheppard breaks ground". Toronto Star. Retrieved June 12, 2015.
Wikimedia Commons has media related to Sheppard line. |
External links
- Transit Toronto – The Sheppard subway
- Rapid Transit Expansion Study (Toronto Transit Commission, 2001). (PDF, 2.6 MB)
|