New York City Subway

New York City Subway

Top: A 6 train made up of R142A cars enters the Parkchester station.
Bottom: An E train made up of R160A cars waits for passengers at the 42nd Street – Port Authority Bus Terminal station.
Overview
Owner City of New York
Locale New York City
Transit type Rapid transit
Number of lines 34 lines[note 1]
(1 under construction)
24 services
(1 planned)[note 2]
Number of stations 469[1] (MTA total count)[note 3][note 4]
422[note 4][1] (when compared to international standards)
4 under construction[note 5]
14 planned[note 3]
Daily ridership 5,650,610 (weekdays, 2015)[1]
3,309,731 (Saturdays, 2015)[1]
2,663,418 (Sundays, 2015)[1]
Annual ridership 1,762,565,419 (2015)[1]
Website mta.info/nyct
Operation
Began operation October 27, 1904
(first underground section)
July 3, 1868
(first elevated, rapid transit operation)
October 9, 1863
(first railroad operation)[note 6]
Operator(s) New York City Transit Authority (NYCTA)
Number of vehicles 6,407[1]
Headway Peak hours: 2–5 minutes[5]
Off-peak: 10–20 minutes[5]
Technical
System length 233.5 mi (375.8 km)[6][7]
   (route length)
660 mi (1,060 km)[8][9]
   (track length, revenue)
846 mi (1,362 km)[8]
   (track length, total)
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge[8]
Electrification 625V (DC) third rail[8] (600V third rail for some lines)
Average speed 17 mph (27 km/h)[10]
Top speed 55 mph (89 km/h)[10]
System map

The New York City Subway is a rapid transit system owned by the City of New York and leased to the New York City Transit Authority,[11] a subsidiary agency of the state-run Metropolitan Transportation Authority.[12] Opened in 1904, the New York City Subway is one of the world's oldest public transit systems, one of the world's most used metro systems, and the metro system with the most stations and the most trackage.[13] It offers service 24 hours per day and every day of the year.[14]

The New York City Subway is the largest rapid transit system in the world by number of stations, with 469 stations in operation[14] (422, if stations connected by transfers are counted as single stations).[1] Stations are located throughout the boroughs of Manhattan, Brooklyn, Queens, and the Bronx. While Staten Island does have a rail line, the Staten Island Railway, it is not officially considered part of the subway, due to its lack of any direct rail link with the subway system, so any passengers wishing to reach another borough must take a ferry or bus.[14] The Port Authority Trans-Hudson[15] and the AirTrain JFK,[16] in Manhattan and Queens respectively, accept the subway's MetroCard but are not part of the subway;[17] thus, free transfers are not allowed.

The system is also one of the world's longest. Overall, the system contains 233 miles (375 km) of routes,[6][8] translating into 660 miles (1,060 km) of revenue track;[8][9] and a total of 846 miles (1,362 km) including non-revenue trackage.[8]

By annual ridership, the New York City Subway is the busiest rapid transit rail system in the United States and in the Western world, as well as the seventh busiest rapid transit rail system in the world; the metro (subway) systems in Beijing, Seoul, Shanghai, Moscow, Tokyo, and Guangzhou record a higher annual ridership.[18] In 2015, the subway delivered over 1.76 billion rides, averaging approximately 5.7 million daily rides on weekdays and a combined 5.9 million rides each weekend (3.3 million on Saturdays; 2.7 million on Sundays).[1] Ridership continues to increase, and on September 23, 2014, more than 6.1 million people rode the subway system, establishing the highest single-day ridership since ridership was regularly monitored in 1985.[19][note 7]

All services pass through Manhattan except for the G train, the Franklin Avenue Shuttle, and the Rockaway Park Shuttle. Large portions of the subway outside Manhattan are elevated, on embankments, or in open cuts, and a few stretches of track run at ground level. In total, 40% of track is not underground despite the "subway" moniker.[20] Many lines and stations have both express and local services. These lines have three or four tracks. Normally, the outer two are used for local trains, while the inner one or two are used for express trains. Stations served by express trains are typically major transfer points or destinations.[14]

History

The City Hall station of the IRT Lexington Avenue Line opened on October 27, 1904.

A demonstration for an underground transit system in New York City was first built by Alfred Ely Beach in 1869 and opened in February 1870.[21][22] His Beach Pneumatic Transit only extended 312 feet (95 m) under Broadway in Lower Manhattan operating from Warren Street to Murray Street[23] and exhibited his idea for a subway propelled by pneumatic tube technology. The tunnel was never extended for political and financial reasons, although extensions had been planned to take the tunnel southward to The Battery and northwards towards the Harlem River.[24] In 1912, workers excavating for the present-day BMT Broadway Line dug into the old Beach tunnel; today, no part of this line remains as the tunnel was completely within the limits of the present day City Hall Station under Broadway.[25][26][27][28]

The Great Blizzard of 1888 helped demonstrate the benefits of an underground transportation system.[29] A plan for the construction of the subway was approved in 1894, and construction began in 1900.[30] The first underground line of the subway opened on October 27, 1904, almost 36 years after the opening of the first elevated line in New York City, which became the IRT Ninth Avenue Line.[31][32][33] Opening prices for a ride cost riders $0.05[34] and in the first day alone carried over 150,000 passengers.[35] The oldest structure still in use opened in 1885 as part of the BMT Lexington Avenue Line in Brooklyn[36][37][38][39][40] and is now part of the BMT Jamaica Line.[41] The oldest right-of-way, which is part of the BMT West End Line near Coney Island Creek, was in use in 1864 as a steam railroad called the Brooklyn, Bath and Coney Island Rail Road.[42][43][44]

By the time the first subway opened, the lines had been consolidated into two privately owned systems, the Brooklyn Rapid Transit Company (BRT, later Brooklyn–Manhattan Transit Corporation (BMT)) and the Interborough Rapid Transit Company (IRT). The city was closely involved: all lines built for the IRT and most other lines built or improved for the BRT after 1913 were built by the city and leased to the companies.[45] The first line of the city-owned and operated Independent Subway System (IND) opened in 1932;[46] this system was intended to compete with the private systems and allow some of the elevated railways to be torn down, but stayed within the core of the City due to the low amount of startup capital provided to the municipal Board of Transportation (the later MTA) by the state.[11] This required it to be run 'at cost', necessitating fares up to double the five-cent fare popular at the time.[47]

In 1940, the two private systems were bought by the city and some elevated lines ceased service immediately while others closed soon after.[48] Integration was slow, but several connections were built between the IND and BMT;[49][50][51] these now operate as one division called the B Division. Since the IRT tunnels, sharper curves, and stations are too small and therefore can not accommodate B Division cars, the IRT remains its own division, the A Division.[52] However, many passenger transfers between stations of all three former companies have been created, allowing the entire network to be treated as a single unit.[53]

The New York City Transit Authority (NYCTA), a public authority presided by New York City, was created in 1953 to take over subway, bus, and streetcar operations from the city, and placed under control of the state-level Metropolitan Transportation Authority in 1968.[53][54]

Graffiti became a notable symbol of declining service during the 1970s.

Organized in 1934 by transit workers of the BRT, IRT, and IND,[55] the Transport Workers Union of America Local 100 remains the largest and most influential local of the labor unions.[56] Since the union's founding, there have been three union strikes over contract disputes with the MTA:[57] 12 days in 1966,[58][59] 11 days in 1980,[60] and three days in 2005.[61][62]

By the 1970s and 1980s, the New York City Subway was at an all-time low.[63][64] Ridership had dropped to 1910s levels, and graffiti and crime were rampant on the subway; in general, the subway was very poorly maintained during that time, and delays and track problems were common. Still, the NYCTA managed to open six new subway stations in the 1980s,[65][66] as well as order 1,775 new, graffiti-free subway cars.[67] By the early 1990s, conditions had improved significantly, although maintenance backlogs accumulated during those 20 years are still being fixed today.[64]

The Cortlandt Street station partially collapsed as a result of the collapse of the World Trade Center.

As the system entered the 21st century, it continued to progress despite weathering several disasters. The September 11 attacks resulted in service disruptions on lines running through Lower Manhattan, particularly the IRT Broadway – Seventh Avenue Line, which ran directly underneath the World Trade Center between the Chambers Street and Rector Street stations.[68] Sections of the tunnel, as well as the Cortlandt Street station, which was directly underneath the Twin Towers, were severely damaged by the collapse and had to be rebuilt, requiring suspension of service on that line south of Chambers Street. Ten other nearby stations were closed while dust and debris were cleaned up. By March 2002, seven of those stations had reopened. The rest (except for Cortlandt Street on the IRT Broadway – Seventh Avenue Line)[69] reopened on September 15, 2002, along with service south of Chambers Street.[69][70] In 2012, Hurricane Sandy wreaked havoc on the subway system, flooding several underwater tunnels and other vulnerable locations near New York Harbor. Although the immediate damage was fixed within six months, long-term resiliency and rehabilitation projects continue to this day.[71]

Construction methods

A stretch of subway track on the 7 Subway Extension.

When the IRT subway debuted in 1904,[31][32] the typical tunnel construction method was cut-and-cover.[72][73] The street was torn up to dig the tunnel below before being rebuilt from above.[72][73] Traffic on the street above would be interrupted due to the digging up of the street.[74] Temporary steel and wooden bridges were built so that streetcar and vehicular traffic could operate above the construction.[75]

Contractors in this type of construction faced many obstacles, both natural and man-made. They had to deal with rock formations, and ground water, which meant that they had to build pumps in order to keep water out of the system. Additionally, 12 miles of sewers, as well as water and gas mains, electric conduits, and steam pipes had to be rerouted. In order for the street above to be torn up to allow for cut-and-cover to be done, street railways had to be torn up. The foundations of tall buildings often ran near the subway construction, which meant that engineers in some cases had to underpin the buildings in order to ensure the stability of the buildings and the subway.[76]

This method worked well for digging soft dirt and gravel near the street surface.[72] However, mining shields were required for deeper sections, such as the Harlem and East River tunnels, which used cast-iron tubes, segments between 33rd and 42nd streets under Park Avenue, 116th Street and 120th Street under Broadway, and 145th Street and Dyckman Street (Fort George) under Broadway and Saint Nicholas Avenue as well as the tunnel from 96th Street to Central Park North – 110th Street & Lenox Avenue, all of which used either rock or concrete-lined tunnels.[72][73]

About 40% of the subway system runs on surface or elevated tracks, including steel or cast iron elevated structures, concrete viaducts, embankments, open cuts and surface routes.[77] All of these construction methods are completely grade-separated from road and pedestrian crossings, and most crossings of two subway tracks are grade-separated with flying junctions. The sole exceptions of at-grade junctions of two lines in regular service are the 142nd Street junction[78] and the Myrtle Avenue junction, whose tracks both intersect at the same level.[79]

The 7,700 workers who built the original subway lines were mostly immigrants living in Manhattan.[30] [80]

More recent projects use tunnel boring machines (construction with which comes at a higher cost than construction with cut-and-cover does) to build the subway tunnels to minimize disruption at street level, but also to avoid already existing utilities.[81] Examples of such projects include the extension of the IRT Flushing Line[82][83][84][85] and the IND Second Avenue Line.[86][87][88][89]

Expansion

Second Avenue Subway Community Information Center

Since the opening of the original New York City Subway line in 1904,[31][32] various official and planning agencies have proposed numerous extensions to the subway system. One of the more expansive proposals was the "IND Second System", part of a plan to construct new subway lines in addition to taking over existing subway lines and railroad rights-of-way. The most grandiose IND Second Subway plan, conceived in 1929, was to be part of the city-operated IND, and was to comprise almost 13 of the current subway system.[90][91] By 1939, with unification planned, all three systems were included within the plan, which was ultimately never carried out.[92][93] Many different plans were proposed over the years of the subway's existence, but expansion of the subway system mostly stopped during World War II.[94]

Though most of the routes proposed over the decades have never seen construction, discussion remains strong to develop some of these lines, to alleviate existing subway capacity constraints and overcrowding, the most notable being the Second Avenue Subway. Plans for new lines date back to the early 1910s, and expansion plans have been proposed during many years of the system's existence.[90][95]

After the IND Sixth Avenue Line was completed in 1940,[96] the city went into great debt, and only 29 new stations have been added to the system since. Five stations were on the abandoned New York, Westchester and Boston Railway-operated IRT Dyre Avenue Line,[97] fourteen stations were on the abandoned LIRR Rockaway Beach Branch (now the IND Rockaway Line),[98] six were on the Archer Avenue Lines[99] and 63rd Street Lines[100] (built as part of a 1968 plan), two stations (57th Street and Grand Street) were part of the Chrystie Street Connection,[101][102] the Harlem – 148th Street terminal,[103] and the 7 Subway Extension to the west side of Manhattan.[104][note 8]

Lines and routes

A digital sign on the side of an R142 train on the 4

Many rapid transit systems run relatively static routings, so that a train "line" is more or less synonymous with a train "route". In New York City, however, routings change often because of changes in the availability of connections or the setup of service patterns. Within the nomenclature of the subway, the "line" describes the physical railroad track or series of tracks that a train "route" uses on its way from one terminal to another. "Routes" (also called "services") are distinguished by a letter or a number and "Lines" have names. They are also designations for trains, as exemplified in the Billy Strayhorn song "Take the "A" Train".[14]

There are 24 train services in the subway system, including three short shuttles. Each route has a color and a local or express designation representing the Manhattan trunk line of the particular service. The color lime green is exclusively assigned to the Crosstown Line route, which operates entirely outside Manhattan, while the shuttles are all assigned dark slate gray.[109][110] The lines and services are not referred to by color (e.g., Blue Line or Green Line) by native New Yorkers or by most New York City residents, but out-of-towners and tourists often refer to the subway lines by color.[14][111][112]

The 1, 6, 7, C, G, L, M and R trains are fully local and make all stops. The 2, 3, 4, 5, <6>, <7>, A, B, D, E, F, N and Q trains have portions of express and local service. The J train normally operates local, but during rush hours it is joined by the Z train in the peak direction; both the J and Z run local, express or skip-stop on different parts of their shared route. The letter S is used for three shuttle services: Franklin Avenue Shuttle, Rockaway Park Shuttle, and 42nd Street Shuttle.[110][113]

Though the subway system operates on a 24-hour basis,[14] some of the designated routes do not run, run as a shorter route (often referred to as the 'shuttle train' version of its full-length counterpart) or run with a different stopping pattern during late night hours (usually indicated by smaller, secondary route signage on station platforms).[110][114] In addition to these regularly scheduled changes, because there is no nightly system shutdown for maintenance, tracks and stations must be maintained while the system is operating. To accommodate such work, services are usually changed during midday, overnight hours, and weekends.[115][116]

When parts of lines are temporarily shut down for construction purposes, the transit authority substitutes free shuttle buses (using MTA Regional Bus Operations bus fleet) to replace the routes that would normally run on these lines.[117] The transit authority announces planned service changes through its website,[118] via placards that are posted on station and interior subway-car walls,[119] and through its Twitter page.[120]

Map of line elevation in relation to the ground. Underground is the segments in orange, and aboveground, at grade, embankment, or open cut is the segments in blue.

Trunk lines

Subway map

Stations

7 train arriving at Vernon Boulevard – Jackson Avenue station (43s)

Most of the 469 stations are served 24 hours a day.[note 9] Underground stations in the New York City Subway are typically accessed by staircases going down from street level. Many of these staircases are painted in a common shade of green, with slight or significant variations in design.[121] Other stations have unique entrances reflective of their location or date of construction. Several station entrance stairs, for example, are built into adjacent buildings.[121] Nearly all station entrances feature color-coded globe or square lamps signifying their status as an entrance.[122]

The long and wide mezzanine in the West Fourth Street station in Greenwich Village.

Out of all the stations on the New York City Subway,

This means that 61% of the stations are below the surface (59% being fully underground and approx 2% being sub surface stations). 39% of stations are above the surface or overground.[123]

Concourse

Many stations in the subway system have mezzanines.[124] In underground stations, this typically consists of the first level below the street or the areas between the street and platform level. For open-cut, grade-level and elevated stations, prevalent in uptown Manhattan and the outer boroughs, the mezzanine area often consists of a station house at street level or above the street.[125][126] Mezzanines allow for passengers to enter from multiple locations at an intersection and proceed to the correct platform without having to cross the street before entering. At busy intersections, they also act as a pedestrian underpass or overpass. They also allow for crossover between directions of service, or for transfers between different stations of a complex. Inside mezzanine's are fare control areas, where passengers physically pay their fare to enter the subway system.[73][124][127] In underground subway stations built close to ground level or under narrow streets, a characteristic of early IRT and BMT construction, the fare control area is at platform level with no mezzanine crossovers.[73][128] Many elevated stations also have platform-level fare control with no common station house between directions of service.[41]

Upon entering a station, passengers may use station booths (formerly known as token booths)[129] or vending machines to buy their fare, which is currently stored in a MetroCard. Each station has at least one booth, typically located at the busiest entrance.[130] After swiping the card at a turnstile, customers enter the fare-controlled area of the station and continue to the platforms.[14] Inside fare control are "Off-Hours Waiting Areas", which consist of benches and are identified by a yellow sign.[14][131][132]

Platforms

A typical subway station has waiting platforms ranging from 480 to 600 feet (150 to 180 m) long, though some IND platforms may be as long as 660 to 745 feet (201 to 227 m) long.[47][133] Platforms of former commuter rail stations, such as those on the IND Rockaway Line, are even longer. Due to the large number of transit lines, one platform or set of platforms often serve more than one service. Passengers need to look at the overhead signs at the platform entrance steps and over each track to see which trains stop there and when, and at the arriving train to see which one it is.[14]

There are a number of common platform configurations:

Accessibility

Street elevator serving as an entrance to the 66th Street – Lincoln Center station

Since the majority of the system was built before 1990, the year the Americans with Disabilities Act (ADA) went into effect, many New York City Subway stations were not designed to be handicapped-accessible.[134] Since then, elevators have been built in newly constructed stations to comply with the ADA. (Most grade-level stations required little modification to meet ADA standards.) In addition, the MTA identified "key stations", high-traffic and/or geographically important stations, which must conform to the ADA when they are extensively renovated. As of March 2016, there are 103 currently accessible stations; many of them have AutoGate access.[14][135] Under the current MTA plans, the number of ADA accessible stations will go up to 144 by 2020.[136]

Rolling stock

An A train made of R32 cars in Downtown Brooklyn
Interior of an R142A train car
Interior of an R62 subway car.

As of December 2015, the New York City Subway has 6,407 cars on the roster.[137][138] A typical New York City Subway train consists of 8 to 11 cars, although shuttles can have as few as two, and the train can range from 150 to 600 feet (46 to 183 m) in length.[139]

Driver's cab of an R160B subway car on the N train

The system maintains two separate fleets of cars, one for the A Division routes and another for the B Division routes.[140] All B Division equipment is about 10 feet (3.05 m) wide and either 60 feet 6 inches (18.44 m) or 75 feet (22.86 m) long, whereas A Division equipment is approximately 8 feet 9 inches (2.67 m) wide and 51 feet 4 inches (15.65 m) long.[141] There is also a special fleet of B Division cars that is used for operation in the BMT Eastern Division, consisting of R32 and R42 cars in married pairs, and R143 and R160A cars in four-car sets. Due to clearance issues on various sharp curves, 75-foot (22.86 m) long cars are not permitted on BMT Eastern Division trackage.[142][143]

Cars purchased by the City of New York since the inception of the IND and the other divisions beginning in 1948 are identified by the letter "R" followed by a number; e.g.: R32.[140] This number is the contract number under which the cars were purchased.[144] Cars with nearby contract numbers (e.g.: R1 through R9, or R26 through R29, or R143 through R160B) may be relatively identical, despite being purchased under different contracts and possibly built by different manufacturers.[145]

The MTA has been incorporating newer subway cars into its stock since the late 1990s. Since 1999, the R142, R142A, R143, R160, and R188 cars have been placed into service.[146][147] These cars are collectively known as New Technology Trains (NTTs) due to modern innovations such as LED and LCD route signs and information screens, as well as recorded train announcements and the ability to facilitate Communication-Based Train Control (CBTC).[148][149] The recorded announcements are used for station information, closing doors, and other general messages in lieu of conductor announcements, although live conductor announcements can still be made. The recordings began in the late 1990s and featured Bloomberg Radio on-air speakers, who volunteered at the request of their employer Michael Bloomberg, who would later become mayor of New York City.[149] Voices include Jessica Ettinger Gottesman, Diane Thompson, Charlie Pellett, Catherine Cowdery, and Melissa Kleiner.[149][150] Female voices are typically used for station, route and transfer announcements. Pellett's recordings are used for most of the remaining announcements, most notably "Stand clear of the closing doors, please" prior to train doors closing.[149][150][151] With regards to why certain messages are voiced by males and others by females, MTA spokesperson Gene Sansone said in 2006 that, "Most of the orders are given by a male voice, while informational messages come from females. Even though this happened by accident, it is a lucky thing because a lot of psychologists agree that people are more receptive to orders from men and information from women".[150][152]

On March 24, 2012, the MTA announced that it ordered 300 R179 subway cars from Bombardier.[153] The total price of the contract is US$599 million, with the first test train of ten cars arriving in June 2016, due to ongoing delivery problems.[154][155]

Fares

Riders pay a single fare to enter the subway system and may transfer between trains at no extra cost until they exit via station turnstiles; the fare is a flat rate regardless of how far or how long the rider travels. Thus, riders must swipe their MetroCard upon entering the subway system, but not a second time upon leaving.[156]

As of April 2016, nearly all fares are paid by MetroCard;[157] the base fare is $2.75 when purchased in the form of a reusable "pay per ride" MetroCard,[156] with the fare increase occurring on March 22, 2015.[158] Single-use cards may be purchased for $3.00, and 7-day and 30-day unlimited ride cards can lower the effective per-ride fare significantly.[159] Reduced fares are available for the elderly and people with disabilities.[14][160]

The current MetroCard design

MetroCard

In November 1993,[161] the subway system introduced a fare system called the MetroCard, which allows riders to use cards that store the value equal to the amount paid to a station booth clerk or vending machine.[162] The MetroCard was enhanced in 1997 to allow passengers to make free transfers between subways and buses within two hours; several MetroCard-only transfers between subway stations were added in 2001.[163][164] With the addition of unlimited-ride MetroCards in 1998 (for 7-day and 30-day periods,[165] later 1-day "Fun Pass" and 14-day periods, both of which have been discontinued),[166] the New York City Transit system was the last major transit system in the United States with the exception of BART in San Francisco to introduce passes for unlimited bus and rapid transit travel.[167] In January 2014, the MTA stated that it wants to implement a contactless fare system to replace the MetroCard by 2019.[168][169][170]

Modernization

This is a punch box, used for signaling to a tower operator which line the train should use at a junction. This technology is no longer in use on the IRT (A Division); the signal system that allows countdown clocks also automates train identification and switching.

FASTRACK

FASTRACK on the IND Eighth Avenue Line

In January 2012,[171][172] the MTA introduced a new maintenance program, FASTRACK, to speed up repair work. This program involves a more drastic approach than previous construction, and completely shuts down a major portion of a line for overnight work on four consecutive weeknights from 10 p.m. to 6 a.m.[173] According to the MTA, this new program proved much more efficient and quicker than regular service changes, especially because it happened at night and not the weekend, when most transit closures had occurred before.[174] In 2012 the program only closed lines in Midtown and Lower Manhattan,[175][176][177][178][note 10] while in 2013 it expanded to other corridors requiring minimal shuttle buses[179][note 11] and in 2014 to even more locations.[180] There were corridors scheduled for 2014 during 24 weeks of the year,[note 12] and in 2015 there were 12 corridors scheduled during 22 weeks.[181] In 2016, there are 13 corridors scheduled during 21 weeks.[182]

Technology

New train arrival signs on the BMT Canarsie Line
RFID trial on the IRT Lexington Avenue Line

Train arrival "countdown clocks"

In 2003, the MTA signed a $160 million contract with Siemens Transportation Systems to install digital real-time message boards at 158 of its IRT stations to display the number of minutes until the arrival of the next trains.[183] Payments to the company were stopped in May 2006 following many technical problems and delays[184] and MTA started to look for alternative suppliers and technologies.[183] In January 2007 Siemens announced that the issues had been resolved and that screens would start appearing at 158 stations by the end of the year.[185] In 2008, the system-wide roll-out was pushed back again, to 2011, with the MTA citing technical problems.[186][187]

An in-house simpler system developed by MTA for the L trains was operational by early 2009[183][188] and the first three displays of the larger Siemens system became operational at stations on the IRT Pelham Line (6 <6> trains) in the Bronx in December 2009.[189] Siemens signs were in operation in 110 A Division stations by March 2011[190][191][192][193][194][195] and in 153 IRT mainline and 24 Canarsie Line stations by late 2011.[196] Similar, but simpler countdown clocks are used at thirteen stations on the IND Queens Boulevard Line, three stations on the BMT Broadway Line, nineteen stations on the IND Eighth Avenue Line[196] and five stations on the BMT Astoria Line.[197] The announcements are voiced by radio traffic reporter Bernie Wagenblast[198] and Carolyn Hopkins.[199]

In 2012, real-time station information for the 1 through 6 trains and the 42nd Street Shuttle was made available, through MTA's 'Subway Time' mobile app and as open data, to third party developers via a API.[200] In early 2014, data for the L train were also given to developers.[201]

Displays at 22 IRT Flushing Line and the 5 IRT Dyre Avenue Line stations are not expected to be operational until the late 2010s, with the delay being attributed to upgrades to upgrading the signal system with CBTC for the IRT Flushing Line stations and to signal modernizations for IRT Dyre Avenue Line stations.[202] Displays at 267 B Division stations will be installed as part of the 2015–2019 capital funding program.[203] Upon the October 2015 approval of funding for the 2015–2019 capital program, full installation of the countdown clocks was deferred to beyond 2020, with 320 out of 469 stations having countdown clocks by then.[204] This was attributed to the rate of installation of wi-fi and 3G systems in subway stations, which, among other things, makes countdown clocks viable.[205] The B, D, N, and Q were expected to get countdown clocks in 2016.[205] Meanwhile, the IRT Flushing Line (7 <7>) was to get the clocks in 2018, a delay from an earlier announced date of 2016.[205]

PayPass trials

The MTA signed a deal with MasterCard in the first few months of 2006 to test out a new RFID card payment scheme.[206] Customers had to sign up at a special MasterCard website and use a MasterCard PayPass credit or debit card/tag to participate. Participating stations included IRT Lexington Avenue Line (4 5 6 <6> trains) from the Third Avenue – 138th Street and 138th Street – Grand Concourse stations in the Bronx to Borough Hall in Brooklyn, as well as the Court Square – 23rd Street in Queens for the E M 7 <7> trains.[207] Originally scheduled to end in December 2006, the trial was extended into 2007 due to "overwhelming positive response".[208]

In light of the success of the first Paypass pilot project in 2006, another trial was started by the MTA. This one started on June 1, 2010, and ended on November 30, 2010. The first two months started with the customer just using the MasterCard PayPass debit or credit card.[209][210][211][212] However, this trial was the debut of having a rider use the VISA PayWave debit or credit card to enter the system, which started on August 1, 2010.[213] For six months, a rider could use either a MasterCard Paypass or VISA PayWave credit/debit card to pay for a fare on an expanded list of subway and bus routes.[214][215][note 13]

Help Point

The Help Point at the Smith–Ninth Streets station

The MTA set up another technology pilot project for the New York City Subway called "Help Point" on April 5, 2011. Help Point is a new digital-audio communications system for use in case of an emergency or to obtain subway information for travel directions.[216] The top button is labeled red for emergencies and connects to the Rail Control Center. The bottom button is labeled green and connects to a MTA station agent for any inquiries. All units are equipped with a microphone and speaker,[217] and can optionally be installed with a camera.[218] Also, the test units were equipped for the hearing impaired (under ADA compliance).[219]

The two subway stations that were part of this trial were on the IRT Lexington Avenue Line. They were the 23rd Street and the Brooklyn Bridge – City Hall stations. The Help Points at the Brooklyn Bridge – City Hall station were wireless, while those at the 23rd Street station ones were hard-wired, to test which type of transmission is best for the subway.[220][221]

After the Help Point test was successfully completed, the MTA started to install Help Points in all 469 subway stations to replace the existing Customer Assistance Intercom (CAI) units.[220] The help points were to be installed in 139 stations by 2014, and the remaining 333 stations would have Help Points by the end of 2019.[222]

On The Go! Travel Station

The On the Go! Travel Station in use at the Bowling Green station

On September 19, 2011, the MTA set up another pilot project, an online, interactive touchscreen computer program called "On The Go! Travel Station" (OTG). It lists any planned work or service changes occurring on the subway as well as information to help travelers find landmarks or locales near the stations with an OTG outlet, with advertisements as well. The first station to test this new technology was Bowling Green on the IRT Lexington Avenue Line.[223] Other stations scheduled to participate in this program were Penn Station (with the LIRR), Grand Central Terminal (with Metro-North), Atlantic Avenue – Barclays Center in Brooklyn, and Jackson Heights – Roosevelt Avenue / 74th Street – Broadway in Queens.[168][224]

New and existing On the Go! kiosks were to receive an interface overhaul as a result of the MTA's partnership with Control Group, a technology and design consultancy firm. Control Group were adding route lookups, countdown to train arrivals, and service alerts. Between 47 and 90 interactive wayfinding kiosks were scheduled to be deployed in 2013.[225] As of January 2016, there are 155 kiosks at 131 stations.[226]

Cellular phone and wireless data

An indoor antenna which is part of the distributed antenna system installed by Transit Wireless inside a station

New York City Subway began to provide underground cellular phone with voice and data service, and free Wi-Fi to passengers in 2011 at six stations. The new network was installed and owned by Transit Wireless as part of company's $200 million investment. The company expanded the services to 30 more stations in 2013[227][228] and signed an agreement with all 4 major wireless network operators to allow their cellular phone customers to use its network. The MTA and Transit Wireless are splitting the fees received from those wireless carriers for the usage of the network.[229] The Wi-Fi service, which operates using antennae,[230] is operated by Boingo Wireless.[231]

Transit Wireless expects to provide service to the remaining 241 underground stations by 2017, including the four deep-level subway stations under construction. The next 40 key stations (11 in midtown Manhattan and 29 in Queens) have antennas which are in service as of March 2014.[168][232] The wireless for these 40 underground stations were completed by October 2014. Phase III of the project was completed in March 2015 and added service to the Flushing-Main St station in Queens, as well as stations in Lower Manhattan, West Harlem and Washington Heights.[233] Phase IV of the project will cover 20 underground stations in the Bronx, and 17 in Upper Manhattan. The phase will provide service to major stations such as Lexington Avenue – 53rd Street, Lexington Avenue – 59th Street, 149th Street – Grand Concourse, and 125th Street. Phases 6 and 7 of the Transit Wireless network build-out will connect the 90 remaining Brooklyn and Manhattan underground stations in 2017, about one year ahead of schedule.[233]

Safety and security

Crime, train accidents, suicides and threats of terrorism all impact the subway system.

Signalling

Manual signalling

The system currently uses Automatic Block Signaling with fixed wayside signals and automatic train stops in order to provide safe train operation across the whole system.[234] The New York City Subway system has, for the most part, used block signalling since its 1904 opening,[31][32] and many portions of the signaling system were installed between the 1930s and 1960s. Because of the age of the subway system, some replacement parts must be custom built for the MTA, as they are otherwise unavailable from signaling suppliers. Additionally, some subway services have reached their train capacity limits and cannot operate extra trains with the current Automatic Block Signaling system. As of May 2014, the system consists of about 14,850 signal blocks, 3,538 mainline switches, 183 major track junctions, 10,104 automatic train stops, and 339,191 signal relays.[235]

These signals work by preventing trains from entering a "block" occupied by another train. Typically, the blocks are 1,000 feet (300 m) long, although some highly used lines, such as the IRT Lexington Avenue Line, use shorter blocks.[236] Insulators divide the track segments into blocks. The two traveling rails conduct an electric current, as they are connected to an electric current. If the circuit is closed and electricity can travel across the rails without interruption, the signal will light up as green, as it is unoccupied by a train. When a train enters the block, the metal wheels interrupt the current on the rails, and the signal turns red, marking the block as occupied. The train's maximum speed will depend on how many blocks are open in front of it. However, the signals do not register the trains' speed, nor do they register where in the block the train is located.[235][237]

Subway trains are stopped mechanically at all signals showing "stop" aspects by automatic train stops located on the right side of IRT tracks and the left side of BMT/IND tracks; all cars are equipped with tripcocks. Although this is a simple principle of train stops, that wayside trippers must not be moved to trip ("stop") position until it is guaranteed that the train has fully passed the signal with all its cars.[238][239]

Today, the majority of all subway delays are caused by signal problems. Whenever a signal stops working, all of the signals behind of it turn red, as it is uncertain whether there is a train in that section.[239]

Automation

In the late 1990s and early 2000s, the MTA began the process of automating the subway through the use of Communication-Based Train Control (CBTC). Under CBTC, the fixed-block signal system is removed. Instead, every train has a radio and an onboard computer installed that identifies the precise the location of the train. At the central control center, in real time, this information is used to decide how fast the trains should go to most effectively use the track. Trains, with CBTC, can then operate closer together. With the new system, signals and interlockings aren't needed anymore, with the only requirement being that there are trackside controllers, controllers on the train, and a central control center. Since the location of the trains would be known, real time information would be available so that passengers would know how long it would take for the next train to arrive. The MTA's form of CBTC uses a reduced form of the old fixed-block signaling system, requiring that both be maintained at high cost.[239]

The BMT Canarsie Line, on which the L train runs, was chosen for CBTC pilot testing because it is a self-contained line that does not operate in conjunction with other subway lines in the system. First proposed in 1992 and approved by the MTA in 1997,[239][240] the installation of the signal system was begun in 1999 and was mostly completed by December 2006.[241] CBTC became operational in February 2009.[242] Due to an unexpected ridership increase on the Canarsie Line, the MTA ordered additional cars, the R160s, and these were put into service in 2010, enabling the agency to operate 26 trains per hour, up from the May 2007 service level of 15 trains per hour—an achievement that would not be possible without the CBTC technology.[241] The total cost of the project was $340 million.[239]

After the success of the BMT Canarsie Line automation, the IRT Flushing Line, carrying the 7 <7> trains, was next chosen to be outfitted with CBTC.[243] Eventually, the MTA has plans to eventually automate a much larger portion, using One Person Train Operation (OPTO) in conjunction with CBTC. Siemens Transportation Systems built the CBTC system on the Canarsie line. Thales is building the CBTC system for the Flushing Line. In late winter 2008, the MTA embarked on a 5-week renovation and upgrade project on the 7 <7> trains between Flushing – Main Street and 61st Street – Woodside to upgrade signaling and tracks for CBTC. On February 27, 2008, the MTA issued an Accelerated Capital Program to continue funding the completion of CBTC for the 7 <7> trains and to begin on the IND Queens Boulevard Line (E F trains). The proposed plan is estimated to cost US $1.4 million.[244] At the current pace of installation, it would take 175 years for CBTC to be installed at a cost of $20 billion.[239]

The New York City Subway uses a system known as Automatic Train Supervision (ATS) for dispatching and train routing on the A Division[245] (the Flushing line, and the trains used on the 7 <7> services, do not have ATS.)[245] ATS allows dispatchers in the Operations Control Center (OCC) to see where trains are in real time, and whether each individual train is running early or late.[245] Dispatchers can hold trains for connections, re-route trains, or short-turn trains to provide better service when a disruption causes delays.[245]

Train accidents

Even though a signal system is in place to ensure safe operation, throughout the history of the New York City Subway, including its predecessors, there have been at least 64 major train accidents since 1918, when a train bound for South Ferry smashed into two trains halted near Jackson Avenue on the IRT White Plains Road Line in the Bronx.[246] Several accidents resulted when the train operator ran through red signals resulting in it rear-ending the subway train in front of it; this resulted in the signaling practice of keying by, which allowed train operators to bypass red signals. The deadliest accident, the Malbone Street Wreck, occurred on November 1, 1918 beneath the intersection of Flatbush Avenue, Ocean Avenue, and Malbone Street (the latter of which is now Empire Boulevard) near the Prospect Park station of the then-BRT Brighton Line in Brooklyn, killing 93 people.[247] As a result of accidents, such as the 1995 Williamsburg Bridge crash, timer signals were installed in order to ensure safer operation. However, these signals have resulted in reduced speeds across the system. Accidents, such as derailments, have also resulted due to broken equipment, such as the rails and the train itself.[246]

Passenger safety

Yellow platform edges, yellow staircase steps and yellow railings, painted for safety, at the IRT Broadway – Seventh Avenue Line platform at 168th Street

Track safety and suicides

A portion of subway-related deaths in New York consists of suicides committed by jumping in front of an oncoming train. Between 1990 and 2003, 343 subway-related suicides have been registered out of a citywide total of 7,394 (4.6%) and subway-related suicides increased by 30%, despite a decline in overall suicide numbers.[248]

Due to increase in people hit by trains in 2013,[249] in late 2013 and early 2014 the MTA started a test program at one undisclosed station, with four systems and strategies to eliminate the number of people hit by trains. Closed-circuit television cameras, a web of laser beams stretched across the tracks, radio frequencies transmitted across the tracks, and thermal imaging cameras focused on the station's tracks were set to be installed at that station.[168] At the unidentified station, which is rumored to be Rector Street, tests have gone so well at the testing site that these track protection systems will be installed systemwide as part of the 2015–2019 capital program.[250]

The MTA also expressed interest in starting a pilot program to install platform edge doors.[251] Several planned stations in the New York City Subway may possibly feature platform screen doors, possibly including future stations such as those part of the Second Avenue Subway.[252] Currently, the MTA is planning a test program to install screen doors at a subway station on the BMT Canarsie Line. As part of the 2010–2014 capital program, the station was going to be Sixth Avenue, but it is uncertain whether or not that this will be the station chosen.[253]

Crime

Crime rates have shown variations over time, with a drop starting in the 1990s and continuing today.[254] In order to fight crime, various approaches have been used over the years, including an "If You See Something, Say Something" campaign[255] and a new initiative to ban people who commit a crime in the subway system from entering the system for a certain length of time.[256]

In order to fight crime, various approaches have been used.[255] A new initiative by the MTA to prevent crime is to ban people who commit one in the subway system from entering it for a certain length of time.[257] In the 1960s, for example, mayor Robert Wagner ordered an increase in the Transit Police force from 1,219 to 3,100 officers. During the hours at which crimes most frequently occurred (between 8:00 p.m. and 4:00 a.m.), the officers went on patrol in all stations and trains. In response, crime rates decreased, as extensively reported by the press.[258] In July 1985, however, the Citizens Crime Commission of New York City published a study showing riders abandoning the subway, fearing the frequent robberies and generally bad circumstances.[259]

To counter these developments, policy that was rooted in the late 1980s and early 1990s was implemented.[260][261] In line with this Fixing Broken Windows philosophy, the New York City Transit Authority (NYCTA) began a five-year program to eradicate graffiti from subway trains in 1984.[262] In 1993, Mayor Rudy Giuliani took office and with Police Commissioner Howard Safir, the strategy was more widely deployed in New York under the rubrics of "zero tolerance" and "quality of life". Crime rates in the subway and city dropped.[263] Giuliani's campaign credited the success to the zero tolerance policy.[264] The extent to which his policies deserve the credit is disputed.[265]

New York City Police Department Commissioner William J. Bratton and author of Fixing Broken Windows, George L. Kelling, however, stated the police played an "important, even central, role" in the declining crime rates.[259] The trend continued and Giuliani's successor, Michael Bloomberg, stated in a November 2004 press release: "Today, the subway system is safer than it has been at any time since we started tabulating subway crime statistics nearly 40 years ago."[266]

Photography

After the September 11 attacks in New York, the MTA exercised extreme caution regarding anyone taking photographs or recording video inside the system and proposed banning all photography and recording in a meeting around June 2004.[267] However, due to strong response from both the public and from civil rights groups, the rule of conduct was dropped. In November 2004, the MTA again put this rule up for approval, but was again denied,[268] though many police officers and transit workers still confront or harass people taking photographs or video.[269] However, on April 3, 2009, the NYPD issued a directive to officers stating that it is legal to take pictures within the subway system so long as it is not accompanied with suspicious activity.[270]

Currently, the MTA Rules of Conduct, Restricted Areas and Activities section states that anyone may take pictures or record video, provided that they do not use lights, reflectors or tripods. Lights, reflectors and tripods are permitted by members of the press the have identification issued by the NYPD.[271]

Terrorism prevention

On July 22, 2005, in response to bombings in London, the New York City Transit Police introduced a new policy of randomly searching passengers' bags as they approached turnstiles. The NYPD claimed that no form of racial profiling would be conducted when these searches actually took place. The NYPD has come under fire from some groups that claim purely random searches without any form of threat assessment would be ineffectual. Donna Lieberman, Executive Director of the NYCLU, stated, "This NYPD bag search policy is unprecedented, unlawful and ineffective. It is essential that police be aggressive in maintaining security in public transportation. But our very real concerns about terrorism do not justify the NYPD subjecting millions of innocent people to suspicionless searches in a way that does not identify any person seeking to engage in terrorist activity and is unlikely to have any meaningful deterrent effect on terrorist activity."[272] The searches were upheld by the United States Court of Appeals for the Second Circuit in MacWade v. Kelly.[273]

On April 11, 2008, MTA received a Ferrara Fire Apparatus Hazardous Materials Response Truck, which went into service three days later. It will be used in the case of a chemical or bioterrorist attack.[274]

Najibullah Zazi and others were arrested in September 2009 and pled guilty in 2010 to being part of an al-Qaeda plan to undertake suicide bombings on the New York City subway system.[275][276]

Challenges

28th Street station after the W train was discontinued in mid-2010. Note the dark grey tape masked over the W bullet.

2009–2010 budget cuts

The MTA faced a budget deficit of US$1.2 billion in 2009.[277] This resulted in fare increases (three times from 2008 to 2010)[278] and service reductions (including the elimination of two part-time subway services, the V and W). Several other routes were modified as a result of the deficit. The N was made a full-time local in Manhattan (in contrast to being a weekend local/weekday express before 2010), while the Q was extended nine stations north to Astoria – Ditmars Boulevard on weekdays, both to cover the discontinued W. The M was combined with the V, routing it over the Chrystie Street Connection, IND Sixth Avenue Line and IND Queens Boulevard Line to Forest Hills – 71st Avenue on weekdays instead of via the BMT Fourth Avenue Line and BMT West End Line to Bay Parkway. The G was truncated to Court Square full-time. Construction headways on eleven routes were lengthened, and off-peak service on seven routes were lengthened.[279]

The interior of an F train during morning rush hour

Capacity constraints

Several subway lines have reached their operational limits in terms of train frequency and passengers, according to data released by the Transit Authority. As of June 2007, all of the A Division services except the 42nd Street Shuttle, as well as the E and L trains were beyond capacity, as well as portions of the N train.[280][281] In April 2013, New York magazine reported that the system was more crowded than it had been in the previous 66 years.[282] The subway reached a daily ridership of 6 million for 29 days in 2014, and was expected to record a similar ridership level for 55 days in 2015; by comparison, in 2013, daily ridership never reached 6 million.[283] In particular, the express tracks of the IRT Lexington Avenue Line and IND Queens Boulevard Line are noted for operating at full capacity during peak hours.[280][284] The Long Island Rail Road East Side Access project is expected to bring many more commuters to the Lexington Avenue Line when it opens around the year 2022, further overwhelming its capacity.[285][286][287] Today, delays as a result of overcrowding are up to more than 20,000 every month, four times the amount in 2012. The overcrowded trains have resulted in an increase of assaults because of tense commutes. With less platform space, more passengers are forced to be on the edge of the platform resulting in the increased possibility of passengers falling on the track. One possible solution that the MTA is considering is platform screen doors, which exist on the Airtrain JFK to prevent passengers from falling onto the tracks. In order to prevent hitting passengers who could fall onto the tracks, train operators are being instructed to go into stations at lower speeds. The increased proximity of riders could result in the spread of contagious diseases.[288]

The Second Avenue Subway, which will have communications-based train control (CBTC), will relieve pressure on the Lexington Avenue Line (4 5 6 <6> trains) when the Second Avenue Subway's first segment begins operating in December 2016[289] by shifting an estimated 225,000 passengers,[290] and CBTC installation on the Flushing Line is expected to increase the rate of trains per hour on the 7 <7> trains, but little relief will come to other crowded lines until later. The L trains, which are overcrowded during rush hours, already have CBTC operation.[291] The installation of CBTC has reduced the L's running time by 3%.[290] Even with CBTC, there are limits on the potential increased service. For L service to be increased further, a power upgrade as well as additional space for the L to turn around at its Manhattan terminus, Eighth Avenue are needed.[116] The MTA is also seeking to implement CBTC on the IND Queens Boulevard Line. CBTC is to be installed on this line in five phases, with phase one (50th Street/8th Avenue and 47th–50th Streets – Rockefeller Center to Kew Gardens – Union Turnpike) being included in the 2010–2014 capital budget. The $205.8 million contract for the installment of phase one was awarded in 2015 to Siemens and Thales. Planning for phase one started in 2015, with major engineering work to follow in 2017.[284][292] The total cost for the entire Queens Boulevard Line is estimated at over $900 million.[293] Funding for CBTC on the IND Eighth Avenue Line is also provided in the 2015–2019 capital project.[294] The MTA projects that 355 miles of track will receive CBTC signals by 2029, including most of the IND, as well as the IRT Lexington Avenue Line and the BMT Broadway Line.[295] The MTA also is planning to install CBTC equipment on the IND Crosstown Line, the BMT Fourth Avenue Line and the BMT Brighton Line before 2025.[296] As part of the installation of CBTC, the whole fleet of subway cars need to be remodeled or replaced.[290] Due to an increase of ridership, the MTA has tried to increase capacity wherever possible by adding more frequent service, specifically during the evening hours. However, this increase will not likely keep up with the growth of subway ridership.[288][297][298] Some lines have capacity for additional trains during peak times, but there are too few subway cars for this additional service to be operated.[116]

The MTA also hopes to test other, smaller ideas on some services. The F, 6, and 7 trains are expected to get 100 more "station platform controllers" to manage the flow of passengers on and off crowded trains for maximum ridership during rush hours, for a total of 129 such employees; these workers would also answer passengers' questions about subway directions, rather than having conductors answering them and thus delaying the trains.[299][300] Subway guards, the predecessors to the platform controllers, were used during the Great Depression and World War II.[288] Shortened "next stop" announcements on trains are being tested on the 2 and 5 trains. "Step aside" signs on the platforms, reminding boarding passengers to let departing passengers off the train first, are being tested at Grand Central – 42nd Street, 51st Street, and 86th Street on the Lexington Avenue Line.[301] Cameras would also be installed so the MTA could observe passenger overcrowding.[290][302][303][304]

In London, stations just simply get closed off when they are overcrowded, such as the busy Oxford Circus station, which had to close more than 100 times in a year. Currently, the restrictions are not yet necessary, according to MTA spokesman Kevin Ortiz.[288]

The MTA, as part of the R211 subway car order, is planning to test a train of 10 open-gangway experimental prototype cars, which could increase capacity by up to 10% by utilizing the space, that in previous models was the unused space between cars.[305][306][307]

Subway flooding

Service on the subway system is occasionally disrupted by flooding from rainstorms, even minor ones.[308] Rainwater can disrupt signals underground and require the electrified third rail to be shut off. Every day, the MTA moves 13 million gallons of rain when it is not raining.[309] Since 1992, $357 million has been used to improve 269 pump rooms. By August 2007, $115 million was earmarked to upgrade the remaining 18 pump rooms.[310]

Despite these improvements, the transit system continues to experience flooding problems. On August 8, 2007, after more than 3 inches (76 mm) of rain fell within an hour, the subway system flooded, causing almost every subway service to either be disabled or seriously disrupted, effectively halting the morning rush.[311][312] This was the third incident in 2007 in which rain disrupted service. The system was disrupted on this occasion because the pumps and drainage system can handle only a rainfall rate of 1.75 inches (44 mm) per hour; the incident's severity was aggravated by the scant warning as to the severity of the storm.[309][313]:10

In addition, as part of a $130 million and an estimated 18-month project, the MTA began installing new subway grates in September 2008 in an attempt to prevent rain from overflowing into the subway system. The metallic structures, designed with the help of architectural firms and meant as a piece of public art, are placed atop existing grates but with a 3-to-4-inch (76 to 102 mm) sleeve to prevent debris and rain from flooding the subway. The racks will at first be installed in the three most flood-prone areas as determined by hydrologists: Jamaica, Tribeca, and the Upper West Side. Each neighborhood is scheduled to have its own distinct design, some featuring a wave-like deck which increases in height and features seating (Jamaica), others with a flatter deck that includes seating and a bike rack.[314][315][316]

In October 2012, Hurricane Sandy caused a lot of damage to New York City, and many subway tunnels were inundated with floodwater. The subway opened with limited service two days after the storm and was running at 80 percent capacity within five days; however, some infrastructure needed years to repair. A year after the storm, MTA spokesperson Kevin Ortiz said, "This was unprecedented in terms of the amount of damage that we were seeing throughout the system."[317][318]

Full and partial subway closures

On August 27, 2011, due to the approach of Hurricane Irene, the MTA suspended subway service at noon in anticipation of heavy flooding on tracks and in tunnels. It was the first weather-caused shutdown in the history of the system.[319] Service was restored by August 29.[320][321]

On October 29, 2012, another full closure was ordered before the arrival of Hurricane Sandy.[318] All services on the subway, the Long Island Rail Road and Metro-North were gradually shut down that day at 7:00 P.M., to protect passengers, employees and equipment from the coming storm.[322] The storm caused serious damage to the system, especially the IND Rockaway Line, which had many sections between Howard Beach – JFK Airport and Hammels Wye on the Rockaway Peninsula heavily damaged, leaving it essentially isolated from the rest of the system.[323][324] This required the NYCTA to truck in 20 R32 subway cars to the line to provide some interim service (temporarily designated the H).[325][326][327] Also, several of the system's tunnels under the East River were flooded by the storm surge.[328] South Ferry suffered serious water damage and did not reopen until April 4, 2013 by restoring service to the older loop-configured station that had been replaced in 2009;[329][330] the stub-end terminal tracks remain out of service pending extensive repairs and the new island-platformed station is not expected to reopen until 2017.[331][332][333][334]

On January 26, 2015, another full closure was ordered by New York Governor Andrew Cuomo due to the January 2015 nor'easter, which was originally projected to leave New York City with 20 to 30 inches (51 to 76 cm) of snow.[335] The next day, the subway system was partially reopened.[336][337] A number of New York City residents criticized Cuomo's decision to shut down the subway system for the first time ever due to snow. The nor'easter dropped much less snow in the city than originally expected, totaling only 9.8 inches (25 cm) in Central Park.[338][339]

On January 23, 2016, a partial subway closure was ordered due to the January 2016 United States blizzard, wherein all aboveground stations were closed; the underground lines remained open during the blizzard.[340][341] Most of the subway resumed service the next day, with some lingering delays due to an average of 26 inches (66 cm) of snow in the area.[342]

Litter and rodents

Further information: Rats in New York City

Litter accumulation is a perennial problem in the subway system. In the 1970s and 1980s, dirty trains and platforms, as well as graffiti were a serious problem. The situation had improved since then, but the 2010 budget crisis, which caused over 100 of the cleaning staff to lose their jobs, threatened to curtail trash removal from the subway system.[343][344]

The New York City Subway system is infested with rats.[345] Rats are sometimes seen on platforms,[346] and are commonly seen foraging through garbage thrown onto the tracks. They are believed to pose a health hazard, and on rare instances have been known to bite humans.[347] Subway stations notorious for rat infestation include Chambers Street, Jay Street – MetroTech, West Fourth Street, Spring Street and 145th Street.[348]

Decades of efforts to eradicate or simply thin the rat population in the system have been unsuccessful. In March 2009, the Transit Authority announced a series of changes to its vermin control strategy, including new poison formulas and experimental trap designs.[349] In October 2011, the MTA announced a new initiative to clean 25 subway stations, along with their garbage rooms, of rat infestations.[350] Also in October 2011, the MTA announced a pilot program aimed at reducing levels of garbage in the subways by removing all garbage bins from the subway platforms. The initiative is being tested at the Eighth Street – New York University and Flushing – Main Street stations.[351] As of March 2016, stations along the BMT Jamaica Line, BMT Myrtle Avenue Line, and various other stations had their garbage cans removed due to the success of the program.[352] There are also vacuum trains that are designed to remove trash off of the tracks, but are ineffective and often broken.[352] A 2016 study by Travel Math had the New York City Subway listed as the dirtiest subway system in the country based on the number of viable bacteria cells.[353]

Noise

Rolling stock on the New York City Subway produces high levels of noise that exceed guidelines set by the World Health Organization and the U.S. Environmental Protection Agency.[354] In 2006, Columbia University's Mailman School of Public Health found noise levels averaged 95 decibel (dB) inside subway cars and 94 dB on platforms.[354] Daily exposure to noise at such levels for as little as 30 minutes can lead to hearing loss.[354] Noise on one in 10 platforms exceeded 100 dB.[354] Under WHO and EPA guidelines, noise exposure at that level is limited to 1.5 minutes.[354] A subsequent study by Columbia and the University of Washington found higher average noise levels in the subway (80.4 dB) than on commuter trains including Port Authority Trans-Hudson (PATH) (79.4 dB), Metro-North (75.1 dB) and Long Island Rail Road (LIRR) (74.9 dB).[355] Since the decibel scale is a logarithmic scale, sound at 95 dB is 10 times more intense than at 85 dB and 100 times more intense than at 75 dB, and so forth.[355] In the second study, peak subway noise registered at 102.1 dB.[355]

Public relations

The Board of Transportation, and its successor, MTA New York City Transit, has had numerous events that promote increased ridership of their transit system.

Miss Subways

Main article: Miss Subways
An advertisement for Miss Subways at the New York City Transit Museum

From 1941 to 1976, the Board of Transportation/New York City Transit Authority sponsored the "Miss Subways" publicity campaign.[356] In the musical On the Town, the character Miss Turnstiles is based on the Miss Subways campaign.[357][358] The campaign was resurrected in 2004, for one year, as "Ms. Subways". It was part of the 100th anniversary celebrations. Featuring young models, entertainers and others, the monthly campaign, which included the winners' photos and biographical blurbs on placards in subway cards, featured such winners as Mona Freeman and prominent New York City restaurateur Ellen Goodman. The winner of this contest was Caroline Sanchez-Bernat, an actress from Morningside Heights.[359]

Subway Series

Main article: Subway Series

Subway Series is a term attributed to any series of baseball games between New York City teams, called thus as opposing teams can travel to compete merely by using the subway system along with the fact that stations are adjacent and visible to their respective stadiums. Subway Series is a term long used in New York, going back to series between the Brooklyn Dodgers or New York Giants and the New York Yankees in the 1940s and 1950s. Today, the term is used to describe the rivalry between the Yankees and the New York Mets. During the 2000 World Series, cars on the 4 train (which stopped at Yankee Stadium) were colored white with blue pinstripes, while cars on the 7 train (which stopped at Shea Stadium) were colored orange and blue, the Mets' team colors.[360] The term could also be applied to the rivalry between the New York Knicks and the Brooklyn Nets of the National Basketball Association, and the New York Rangers and the New York Islanders of the National Hockey League ever since the Nets and the Islanders moved to the Barclays Center in Brooklyn in 2012 and 2015 respectively.[361][362]

Holiday Train

Nostalgia Train at Second Avenue station in 2012

Since 2003, the MTA has operated a Holiday Train on Sundays in November and December, from the first Sunday after Thanksgiving to the Sunday before Christmas Day.[363] This train was made of cars from the R1 through R9 series. The route made all stops between Second Avenue in Manhattan and Queens Plaza in Queens via the IND Sixth Avenue Line and the IND Queens Boulevard Line. In 2011, the train operated on Saturdays instead of Sundays.[364]

The contract, car numbers (and year built) used were Arnines, specifically R1 100 (1930), R1 381 (1931), R4 401 (1932), R4 484 (1932) – Bulls Eye lighting and a test P.A. system added in 1946, R6-3 1000 (1935), R6-1 1300 (1937), R7A 1575 (1938) – rebuilt in 1947 as a prototype for the R10 subway car, and R9 1802 (1940).[365]

See also

Notes

  1. These are the physical tracks that a train "service" runs on. See New York City Subway nomenclature for more information.
  2. These "services" run on physical tracks. See New York City Subway nomenclature for more information.
  3. 1 2 There are 13 stations on the IND Second Avenue Line and 1 station on the IRT Flushing Line planned.
    • The Second Avenue Line has 16 stations.[2] Three are under construction, with 13 planned.[3]
    • The Tenth Avenue station will be constructed as an in-fill station once funding for it is secured.[4]
  4. 1 2
  5. One of these stations is an existing IRT Broadway – Seventh Avenue Line station being completely rebuilt. The other four stations are truly new stations.
  6. The IRT main line, which is considered to be the first New York City "subway" line, opened in 1904; however, the Ninth Avenue Line, a predecessor elevated railroad line, operated its first trial run on July 3, 1868, according to Facts and Figures 1979–80, published by the New York City Transit Authority See also nycsubway.org, and the West End Line railroad opened in 1863. A small portion of the latter line's original right-of-way is still in daily use near Coney Island. thethirdrail.net
  7. Highest daily ridership since public takeover. In the first half of the 20th century, ridership was significantly higher.
  8. There is one station (10th Avenue) planned as a future infill station. See Outcry emerges for 41st St. stop on new 7-line
  9. The Times Square and Grand Central stations of the IRT 42nd Street Shuttle are closed during late nights.
  10. The corridors repaired in 2012 were:
  11. The corridors repaired in 2013 were:
  12. The corridors repaired in 2014 were:
  13. The following bus routes and subway stations participated in the trial: Two options were available during this second trial for fare payment:
    • "pay-as-you-go" RFID card scan at select turnstiles or locations; or,
    • pre-funded fares via a pilot website called the "NY/NJ Transit Trial" for multiple and unlimited ride discounts. Pre-funded fares ceased to be available on the trial website on October 16, 2010, and the free trial ended on November 30, 2010.

References

  1. 1 2 3 4 5 6 7 8 9 "Introduction to Subway Ridership". Metropolitan Transportation Authority (MTA). Retrieved April 26, 2015.
  2. http://web.mta.info/capital/sas_docs/final_summary_report.pdf
  3. http://www.nydailynews.com/new-york/mta-releases-avenue-subway-images-article-1.1506866
  4. "Outcry emerges for 41st St. stop on new 7-line".
  5. 1 2 "1 Subway Line Profile" (PDF). NYPRIG Straphangers Campaign. Retrieved 28 February 2016.
  6. 1 2 "Comprehensive Annual Financial Report for the Years Ended December 31, 2011 and 2010" (PDF). Metropolitan Transportation Authority (MTA). May 2, 2012. p. 148. Archived from the original (PDF) on July 22, 2013. Retrieved March 9, 2014.
  7. "New section of track extends the 7 Line by 1.5 miles". mta.info. MTA. Retrieved 13 October 2015.
  8. 1 2 3 4 5 6 7 "Facts & Figures – Subways". www.nycsubway.org. Retrieved March 9, 2014.
  9. 1 2 Fitzsimmons, Emma G. (2015-09-10). "Subway Station for 7 Line Opens on Far West Side". The New York Times. Retrieved 2015-09-13.
  10. 1 2 "Average schedule speed: How does Metro compare?".
  11. 1 2 Hood, Clifton. 722 Miles. Baltimore, Maryland: Johns Hopkins University Press, 2004.
  12. "Metropolitan Transportation Authority Description and Board Structure Covering Fiscal Year 2009" (PDF). mta.info. Metropolitan Transportation Authority. 2009. Retrieved March 13, 2016.
  13. "What is the largest metro system in the world?". CityMetric. Retrieved 2016-03-13.
  14. 1 2 3 4 5 6 7 8 9 10 11 12 13 "How to Ride the Subway". Retrieved November 17, 2013.
  15. "Should New York's Subway Map Embrace NJ's PATH Trains?". Curbed NY. Retrieved 2016-03-13.
  16. "AirTrain – Ground Transportation – John F. Kennedy International Airport – Port Authority of New York & New Jersey". www.panynj.gov. Retrieved 2016-03-13.
  17. "MTA/New York City Transit – Where MetroCard Is Accepted". web.mta.info. Retrieved 2016-03-13.
  18. "Subways". Metropolitan Transportation Authority (MTA). April 2, 2013. Retrieved April 26, 2015.
  19. Emma G. Fitzsimmons (November 16, 2014). "M.T.A. Expected to Raise Fares and Tolls". The New York Times. Retrieved November 18, 2014.
  20. Goldstein, Jack (2013-10-08). 101 Amazing Facts About New York. Andrews UK Limited. ISBN 9781783333059.
  21. Brennan, Joseph (2005). "They found the tube in excellent condition". Beach Pneumatic. Retrieved 2008-01-17.
  22. "Inventor of the Week: Archive". 2014-03-06. Archived from the original on March 6, 2014. Retrieved 2016-03-18.
  23. Brennan, Joseph (2005). "They found the tube in excellent condition". Beach Pneumatic. Retrieved 2008-01-17.
  24. "The Pneumatic Tunnel Under Broadway (1870)". nycsubway.org. Archived from the original on May 5, 2008. Retrieved July 7, 2008. (extract from Scientific American March 5, 1870)
  25. nycsubway.org—Beach Pneumatic Transit
  26. Blankinger, Kari (March 1, 2016). "NYC’s first subway was luxurious, pneumatic and built illegally". New York Daily News. Retrieved March 13, 2016.
  27. Martin, Douglas (November 17, 1996). "Subway Planners' Lofty Ambitions Are Buried as Dead-End Curiosities". nytimes.com (The New York Times). Retrieved 27 June 2015.
  28. Santora, Marc (August 14, 2013). "When the New York City Subway Ran Without Rails". The New York Times.
  29. Christiano, G. J. "The Blizzard of 1888; the Impact of this Devastating Storm on New York Transit". nycsubway.org. Retrieved February 9, 2016.
  30. 1 2 "American Experience. Technology . New York Underground. About the Program | PBS". www.pbs.org. Retrieved 2016-03-13.
  31. 1 2 3 4 "New York City subway opens – Oct 27, 1904". HISTORY.com. 1904-10-27. Retrieved 2015-10-25.
  32. 1 2 3 4 James Blaine Walker, Fifty Years of Rapid Transit, 1864–1917, published 1918, pp. 162–191
  33. "The 9th Avenue Elevated-Polo Grounds Shuttle". nycsubway.org. 2012. Retrieved 2014-07-03.
  34. "Specter of the 5¢ fare haunts the current fare hike debate". Second Ave. Sagas. Retrieved 2016-02-25.
  35. "OUR SUBWAY OPEN, 150,000 TRY ITMayor McClellan Runs the First Official Train.". the New York Times. October 28, 1904. Retrieved February 24, 2016.
  36. "Done at Last". Brooklyn Daily Eagle (Brooklyn, NY). May 13, 1885. p. 1.
  37. "Halsey Street Station Opened". Brooklyn Daily Eagle (Brooklyn, NY). August 19, 1885. p. 4.
  38. "A New Station Opened". Brooklyn Daily Eagle (Brooklyn, NY). July 18, 1885. p. 4.
  39. "East New York". Brooklyn Daily Eagle (Brooklyn, NY). June 13, 1885. p. 6.
  40. "Still Extending Its Lines". Brooklyn Daily Eagle (Brooklyn, NY). September 5, 1885. p. 6.
  41. 1 2 "www.nycsubway.org: BMT Nassau Street-Jamaica Line". www.nycsubway.org. Retrieved 2016-02-25.
  42. "Opening of a New Railroad". Brooklyn Daily Eagle (Brooklyn, NY). October 5, 1863. p. 2.
  43. "Railroads". Brooklyn Daily Eagle (Brooklyn, NY). October 9, 1863. p. 1.
  44. "The Third Rail – Gunther and his Railroad – page 1". www.thethirdrail.net. Retrieved 2016-02-14.
  45. "www.nycsubway.org: New Subways for New York: The Dual System of Rapid Transit (1913)". www.nycsubway.org. Retrieved 2016-02-26.
  46. "Gay Midnight Crowd Rides First Trains in New Subway". New York Times. September 10, 1932. p. 1.
  47. 1 2 Feinman, Mark S. (2000). "History of the Independent Subway". nycsubway.org. Retrieved February 10, 2016.
  48. Cudahy, Brian J. (1995). Under the Sidewalks of New York: The Story of the Greatest Subway System in the World. Fordham University Press. p. 118. ISBN 9780823216185.
  49. "Straphangers Sit As Tunnel Opens". New York Times. December 2, 1955. p. 29. Retrieved February 13, 2010.
  50. Perlmutter, Emanuel (November 16, 1967). "SUBWAY CHANGES TO SPEED SERVICE: Major Alterations in Maps, Routes and Signs Will Take Effect Nov. 26". nytimes.com. The New York Times. Retrieved 7 July 2015.
  51. Joseph B. Raskin (1 November 2013). The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. Fordham University Press. ISBN 978-0-8232-5369-2. Retrieved 12 August 2015.
  52. "A Division". 2011-08-06. Archived from the original on 2011-08-06. Retrieved 2016-02-14.
  53. 1 2 Sparberg, Andrew J. (1 October 2014). From a Nickel to a Token: The Journey from Board of Transportation to MTA. Fordham University Press. ISBN 978-0-8232-6190-1.
  54. "mta.info | Facts and Figures". web.mta.info. Retrieved 2016-03-11.
  55. "Transport Workers Union Our History". www.twu.org. Retrieved 2016-02-16.
  56. B. Freeman, Joshua. In Transit:The Transport Workers Union In New York City, 1933–1966. Temple University Press. ISBN 9781592138159.
  57. "A Short History of Recent American Transit Strikes". The Transport Politic. Retrieved 2016-02-16.
  58. "A look back at the historic 1966 transit strike: Photos and more". am New York. Retrieved 2016-02-16.
  59. "N. Y. Transit Strike on (January 1, 1966)". Retrieved 2016-02-16.
  60. "35 Years Ago This Week, the MTA Strikes for 11 Days in NYC Bringing Transit to a Halt". Untapped Cities. Retrieved 2016-02-16.
  61. Steinhauer, Jennifer (2005-12-21). "Citywide Strike Halts New York Subways and Buses". The New York Times. ISSN 0362-4331. Retrieved 2016-02-16.
  62. "NYC Transit Workers On Strike". www.cbsnews.com. Retrieved 2016-02-16.
  63. nycsubway.org — The New York Transit Authority in the 1970s
  64. 1 2 nycsubway.org — The New York Transit Authority in the 1980s
  65. Lorch, Donatella (October 29, 1989). "The 'Subway to Nowhere' Now Goes Somewhere". The New York Times. Retrieved October 20, 2011.
  66. Johnson, Kirk (1988-12-09). "Big Changes For Subways Are to Begin". The New York Times. Retrieved 2009-07-05.
  67. Lentz, Phillip (May 18, 1989). "Graffiti Cleanup A Shiny Symbol Of Subway System`s Turnaround". Chicago Tribune. Retrieved March 11, 2016.
  68. U.S. Department of Transportation, Research and Special Programs Administration, Volpe National Transportation Systems Center (April 2002). "EFFECTS OF CATASTROPHIC EVENTS ON TRANSPORTATION SYSTEM MANAGEMENT AND OPERATIONS: NEW YORK CITY- SEPTEMBER 11". Retrieved 2013-11-05.
  69. 1 2 Kennedy, Randy. "Tunnel Vision; With Station's Reopening, Even Commuters Smile", The New York Times, September 17, 2002. Accessed October 6, 2007.
  70. "September 11: Three Years Later". Brian Abbott. 2004-09-11. Retrieved 2016-03-25.
  71. "mta.info: Superstorm Sandy Timeline".
  72. 1 2 3 4 "www.nycsubway.org: The New York Subway: Chapter 02, Types and Methods of Construction". www.nycsubway.org. Retrieved 2015-11-01.
  73. 1 2 3 4 5 6 7 Interborough Rapid Transit Company (June 2007). IRT Interborough Rapid Transit / the New York City Subway: Its Design and Construction. Lulu.com. ISBN 978-1-4303-2550-5. Retrieved 27 February 2016.
  74. "Why It Was Faster To Build Subways in 1900". Atlas Obscura. 2015-10-22. Retrieved 2016-04-15.
  75. "www.nycsubway.org: Design and Construction of the IRT: Civil Engineering (Scott)". www.nycsubway.org. Retrieved 2016-04-15.
  76. "Subway Construction: Then and Now". The New York Public Library. Retrieved 2016-04-15.
  77. "www.nycsubway.org: Subway FAQ: Facts and Figures". www.nycsubway.org. Retrieved 2016-02-26.
  78. "www.nycsubway.org: IRT White Plains Road Line". www.nycsubway.org. Retrieved 2016-02-26.
  79. Cox, Jeremiah. "Myrtle Av-Broadway (J,M,Z) – The SubwayNut". www.subwaynut.com. Retrieved 2016-02-26.
  80. DuTemple, Lesley A. (October 1, 2002). The New York Subways. Twenty-First Century Books. ISBN 9780822503781. Retrieved 28 January 2016.
  81. MacKechnie, Christopher. "The Two Methods of Subway Construction". about.com. Retrieved May 7, 2014. In exchange for these advantages are two major disadvantages. One is financial: "deep bore" construction costs significantly more than 'cut and cover'
  82. "No. 7 Subway Line Extension". Richard Dattner & Partners Architects. Archived from the original on March 15, 2012. Retrieved February 28, 2010.
  83. "West Side Development Project Gets The Green Light". NY1. December 21, 2009. Archived from the original on April 7, 2012. Retrieved February 28, 2010.
  84. Cuza, Bobby (February 19, 2009). "Crews Lower Giant Drill Into 7 Line Tunnel". NY1. Archived from the original on May 5, 2009. Retrieved February 28, 2010.
  85. "New York State Society of Professional Engineers Recognizes No. 7 Line Project". Tunnel Business Magazine. July 3, 2013. Retrieved August 20, 2013.
  86. " "Blasting on Second Avenue". thelaunchbox.blogspot.com. March 22, 2010.
  87. Siff, Andrew (May 14, 2010). "2nd Ave. Subway Tunnel Dig Begins". WNBC. Retrieved May 14, 2010.
  88. "MTA | news | Tunneling Begins Under Second Avenue". www.mta.info. Retrieved 2016-02-10.
  89. Various (September 23, 2011). "Second Avenue Subway has a breakthrough moment; several billion more are all the M.T.A. wants". Capital New York. Retrieved March 31, 2014.
  90. 1 2 Duffus, R.L. (September 22, 1929). "OUR GREAT SUBWAY NETWORK SPREADS WIDER; New Plans of Board of Transportation Involve the Building of More Than One Hundred Miles of Additional Rapid Transit Routes for New York". The New York Times. Retrieved 19 August 2015.
  91. "100 Miles of Subway in New City Project; 52 of them in Queens" (PDF). New York Times. September 16, 1929. Retrieved 25 March 2016.
  92. "The futureNYCSubway: The IND Second System". vanshnookenraggen. Retrieved 2016-03-13.
  93. nycsubway.org—History of the Independent Subway
  94. O'Grade, Jim (January 3, 2012). "Lost Subways: Abandoned Stations and Unbuilt Lines". wnyc.org. Archived from the original on 2013-08-09. Retrieved February 10, 2016.
  95. Joseph B. Raskin (1 November 2013). The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. Fordham University Press. ISBN 978-0-8232-5369-2. Retrieved 12 August 2015.
  96. "New Subway Line on 6th Ave. Opens at Midnight Fete". The New York Times. December 15, 1940. p. 1. Retrieved October 7, 2011.
  97. "Rail Line is Added to Subway System". The New York Times. May 16, 1941. p. 25. Retrieved October 4, 2011.
  98. Freeman, Ira Henry (June 28, 1956). "Rockaway Trains to Operate Today". nytimes.com. The New York Times. Retrieved 29 June 2015.
  99. Johnson, Kirk (1988-12-09). "Big Changes For Subways Are to Begin". The New York Times. Retrieved 2009-07-05.
  100. Lorch, Donatella (October 29, 1989). "The 'Subway to Nowhere' Now Goes Somewhere". The New York Times. Retrieved October 20, 2011.
  101. "Rapid Transit Service Coming Brochure". www.thejoekorner.com. New York City Transit Authority. July 1, 1968. Retrieved 2016-01-24.
  102. "KK a new service". www.thejoekorner.com. New York City Transit Authority. July 1, 1968. Retrieved 2016-01-24.
  103. "IRT Passengers Get New 148th St. Station". The New York Times. May 14, 1968. p. 95. Retrieved October 4, 2011.
  104. "Capital Programs 7 Line Extension". mta.info. 2015-09-13. Retrieved 2016-03-25.
  105. "Annual Information Statement 2001 Appendix A The Related Entities" (PDF). Metropolitan Transportation Authority (MTA). 2001. Retrieved April 26, 2015.
  106. Tunneling to the Future: The Story of the Great Subway Expansion That Saved New York (2001).
  107. "Introduction to Subway Ridership". Metropolitan Transportation Authority (MTA). Retrieved April 18, 2016.
  108. "Annual Subway Ridership". Metropolitan Transportation Authority (MTA). Retrieved April 26, 2015.
  109. Subway Colors and Names on YouTube MTA YouTube Web Page. Made July 15, 2010. Retrieved July 17, 2010.
  110. 1 2 3 "Subway Service Guide September 2015" (PDF). mta.info. Metropolitan Transportation Authority. September 2015. Retrieved February 29, 2016.
  111. Cox, Bobby. "New York City Subway". Deaf Echo. Archived from the original on 2014-11-02. Retrieved February 10, 2016.
  112. "Rules of The Subway". Fodors. Retrieved September 21, 2013.
  113. "Subway Map" (PDF). Metropolitan Transportation Authority. September 2015. Retrieved 2015-09-13.
  114. "Late Night Subway Service September 2015" (PDF). mta.info. Metropolitan Transportation Authority. September 2015. Retrieved February 29, 2016.
  115. Haberman, Clyde (2008-04-04). "Train Skip Your Stop? It’s No Mistake, It’s Just the Weekend". The New York Times. Retrieved 2016-03-25.
  116. 1 2 3 Tangel, Andrew. "New York’s Subway System Can’t Keep Pace With Growing Number of Riders". Wall Street Journal. ISSN 0099-9660. Retrieved 2016-03-25.
  117. Finnegan, Jack, Belden Merims and Jennifer Cecil. Newcomer's Handbook for Moving to and Living in New York City: Including Manhattan, Brooklyn, the Bronx, Queens, Staten Island, and Northern New Jersey. First Books Inc., Portland, Oregon. 2007. ISBN 978-0-912301-72-3. Page 336.
  118. "NYCT – Service Advisory". travel.mtanyct.info. Retrieved 2016-02-10.
  119. "MTA/New York City Transit – Subway Service Information". 2010-12-20. Archived from the original on 2010-12-20. Retrieved 2016-02-10.
  120. "NYCT Subway (@NYCTSubway) – Twitter".
  121. 1 2 "SUBWAY ENTRANCE STYLINGS". Forgotten New York. February 14, 2005. Retrieved 6 December 2015.
  122. Kennedy, Randy (August 13, 2002). "Tunnel Vision; The Light at the Top of the Subway Stairs". The New York Times. Retrieved July 7, 2008.
  123. http://www.nycsubway.org/wiki/Subway_FAQ:_Facts_and_Figures
  124. 1 2 "Reopening Closed Subway Entrances" (PDF). pcac.org. New York City Transit Riders Council. November 2001. Retrieved 6 December 2015.
  125. "STATION HOUSES | | Forgotten New York". forgotten-ny.com. Retrieved 2016-02-24.
  126. "Construction of Foundations and Structure: Section 1, Jamaica Line" (PDF). New York Municipal Railway Corporation. 1915. Retrieved 4 March 2016.
  127. "MTA New York City Transit Jay Street / Lawrence Street Stations Contract A-35913 / A-35914 / A-35927 / A-35978" (PDF). Metropolitan Transportation Authority (New York). Retrieved 6 December 2015.
  128. "www.nycsubway.org: IRT West Side Line". www.nycsubway.org. Retrieved 2016-02-24.
  129. "MTA/New York City Transit – Subway Station Booth". web.mta.info. Retrieved 2016-03-13.
  130. Grynbaum, Michael M. (October 8, 2009). "M.T.A. Station Agent Cuts Leave Riders Lost". New York Times. Retrieved March 13, 2016.
  131. "Riding Safely". Metropolitan Transportation Authority (New York). Retrieved 6 December 2015.
  132. Goldman, Ari L. (1982-03-08). "FOR OFF-HOURS, SUBWAY ZONES FOR SAFER WAIT". The New York Times. ISSN 0362-4331. Retrieved 2016-04-15.
  133. "IND STation Lengths". 2011-08-06. Archived from the original on 2011-08-06. Retrieved 2016-02-14.
  134. "Map Reveals Shortage of Wheelchair-Accessible NYC Subway Stations". DNAinfo New York. Retrieved 2016-02-28.
  135. "mta.info | Accessibility". web.mta.info. Retrieved 2016-02-10.
  136. "NYC Subway Needs $1.7 Billion In New Elevators, Feds Say". Curbed NY. Retrieved 2016-02-29.
  137. "Capital Program Oversight Committee Meeting" (PDF). Metropolitan Transportation Authority (MTA). July 2014. p. 26. Retrieved April 30, 2015.
  138. "New York City Subway Car Fleet Jan 2012 through January 2016". TheJoeKorner. Retrieved February 6, 2016.
  139. "BMT-IND Car Assignments – December 6, 2015". www.thejoekorner.com. Retrieved 2016-02-14.
  140. 1 2 "R-Type Cars 1932 to 1987". www.thejoekorner.com. Retrieved 2016-03-13.
  141. Second Avenue Subway Draft Environmental Impact Statement, Glossary PDF (45.6 KB)
  142. "3.3.3 A, C (Fulton Street) Line Services and Structural Issues" (PDF). nyc.gov. New York City Department of City Planning. 2007. Retrieved February 9, 2016.
  143. "Car History". www.erictb.info. Retrieved 2016-03-13.
  144. "R-Type Cars 1932 to 1987". thejoekorner.com.
  145. Chan, Sewell (2005-11-30). "New Subway Cars Promise All Kinds of Information". The New York Times. Retrieved 2007-10-27.
  146. "R160A in service on the N on January 19, 2007".
  147. "R160B in service on the N on February 23, 2007".
  148. "New Technology Train Rolled Out This Morning Along the E Line". Metropolitan Transportation Authority (New York). December 22, 2008. Retrieved 7 December 2015.
  149. 1 2 3 4 "The voice behind the closing doors would like to clear something up.". nypress.com. Straus News. March 18, 2003. Retrieved 7 December 2015.
  150. 1 2 3 "GUIDED BY SUBTERRANEAN VOICES". whosevoice.com. January 4, 2010. Retrieved 7 December 2015.
  151. Shaweddy, Vici (January 11, 2013). "Charlie Pellett – The Voice of New York Subway". Retrieved 7 December 2015.
  152. AM New York (September 25, 2006): "Voices Down Below", by Justin Rocket Silverman
  153. "Governor Cuomo Announces $600 Million MTA Investment in Upstate Manufacturing (MTA Chooses Bombardier for $600 Million Order for 300 Subway Cars, More Than 500 Manufacturing and Supply Chain Jobs Maintained or Created)". Government of New York. March 28, 2012. Retrieved March 29, 2012.
  154. "Bombardier in the USA – Media Center". Us.bombardier.com. Retrieved May 7, 2014.
  155. "MTA Capital Program Oversight Meeting" (PDF). mta.info. Metropolitan Transportation Authority. January 2016. Retrieved January 23, 2016.
  156. 1 2 "MTA/New York City Transit – Fares and MetroCard". web.mta.info. Retrieved 2016-02-10.
  157. "Transit & Bus Committee Meeting February 2016" (PDF). mta.info. Metropolitan Transportation Authority. February 2016. Retrieved March 11, 2016.
  158. "MetroCard Calculator to ease fare increase pain – am New York". am New York.
  159. "MTA/New York City Transit – Fares and MetroCard". mta.info.
  160. "mta.info – Reduced-Fare". mta.info.
  161. Salkin, Allen. "OLD METROCARD CAN BE A FARE-LY PROFITABLE ITEM". New York Post. Retrieved 2016-03-13.
  162. Faison, Seth (June 2, 1993). "3,000 Subway Riders, Cards in Hand, Test New Fare System". The New York Times. Retrieved 2010-04-25.
  163. Donohue, Pete (August 26, 2014). "With work on Greenpoint Tube set to end, advocates want free G-to-J/M transfer to be permanent". New York Daily News. Retrieved February 28, 2016.
  164. "NYC Transit G Line Review" (PDF). mta.info. Metropolitan Transportation Authority. July 10, 2013. Retrieved February 28, 2016.
  165. Newman, Andy. "Guide to NYC Subway". FreshNYC.
  166. "MTA: Say Goodbye to Fun Cards". WNYC. Retrieved 2016-02-09.
  167. Newman, Andy (July 3, 1998). "Hop On, Hop Off: The Unlimited Metrocard Arrives". The New York Times. Retrieved January 8, 2010.
  168. 1 2 3 4 Sozzi, Brian (2014-04-21). "Sozzi: The Boring Old Subway is Now Digital, and That's Pretty Awesome". TheStreet. Retrieved 2016-03-25.
  169. Greenfield, Rebecca (2014-01-08). "So Long, MetroCard: NYC Subway Cards Will Soon See Their Last Swipes". Fast Company. Retrieved 2016-03-25.
  170. "MTA Looking to Replace MetroCard by 2019: Report". NBC New York. 2014-01-10. Retrieved 2016-03-25.
  171. "MTA | Press Release | NYC Transit | FASTRACK Comes to the 2 in Brooklyn". www.mta.info. Retrieved 2016-03-13.
  172. "'FASTRACK' Repairs Mean Service Disruptions On 4, 5 And 6 Subway". Retrieved 2016-03-13.
  173. "mta.info | FASTRACK Schedule". web.mta.info. Retrieved 2016-03-18.
  174. "MTA Youtube video about FASTRACK". MTA. Retrieved May 13, 2012.
  175. "MTA | Press Release | NYC Transit | FASTRACK Coming to the B, D, F and M Lines". www.mta.info. Retrieved 2016-02-10.
  176. "MTA | Press Release | NYC Transit | With 8th Avenue Line Work Wrapped Up, First Round of FASTRACK Complete". www.mta.info. Retrieved 2016-02-10.
  177. "MTA | Press Release | NYC Transit | FASTRACK on the Lexington Avenue 4 5 6 Line". www.mta.info. Retrieved 2016-02-10.
  178. "MTA | Press Release | NYC Transit | Another Successful Round of FASTRACK on the 1 2 3". www.mta.info. Retrieved 2016-02-10.
  179. "mta.info – FASTRACK Schedule". mta.info.
  180. "mta.info – FASTRACK Schedule". mta.info.
  181. "mta.info | FASTRACK Schedule". web.mta.info. Retrieved 2016-03-11.
  182. "mta.info | FASTRACK Schedule". web.mta.info. Retrieved 2016-03-11.
  183. 1 2 3 "No ETA: Firm flubs $160M Subway Tech". New York Post (New York Post). October 20, 2006. Retrieved July 7, 2008.
  184. "Delay On Subway Message Boards, City Looks For New Contractors". NY1 news. www.ny1.com. October 20, 2006. Archived from the original on 2007-10-13. Retrieved July 7, 2008.
  185. Olshan, Jeremy (January 26, 2007). "ABOUT TIME FOR MTA". New York Post. Archived from the original on 2007-10-13. Retrieved July 7, 2008. The long-awaited subway-platform screens that report when the next trains will arrive will start appearing at 158 stations on the numbered lines later this year, transit sources said yesterday. Software glitches had plagued the $160 million system. But a month after The Post reported the MTA had threatened to dump the contractor, Siemens, the company found a solution, sources said.
  186. "Subway arrival info behind schedule". 2008-09-27. Archived from the original on 2008-09-27. Retrieved 2016-02-10.
  187. "MTA's fiberoptics network already obsolete". Second Ave. Sagas. Retrieved 2016-02-10.
  188. "MTA New York City Transit Begins Using Video Screens in Pilot Program to Provide Real-Time Information on the L Line". MTA. February 5, 2009. Retrieved February 9, 2009.
  189. "Transit debuts countdown clocks along the 6 line". Second Ave. Sagas. Retrieved 2016-02-10.
  190. "Blocked Subway Signs A Tough Read, Straphangers Say – NY1.com". 2011-07-14. Archived from the original on 2011-07-14. Retrieved 2016-02-10.
  191. "MTA | news | "Countdown Clocks" Continue to Pop Up on Subway Platforms". www.mta.info. Retrieved 2016-02-10.
  192. "Not All Riders Feel The Time Is Right For Subway Station Countdown Clocks – NY1.com". 2011-07-14. Archived from the original on 2011-07-14. Retrieved 2016-02-10.
  193. Subway Countdown Clock Pilot on YouTube MTA's YouTube website. Made February 26, 2010. Retrieved September 1, 2010.
  194. Train Arrival Information Signs on YouTube MTA's YouTube website. Retrieved October 9, 2010.
  195. "MTA | Press Release | NYC Transit | The Clock Strikes 100!". www.mta.info. Retrieved 2016-02-10.
  196. 1 2 "mta.info – Innovation". mta.info.
  197. "For Astoria, next train info without the clock". Second Ave. Sagas.
  198. "Heard Underground, in Your Dreams". New York Times. February 23, 2012. Retrieved February 28, 2011.
  199. Barron, James (2012-02-23). "Announcing the Subway Announcement Lady". City Room. Retrieved 2016-03-25.
  200. "MTA | Press Release | MTA Headquarters | MTA Releases Real-Time Subway Arrival Times". www.mta.info. Retrieved 2016-02-14.
  201. "MTA Adds Real-Time Arrival Estimates on L Line To Subway Time App, Website and Open Data Portal".
  202. "MTA 2010–2014 Capital Program Questions & Answers" (PDF). nysenate.gov. pp. 12–13. Archived from the original (PDF) on 2012-04-17. Retrieved February 10, 2016.
  203. "MTA 2010–2014 Capital Program Questions & Answers" (PDF). pp. 12–13.
  204. "Carroll Gardens Library To Close for HVAC Installation, Officials Say". DNAinfo New York. Retrieved 2016-02-29.
  205. 1 2 3 Tangel, Andrew (2015-10-28). "More NYC Subway Countdown Clocks Won't Arrive Anytime Soon". WSJ. Retrieved 2015-10-29.
  206. "NYC Subway-Mastercard Trial". engadget.com. February 1, 2006. Retrieved April 9, 2007.
  207. Chan, Sewell (2006-01-31). "A Test at 25 Stations Subway Riding Without the Swiping". The New York Times. ISSN 0362-4331. Retrieved 2016-02-10.
  208. "The Future of the MetroCard Part 3". Second Ave. Sagas. Retrieved 2016-02-10.
  209. "MTA | news | MTA Launches Smart Card Pilot Program". www.mta.info. Retrieved 2016-02-10.
  210. Contactless Fare Payment Pilot on YouTube – MTA's YouTube website. Retrieved June 1, 2010.
  211. MasterCard Tap & Go Payment System Enhances Commuter Experience on YouTube – Mastercard Worldwide YouTube website. Made May 28, 2010. Retrieved June 3, 2010.
  212. Kaminer, Ariel (2010-06-11). "Testing PayPass on New York’s Buses and Trains". The New York Times. Retrieved 2016-03-25.
  213. "NY/NJ TRANSIT Trial – About the Trial – FAQ". Internet Archive. 2010-11-21. Archived from the original on 2010-11-21. Retrieved 2016-03-25.
  214. "The ERA Bulletin 2010-07". Issuu. Retrieved 2016-02-28.
  215. "About the Trial". Internet Archive. 2010-11-18. Archived from the original on 2010-11-18. Retrieved 2016-03-25.
  216. "Help Point Intercom Pilot". MTA.info (YouTube). September 27, 2010. Retrieved April 7, 2011.
  217. "Help Point pilot set for system-wide rollout". Second Ave. Sagas. Retrieved 2016-02-10.
  218. "The MTA’s Help Point kiosks could be used for surveillance". The Verge. Retrieved 2016-03-18.
  219. "MTA | news | New Subway Station Intercoms". www.mta.info. Retrieved 2016-02-28.
  220. 1 2 "MTA | Press Release | NYC Transit | Help Points to Make Subway Safer, Easier to Use". www.mta.info. Retrieved 2016-02-10.
  221. "Introducing the Help Point". MTA.info (YouTube). April 6, 2011. Retrieved April 6, 2011.
  222. "MTA Twenty-Year Capital Needs Assessment 2015–2034" (PDF). Metropolitan Transportation Authority. October 2012. p. 46. Retrieved 25 March 2016.
  223. Nelson, Sarah. "MTA Unveils New "On The Go" Touch-Screen Plaything At Bowling Green Subway Station". Gothamist. Retrieved 2016-02-10.
  224. "MTA | news | MTA Introduces New On the Go! Touch-Screen Travel Station". www.mta.info. Retrieved 2016-02-10.
  225. "MTA to Add More On the Go! Touch-Screen Travel Stations". Metropolitan Transportation Authority. Retrieved April 23, 2013.
  226. "New York City On the Go" (PDF). mta.info. Metropolitan Transportation Authority. October 2015. Retrieved 28 January 2016.
  227. Malykhina, Elena (April 25, 2013). "36 NYC Subway Stations Get Wi-Fi". InformationWeek. Retrieved October 13, 2013.
  228. Ted Mann. "30 More Subway Stations Wired for Wi-Fi". WSJ.
  229. "MTA | news | Chatting Underground". www.mta.info. Retrieved 2016-03-13.
  230. Nally, Jonathan (September 30, 2013). "Tunnel vision: getting New York talking". CriticcalComms. Retrieved March 8, 2014.
  231. Moscaritolo, Angela (April 25, 2013). "Cell Phone Service, Free Wi-Fi Arrive at 30 More NYC Subway Stations". PC Magazine. Retrieved October 31, 2013.
  232. "mta.info – Wireless Service At Subway Stations". mta.info.
  233. 1 2 "Start of Next Phase to Connect 37 Stations in Brooklyn and Lower Manhattan in 2016". mta.info. Metropolitan Transportation Authority. November 12, 2015. Retrieved 28 January 2016.
  234. "NYC Subway Signals". nycsubway.org. Retrieved November 19, 2011.
  235. 1 2 "Moving Forward Accelerating the Transition to Communications-Based Train Control for New York City’s Subways" (PDF). Regional Plan Association. May 2014. Retrieved 25 March 2016.
  236. "RPA Signalling Blocks". theatlantic.com. Retrieved March 13, 2016.
  237. "The JoeKorNer – Looking out the Front – Signals". www.thejoekorner.com. Retrieved 2016-02-28.
  238. "www.nycsubway.org: Subway Signals: Train Stops". www.nycsubway.org. 2015-10-21. Retrieved 2015-10-21.
  239. 1 2 3 4 5 6 Somers, James. "Why New York Subway Lines Are Missing Countdown Clocks". The Atlantic. Retrieved 2016-02-28.
  240. Chan, Sewell (2005-01-14). "Subways Run by Computers Start on L Line This Summer". The New York Times. Retrieved 2007-05-24.
  241. 1 2 Neuman, William (May 22, 2007). "For Less Crowding on L Train, Think 2010, Report Says". The New York Times. Retrieved May 24, 2007.
  242. Editor-in-Chief, William C. Vantuono,. "MTA L Line trains go to full CBTC". www.railwayage.com. Retrieved 2016-03-13.
  243. "New Tech Promises Less Subway Crowding, If Albany Doesn’t Beggar the MTA | Streetsblog New York City". Retrieved 2016-02-10.
  244. "2008–2013 MTA Capital Program Accelerated Program Presentation to the Board" (PPT). Metropolitan Transportation Authority (New York). February 27, 2008. pp. 15–16. Retrieved February 28, 2008.
  245. 1 2 3 4 "MTA | news | Know Before You Go with MTA Subway Time&#8482". Mta.info. December 28, 2012. Retrieved April 11, 2014.
  246. 1 2 "NYC Subway accidents". nycsubway.org. 2009. Retrieved December 12, 2009.
  247. "The Mayor to Begin B.R.T Inquiry Today" (PDF). The New York Times. November 1, 1918. p. 24. Retrieved December 12, 2009.
  248. Galea, Sandro; Tracy, M; Piper, T.M.; Bucciarelli, A.M.; Tardiff, K.; Gershon, R; Vlahov, D (November 4, 2009). "Epidemiology of suicide in the New York City subway system". American Public Health Association. Retrieved November 27, 2009.
  249. "Deaths by New York subway train strikes shrank slightly for 2013, MTA says". NY Daily News. December 31, 2013. Retrieved April 13, 2014.
  250. Donohhue, Pete (August 11, 2014). "EXCLUSIVE: MTA is testing sensors, video systems that would save people who fall on subway tracks". NY Daily News. Retrieved August 18, 2014.
  251. "MTA tests motion sensing lasers, thermal image cameras to save fallen straphangers from subway trains". NY Daily News. December 12, 2013. Retrieved April 13, 2014.
  252. Neuman, William (April 5, 2007). "2nd Ave. Subway Platforms May Get Glass Walls and Sliding Doors". New York Times. Retrieved February 10, 2016.
  253. "L Train Platform Eyed for AirTrain-Like Safety Doors in MTA Pilot Program". DNAinfo New York. Retrieved 2016-02-29.
  254. "Safest and riskiest areas of New York's subway system revealed in Daily News investigation". New York Daily News. June 22, 2014. Retrieved March 18, 2016.
  255. 1 2 "If You See Something, Say Something – Subway – Spring 2011". MTA.info (YouTube). April 19, 2011. Retrieved April 19, 2011.
  256. Yakas, Ben. "NYPD Reportedly Wants To Ban "Career Criminals" From Subways". Gothamist. Retrieved 2016-03-18.
  257. Redwine, Tina (March 26, 2012). "MTA Proposes To Ban Those Who Commit Subway Crimes From Riding System". NY1. Retrieved March 27, 2012.
  258. Chaiken, Jan M.; Lawless, M.; Stevenson, K.A. (1974). "The Impact of Police Acitivity on Crime". RAND Corporation.
  259. 1 2 City, Citizens Crime Commission of New York; N.Y.), Regional Plan Association (New York; Center, Downtown Research and Development (1985-01-01). Downtown safety, security, and economic development: a joint report. Downtown Research & Development Center. ISBN 9780915910229.
  260. Kelling, George L. (2009). "How New York Became Safe: The Full Story". City Journal. Retrieved November 24, 2009.
  261. Glazer, Nathan (1979). "On Subway Graffiti in New York" (PDF). National Affairs (54). pp. 3–12. Retrieved November 24, 2009.
  262. "DON'T DO IT (1988)". MTA.info (YouTube). January 9, 2010. Retrieved May 28, 2011.
  263. Wolff, Craig (November 12, 1993). "Subway Crime Declining, New Transit Figures Show". New York Times , USA. Retrieved November 26, 2009.
  264. "Rudy Giuliani". JoinRudy2008.com. Archived from the original on September 4, 2007. Retrieved July 15, 2007.
  265. Levitt, Steven D.: "Understanding Why Crime Fell in the 1990s: Four Factors that Explain the Decline and Six that Do Not", Journal of Economic Perspectives, 18(1), 163–190
  266. "Mayor Michael R. Bloomberg testifies before the Metropolitan Transportation Authority Board" (Press release). November 9, 2004. Retrieved November 26, 2009.
  267. "village voice > nyclife > Forbidden Photos, Anyone? by Matt Haber". 2005-02-28. Archived from the original on February 28, 2005. Retrieved 2016-03-18.
  268. "Threat Of Subway Photo Ban Riseth Again". Gothamist. November 30, 2004. Retrieved July 7, 2008.
  269. Kabak, Benjamin. "Unlawful arrest for subway photography costs city $30K". Second Ave. Sagas. Retrieved 24 November 2015.
  270. "Investigation of Individuals engaged in suspicious photography and video surveillance". New York City Police Department. April 3, 2009. Retrieved 25 March 2016.
  271. "mta.info | Rules of Conduct Section 1050.9 Restricted areas and activities". web.mta.info. Retrieved 2016-03-13.
  272. "American Civil Liberties Union : NYCLU Sues New York City Over Subway Bag Search Policy". 2009-11-01. Archived from the original on November 1, 2009. Retrieved 2016-03-18.
  273. "MacWade v. Kelly (Challenging the NYPD's subway bag-search program)". New York Civil Liberties Union. Retrieved 24 November 2015.
  274. "MTA NYC Transit Introduces New Hazmat Response Vehicle". April 11, 2008. Retrieved April 14, 2008.
  275. Zraick, Karen; Johnston, David (September 15, 2009). "Man in Queens Raids Denies Any Terrorist Link". New York Times. Retrieved January 30, 2014.
  276. "N.Y.C. bomb plot suspect Zazi pleads guilty". CBC. Associated Press News. February 20, 2010. Retrieved January 30, 2014.
  277. Neuman, Sewell Chan and William. "M.T.A. Faces $1.2 Billion Deficit". City Room. Retrieved 2016-02-09.
  278. "City straphangers feel sting as fares hiked again". NY Daily News. Retrieved 2016-03-13.
  279. "MTA/New York City Transit – NYC Transit 2010 Service Reduction Proposals". MTA. 2010-03-19. Retrieved 2016-03-25.
  280. 1 2 Neuman, William (June 26, 2007). "Some Subways Found Packed Past Capacity". The New York Times. Retrieved July 7, 2008.
  281. "Appendix A: Service Needs Assessment Methodology MTA New York City Transit New York City Department of Transportation April 2009" (PDF). MTA New York City Transit. April 2009. Retrieved 25 March 2016.
  282. "The Approval Matrix, bottom left quadrant". New York. April 22, 2013.
  283. Harshbarger, Rebecca (2015-09-21). "Ridership below prediction at new 7 train station". am New York. Retrieved 2015-09-23.
  284. 1 2 "MTA – news – $205.8M in Contracts Approved to Install Communications-Based Train Control System". Metropolitan Transportation Authority (New York). July 20, 2015.
  285. "MTR 124, Whose Mega-Project ? – Planners Say LIRR-Grand Central Project Folly Without Better East Side Transit". www.tstc.org. Retrieved 2016-02-09.
  286. Bloom, Philip M. Plotch and Nicholas D. "Good and Bad News on Second Avenue Subway". Gotham Gazette. Retrieved 2016-04-15.
  287. "East Side Access Draws Opponents – The New York Sun". www.nysun.com. Retrieved 2016-04-15.
  288. 1 2 3 4 Fitzsimmons, Emma G. (2016-05-03). "Surge in Ridership Pushes New York Subway to Limit". The New York Times. ISSN 0362-4331. Retrieved 2016-05-03.
  289. "MTA Will Tap Into Back-Up Fund to Finish Second Ave. Subway On Time: Board". DNAinfo New York. Retrieved March 6, 2016.
  290. 1 2 3 4 "How a Single Mechanical Failure Sparked 625 MTA Delays". Daily Intelligencer. Retrieved 2016-02-29.
  291. Chan, Sewell (January 14, 2005). "Subways Run by Computers Start on L Line This Summer". The New York Times. Retrieved May 24, 2007.
  292. "Capital Program Oversight Committee Meeting: July 2015" (PDF). New York City: Metropolitan Transit Authority (New York). July 2015. Retrieved 11 August 2015.
  293. "MTA 2010–2014 CAPITAL PROGRAM QUESTIONS AND ANSWERS" (PDF). mta.info. Metropolitan Transportation Authority. Archived from the original (PDF) on March 2, 2012. Retrieved March 16, 2016.
  294. "MTA Twenty-Year Capital Needs Assessment 2015–2034" (PDF). mta.info. Metropolitan Transportation Authority. Retrieved March 18, 2016.
  295. "Twenty Year Capital Needs Assessment 2010–2029" (PDF). mta,info. Metropolitan Transportation Authority. Retrieved March 18, 2016.
  296. "Second Avenue Subway FEIS Chapter 2" (PDF). mta.info. Metropolitan Transportation Authority. Archived from the original (PDF) on April 9, 2014. Retrieved March 18, 2016.
  297. "MTA Service Bump Next June Won’t Keep Up With Growth in Subway Trips | Streetsblog New York City". Retrieved 2016-03-13.
  298. Whitford, Emma. "MTA Announces More Frequent Service On 11 Subway Lines, Plus The Times Square Shuttle". Gothamist. Retrieved 2016-03-13.
  299. "mta.info | Your Ride Matters". web.mta.info. Retrieved 2016-03-13.
  300. "mta.info | Your Ride Matters". web.mta.info. Retrieved 2016-03-13.
  301. "mta.info | Your Ride Matters". web.mta.info. Retrieved 2016-03-13.
  302. Rivoli, Dan (May 19, 2015). "NYC subway overcrowding plan to be tested out on some lines". AM New York. Retrieved May 19, 2015.
  303. Rebecca Harshbarger (May 18, 2015). "MTA to fight overcrowding by getting trains out of stations faster". New York Post. Retrieved May 19, 2015.
  304. "Subway Delay Presentation". Scribd. 2015-05-18. Retrieved 2016-03-25.
  305. "MTA Capital Program 2015–2019" (PDF). mta.info. Metropolitan Transit Authority (New York). October 28, 2015. Retrieved 28 October 2015.
  306. "MTA Capital Program Oversight Committee Meeting: January 2016" (PDF). mta.info. Metropolitan Transportation Authority. January 2016. Retrieved January 23, 2016.
  307. "NYC: Look Forward to Finally Riding the Subway Car of the Future". CityLab. Retrieved 2016-02-29.
  308. Mancini, John (2010-10-02). "Search Results". TWC News. Retrieved 2016-03-25.
  309. 1 2 Chan, Sewell. "Why the Subways Flood". City Room. Retrieved 2016-02-28.
  310. Donohue, Pete (August 9, 2007). "Downpour swamps subways, stranding thousands of riders". New York Daily News. Retrieved August 23, 2007.
  311. "MTA Evening Update - August 8, 2007 - NYC.gov". www.nyc.gov. Retrieved 2016-03-13.
  312. "Rain cripples New York City transit". www.chinadaily.com.cn. Retrieved 2016-03-13.
  313. "August 8, 2007 Storm Report" (PDF). Metropolitan Transportation Authority (New York). September 20, 2007. Archived from the original (PDF) on October 29, 2007. Retrieved October 27, 2007.
  314. Dunlap, David W. (September 19, 2008). "New Subway Grates Add Aesthetics to Flood Protection". The New York Times. Retrieved October 7, 2008.
  315. Lee, Jennifer (October 1, 2008). "Three in One — Flood Protection, Benches and Bike Parking". The New York Times. Retrieved October 7, 2008.
  316. "New raised storm grates earn architectural praise". Second Ave. Sagas. Retrieved 2016-03-13.
  317. Boissoneault, Lorraine. "Superstorm Sandy Anniversary – How the Subway Survived". The Weather Channel. Retrieved 24 November 2015.
  318. 1 2 Cox, Jeremiah. "Hurricane Sandy: Effects on Subway & Rail Service". subwaynut.com. Retrieved 2016-03-13.
  319. Aaron Feis, Sabrina Ford and Jennifer Fermino (August 27, 2011). "Hurricane Irene halts NY, NJ mass transit". The New York Post. Retrieved August 28, 2011.
  320. "NYC's subway service running OK Monday after Irene". The Washington Post. August 29, 2011. Retrieved August 29, 2011.
  321. Clark, Roger (August 29, 2011). "Straphangers Have Relatively Easy Monday Morning Rush". NY1. Archived from the original on October 5, 2012. Retrieved August 30, 2011.
  322. "MTA Shuts Down Sunday Night, As Hurricane Nears". The Huffington Post. Retrieved 2016-02-28.
  323. "Rebuilding the Rockaways After Hurricane Sandy". mta.info. Metropolitan Transportation Authority. Archived from the original on November 11, 2012. Retrieved 18 November 2012.
  324. "Cuomo: MTA To Restore A Train Subway Service To The Rockaways « CBS New York".
  325. "MTA on Twitter". Twitter.
  326. "Hurricane Sandy Recovery Service As of November 20" (PDF). Metropolitan Transportation Authority. November 20, 2012. Retrieved 25 March 2016.
  327. "MTA News". mta.info.
  328. Raw: Sandy Leaves NYC Subways Flooded on YouTube
  329. Mann, Ted (2013-03-08). "Downtown, Old Stop on Subway to Reopen". WSJ. Retrieved 2016-03-25.
  330. Flegenheimer, Matt (March 8, 2013). "Storm Damage Prompts Return of Old Subway Stop". The New York Times.
  331. "mta.info – Restoring South Ferry Station". mta.info.
  332. "mta.info – Old South Ferry Station to Reopen for Service". mta.info.
  333. Donohue, Peter (8 December 2014). "$194 million contract awarded to upgrade South Ferry subway station". Daily News (NYDailyNews.com). Retrieved 7 February 2015.
  334. Furfaro, Danielle (2015-10-29). "Sandy-ravaged subway entrance to be closed 9 months". New York Post. Retrieved 2015-10-31.
  335. Marc Santora (January 26, 2015). "Snowstorm Barrels Into Northeast; New York City Subways and Buses Are Halted". NY Times. Retrieved January 26, 2015.
  336. "[UPDATE] NYC Travel Ban Lifted, MTA Service Will Resume This Morning". Gothamist.
  337. ABC News. "Blizzard 2015: New England Gets Walloped by More Than 2 Feet of Snow". ABC News.
  338. Flegenheimer, Matt. "Leaders in New York and New Jersey Defend Shutdown for a Blizzard That Wasn't". New York Times. Retrieved January 28, 2015.
  339. Dolce, Chris; Lam, Linda; Wiltgen, Nick. "Juno: Heavy Snow Continues in New England". Weather.com. The Weather Channel, LLC. Retrieved January 28, 2015.
  340. "NYC grinds to a halt amid deadly East Coast blizzard". USA TODAY. January 23, 2016.
  341. "Above-ground subway service shutting down at 4 p.m.; bus service suspended at noon". Second Ave. Sagas.
  342. "Mass Transit Ramping Back Up After Blizzard". NBC New York.
  343. Kabak, Benjamin. "Less Transit money leads to dirtier stations". Second Ave. Sagas. Retrieved 24 November 2015.
  344. Kabak, Benjamin. "ABC 7: MTA cleaners slacking on the job". Second Ave. Sagas. Retrieved 24 November 2015.
  345. "NYC takes aim at subway rats". United Press International. March 24, 2009. Retrieved June 27, 2009.
  346. "Rats rule the subway rails, platforms", Matthew Sweeney, Newsday, August 13, 2008
  347. Beja, Marc (September 8, 2011). "Rat bites woman in subway station as she waits for train". amNewYork. Archived from the original on November 28, 2011. Retrieved September 12, 2011.
  348. "Rats in subway are health hazard for New Yorkers" Archived March 13, 2010, at the Wayback Machine., Pamela Branch, Brooklyn Today, January 12, 2010
  349. Namako, Tom (March 24, 2009). "You Dirty Rats! New Traps Target Subway Vermin". New York Post. Retrieved June 27, 2009.
  350. Redwine, Tina (October 5, 2011). "MTA To Launch New Cleaning Initiative To Combat Rat Infestations". NY1. Archived from the original on October 8, 2011. Retrieved October 5, 2011.
  351. Epstein, Emily (October 24, 2011). "MTA removes bins hoping to reduce trash". Metro. Retrieved December 13, 2011.
  352. 1 2 "MTA | news | MTA New York City Transit: Trash Can Free Stations Pilot Yields Positive Results". www.mta.info. Retrieved 2016-03-11.
  353. "New York City Has Dirtiest Subway System". 247wallst.com. Retrieved 2016-03-13.
  354. 1 2 3 4 5 "New York Subway Noise Levels Can Result In Hearing Loss For Daily Riders". ScienceDaily. 2016-03-25. Retrieved 2016-03-25.
  355. 1 2 3 "Got Ear Plugs? You May Want to Sport Them on the Subway and Other.... – News – Mailman School of Public Health". Internet Archive. 2010-06-24. Archived from the original on 2010-06-24. Retrieved 2016-03-25.
  356. "Miss Subways through the years: The iconic NYC beauty queens then and now". NY Daily News. Retrieved 2016-02-28.
  357. Bayen, Ann (March 29, 1976). "Token Women". New York Magazine (New York Media, LLC). p. 46.
  358. Klein, Alvin (June 6, 1993). "'On the Town' in Revival at Goodspeed Opera". New York Times.
  359. "Ms. Subway 2004 Crowned". Gothamist.
  360. "METS/YANKEES METROCARD". 1997-06-14. Archived from the original on 1997-06-14. Retrieved 2016-02-15.
  361. Araton, Harvey (2012-07-04). "Nets Move to Brooklyn With Legitimacy in Sight". The New York Times. ISSN 0362-4331. Retrieved 2016-02-07.
  362. McCarthy, Michael (2015-02-21). "The NHL's coming Subway Series: Islanders vs. Rangers". The Sporting News. Retrieved 2016-04-11.
  363. "Press Releases". mta.info.
  364. "WATCH: MTA Adds A Dose Of 'Nostalgia' With Vintage Trains". The Huffington Post. Retrieved 2016-02-10.
  365. "HOLIDAY SUBWAY | | Forgotten New YorkForgotten New York". forgotten-ny.com. Retrieved 2016-03-25.

External links

Wikimedia Commons has media related to:
Wikimedia Commons has media related to New York City Subway timeline.
This article is issued from Wikipedia - version of the Thursday, May 05, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.