E993 series

E993 series

E993 series train on test, June 2004
In service 20022006
Manufacturer Kawasaki Heavy Industries, Tokyu Car Corporation
Scrapped 2006
Number built 5 vehicles (1 set)
Number scrapped 5 vehicles (1 set)
Formation 5 cars per set
Operator(s) JR East
Depot(s) Kawagoe
Specifications
Car body construction Stainless steel/aluminium
Car length 16,050 mm (52 ft 8 in) (end cars), 13,000 mm (42 ft 8 in) (intermediate cars)
Width 3,000 mm (9 ft 10 in)
Height 3,640 mm (11 ft 11 in)
Floor height 1,150 mm (3 ft 9 in)
Maximum speed 120 km/h (75 mph)
Power output 200kW x2 per motor car
Electric system(s) 1,500 V DC
Current collection method Overhead catenary
Safety system(s) ATC, ATS-P, ATS-SN
Track gauge 1,067 mm (3 ft 6 in)

The E993 series (E993系) "AC Train" was an experimental 5-car electric multiple unit (EMU) train operated by East Japan Railway Company (JR East) in Japan between 2002 and 2006.[1][2]

Concept

The E993 series "AC Train" ("Advanced Commuter Train") was developed by JR East to test and evaluate a number of new technologies and features for possible use in future commuter train designs.[1] These included features intended to reduce life-cycle costs, improve the interior passenger environment, improve accessibility, and increase environmental friendliness.[2]

Technological features

The train incorporated the following features for evaluation.[2]

Formation

The 5-car articulated set was based at Kawagoe Depot on the Kawagoe Line and formed as shown below, with car 1 at the Kawagoe end, and car 5 at the Shinjuku end.[3] Cars 1 and 2 were built by Kawasaki Heavy Industries in Kobe, and cars 3 to 5 were built by Tokyu Car Corporation in Yokohama.[2]

Car No. 1 2 3 4 5
Designation Tc' M' M T Tc
Numbering KuHa E992-1 MoHa E992-1 MoHa E993-1 SaHa E993-1 KuHa E993-1

Cars 2 and 4 were each fitted with one single-arm pantograph.[3]

Cars 1 and 2 had double-skin aluminium bodies, cars 3 to 5 had stainless steel bodies with double-skin construction used for cars 3 and 5.[2]

History

The E993 series train being hauled to Koriyama Works for scrapping, July 2006

The train was delivered to JR East's Kawagoe Depot on 17 January 2002.[2] Test running commenced on the Kawagoe Line and Saikyo Line the following month.[2]

The train was officially withdrawn on 14 July 2006.[4]

Features tested on the E993 series, including articulated cars and direct drive motors, were subsequently incorporated in the E331 series prototype train delivered in 2006.

References

Wikimedia Commons has media related to E993 series.
  1. 1 2 JR全車輌ハンドブック2005 [JR Rolling Stock Handbook 2005]. Japan: Neko Publishing. August 2005. p. 374. ISBN 4-7770-0382-5.
  2. 1 2 3 4 5 6 7 プロトタイプの世界 - Prototype World. Japan: Kōtsū Shimbunsha. December 2005. pp. 76–79.
  3. 1 2 JR電車編成表 '05冬号 [JR EMU Formations - Winter 2005]. Japan: JRR. January 2005. p. 66. ISBN 4-88283-042-6.
  4. "JRグループ車両のデータバンク2006/2007" [JR Group Databank 2006/2007]. Japan Railfan Magazine (Japan: Kōyūsha Co., Ltd.) 47 (555): Appendix p.37. July 2007.
This article is issued from Wikipedia - version of the Tuesday, May 26, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.