Proposed Melbourne rail extensions

Several proposals have been put forward by various groups to expand the Melbourne rail network—proposals for additional rail lines, extensions to existing lines, as well as electrification to existing lines and new stations on existing lines. Some of these plans were so seriously considered at various times that they appeared in the Melway street directory,[1] and on suburban train destination rolls.[2]

Proposals

Some of these proposals include:

Inner city

WestSouth East Rail Tunnel

NorthSouth Rail Tunnel

Western suburbs

Werribee line

Melton line

Northern suburbs

Melbourne Airport line

A rail link to the Melbourne Airport, branching off either the Albion–Jacana freight line or the Rail Tunnel at Sunshine under construction from Sunshine to Southern Cross (for the Regional Rail Link).[12]

Albion–Jacana line

Craigieburn line

A proposal made by Metro Trains CEO Andrew Lezala has been for an electrification of the Craigieburn line to Wallan.[18]

Upfield line

North-eastern suburbs

Diagram showing Melbourne's rail network, including former and planned lines

Doncaster line

Plans for the Doncaster line first appeared in the 1890s, when the Government was considering a line from Heidelberg Station. Plans again re-emerged in 1969, when The Age announced that the Victorian Railways had started detailed planning for the line, which would branch off the Hurstbridge/Epping lines at Victoria Park and run down the Eastern Freeway median strip,[21] then to Bulleen Road, Bulleen, where it would travel between houses and proposed tunnels to Doncaster East.[1]

By 1982 plans to build the line had been shelved by the state government, and by 1984 land for the line once it left the freeway had been sold.[21] More recent proposals have suggested the line would run in a tunnel from Bulleen Road to a station at Doncaster Hill (Shoppingtown), or branch from the proposed Jewell-Windsor line at Parkville station. In this case, an additional station would be built at Carlton before the line reaches the Eastern Freeway.

During the 2006 state election, the Victorian Liberal Party promised to extend the number 48 tram to Doncaster Hill, claiming that constructing the heavy rail line would cost around $1 billion and was deemed too expensive an option.[22]

In 2008, the Victorian Greens released The People Plan, a reflection of their official policies, which includes the Doncaster line as well as the extension of the number 48 tram. As of 2009, every transport advocacy group and the local councils affected, fully support the construction of the line in conjunction with the aim of promoting future transit-oriented development.

On Thursday 14 March 2013 the Minister for Public Transport released the Doncaster Rail Study Phase One Draft Recommendations Report. The study estimates daily patronage of up to 56,000 people.[23]

South Morang line

Hurstbridge line

Eastern suburbs

Lilydale line

Rowville

The 2012 Rowville Rail Study line suggested:[35]

Proposals for a Rowville line have been investigated by the Baillieu-Napthine Victorian Governments through the Rowville Rail Feasibility Study, with preparations for the confirmation of an alignment currently underway.[36]

Alamein line

South-eastern suburbs

Frankston and Stony Point line

Pakenham and Cranbourne line

Southern suburbs

St. Kilda Line

Although the St Kilda Line has been converted to Light Rail operation and is now part of Melbourne's Tram network, several proposals for rail extensions existed throughout its working life.

Port Melbourne Line

Although the Port Melbourne Line has been converted to Light Rail operation and is now part of Melbourne's Tram network, several proposals for rail extensions existed throughout its working life.

Infrastructure constructed for future projects, not used

[46]

Western and Southwestern suburbs

Werribee and Williamstown lines

Sunbury and Melton lines

Craigieburn and Upfield lines

North-eastern suburbs

Doncaster line

Hurtsbridge line

Some provision is made for duplication in sections Heidelberg–Rosanna and Greensborough–Eltham, with some bridges and other earthworks completed.

Eastern suburbs

Ringwood, Lilydale and Belgrave lines

Alamein and Glen Waverley lines

South-eastern suburbs

Frankston and Stony Point line

Pakenham and Cranbourne line

non-electrified Victorian routes

See also

References

  1. 1 2 "Railpage Australia Forums - Discussion on the 1979 Melway street directory". Retrieved 2007-07-30.
  2. "Vicsig - Destination Rolls". Retrieved 2007-07-30.
  3. 1 2 "The Victorian Transport Plan" (PDF). Retrieved 2008-12-11.
  4. 1 2 3 4 5 6 7 "The People Plan Discussion Paper" (PDF). Retrieved 2008-12-11.
  5. "Underground revolution - $2bn secret railway plan". The Age (Melbourne). 28 January 2007. Retrieved 2007-09-30.
  6. Moynihan, Stephen (16 August 2007). "New rail tunnel proposal gains momentum". The Age (Melbourne). Retrieved 2007-09-30.
  7. Melbourne Future Transport Options, Final Report: Professor Graham Currie, Institute of Transport Studies, Department of Civil Engineering, Monash University
  8. Kleinman, Rachel (20 July 2006). "Council proposes underground train line". The Age (Melbourne). Retrieved 2007-09-30.
  9. http://jp.metlinkmelbourne.com.au Metlink Journey Planner, Origin: 19-Brunswick Rd/Sydney Rd, Destination: 20-Domain Interchange/St Kilda Rd
  10. http://www.railpage.com.au/f-t14746.htm
  11. http://www.premier.vic.gov.au/newsroom/10660.html
  12. "STRONG SUPPORT FOR AIRPORT TRANSIT LINK". DoI media release. 6 April 2001. Retrieved 2007-07-30.
  13. http://www.planmelbourne.vic.gov.au/Plan-Melbourne
  14. http://www.theage.com.au/victoria/metro-rail-tunnel-plan-will-include-melbourne-airport-link-20140226-33ijg.html
  15. "Melbourne Airport railway line gets go-ahead". Australian Business Traveler. Retrieved 13 April 2014.
  16. "Premier Denis Napthine promises Melbourne airport rail link". The Age. Retrieved 13 April 2014.
  17. "Route chosen for Melbourne airport link". Perth Now. Retrieved 19 March 2013.
  18. http://www.heraldsun.com.au/news/metro-ceo-andrew-lezala-says-melbournians-need-to-get-out-of-their-cars-to-keep-the-city-moving/story-e6frf7jo-1226606451150
  19. Coburg Historical Society Newsletter, No 49, June 1997
  20. Greening Melbourne with Public Transport, Public Transport Users Association, 1991
  21. 1 2 Stephen Cauchi (February 1998). "Whatever Happened to the Proposed Railway to Doncaster East". Newsrail (Australian Railway Historical Society (Victorian Division)). pp. 41–42.
  22. Moynihan, Stephen (18 October 2006). "Rail line would replace 10,000 cars". The Age (Melbourne). Retrieved 2007-07-30.
  23. http://corp.ptv.vic.gov.au/projects/rail-projects/doncaster-rail-study/
  24. "Mernda Rail Extension". PTV website. Melbourne. 6 May 2015. Retrieved 2016-03-09.
  25. "Waiting for the train that never came". The Age (Melbourne). 24 October 2005. Retrieved 2007-07-30.
  26. "'BOOSTING MELBOURNE’S RAIL NETWORK' - March 2006" (PDF). MEETING OUR TRANSPORT CHALLENGES. Archived from the original (PDF) on 10 September 2006. Retrieved 2007-07-30.
  27. 1 2 3 http://www.railpage.com.au/f-t11314374.htm
  28. HAVE YOUR SAY: New station on track for Eltham if Libs win poll
  29. Yarra Ranges Council: Lilydale-Healesville 08-11-06 incorporating new trail costs report
  30. 1 2 3 C L Fouvy. "The Melbourne region's opportunity and need for rapid transit" (PDF). Railway Technical Society of Australasia. Retrieved 2008-07-18.
  31. Public Transport Users Association - Time to Move (2002)
  32. 1 2 "Knox City Council - Rowville Rail Study - 2004" (PDF). Retrieved 2007-07-30.
  33. http://www.monash.edu.au/news/show/community-shows-support-for-rowville-rail-link
  34. http://www.rowvillerail.org.au/
  35. http://ptv.vic.gov.au/projects/rail-projects/rowville-rail-feasibility-study/
  36. Millar, Royce (22 December 2005). "Chaddy about to get a whole lot bigger". The Age (Melbourne). Retrieved 2007-07-30.
  37. "City of Kingston Historical Website - 'Beaumaris Railway Spur'". Retrieved 2008-09-15.
  38. Grady, New Jersey (1985). "Electrification - Overhead Line Equipment for the Year 2050". Conference on Railway Engineering 1985
  39. "City of Kingston Historical Website - 'Railway Station at Bay Road'". Retrieved 2007-07-30.
  40. , additional text.
  41. http://pakenhamnews.starcommunity.com.au/news/2013-04-18/rail-upgrade-is-decades-away/
  42. 1 2 3 D.F. Jowett & I.G. Weickhardt (1978). Return To Rosstown – Railways, Land Sales and Sugar Beet Ventures in Caulfield. Rosstown Historical Research Group, Chapter 9.
  43. 1954 Planning Scheme, Melbourne Board of Works
  44. D.F. Jowett & I.G. Weickhardt (1978). Return To Rosstown – Railways, Land Sales and Sugar Beet Ventures in Caulfield. Rosstown Historical Research Group, Chapter 13.
  45. https://www.facebook.com/groups/VictorianRailwayEnthusiasts/permalink/897628230273200/

External links

This article is issued from Wikipedia - version of the Friday, April 22, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.