Green Line "C" Branch

GREEN LINE "C" BRANCH
Beacon Street Line

An outbound train at St. Marys Street station
Overview
Type Light rail
System MBTA
Locale Greater Boston
Termini North Station
Cleveland Circle
Stations 22
Daily ridership 14,579 (2010 typical weekday, surface boardings only)[1]
Operation
Opened October 23, 1932
Owner MBTA
Operator(s) MBTA
Character Underground (Kenmore and eastward)
Dedicated Lane ROW (west of Kenmore)
Rolling stock Kinki Sharyo Type 7
Ansaldobreda Type 8
Technical
No. of tracks 2
Track gauge 4 ft 8 12 in (1,435 mm)
Route map
Legend
"E" Branch

Orange Line
North Station Amtrak Orange 
Haymarket
 Orange 
Orange Line

Government Center
reopening
2016

 Blue 
Tremont Street Subway

Park Street
 Red  Orange  Silver 
Boylston
 Silver 
Boylston Street Subway
Arlington
Copley
Copley Junction
"E" Branch
Hynes Convention Center
Kenmore
"B" Branch

"D" Branch
St. Mary's Street Portal
St. Marys Street
Hawes Street
Kent Street
St. Paul Street
Coolidge Corner
Summit Avenue
Brandon Hall
Fairbanks
Washington Square
Tappan Street
Dean Road

Englewood Avenue
Cleveland Circle| Reservoir
"D" Branch

The "C" Branch, also called the Beacon Street Line or Cleveland Circle Line, is one of four branches of the Massachusetts Bay Transportation Authority's Green Line light rail system in the Boston, Massachusetts metropolitan area. The line begins at Cleveland Circle in Brighton and runs on the surface through Brookline along the median of Beacon Street. Entering Boston, the line goes underground through the St. Marys Street Incline and joins the "B" and "D" Branches at Kenmore. Trains run through the Boylston Street Subway to Copley where the "E" Branch joins, then continue through the Tremont Street Subway to downtown Boston. As of 2013, the "C" Branch terminates at North Station; further service to Lechmere is provided by the "E" Branch.

Traffic signals

The C Branch runs in a dedicated median but has many street crossings

The "C" branch runs on a dedicated median on Beacon Street in Brookline, with a total of 18 grade crossings at major cross streets.[2] Like on its sister "B" branch, "C" branch streetcars must stop on traffic signals at street crossings. The signals on Beacon Street in Brookline could in theory be prioritized to make the Green Line run faster. However, the MBTA, which would be expected to pay for the streetcar sensors, does not consider the project to be cost-effective.[3] In 2007, the Boston Globe published letters from riders who are in favor of these sensors,[4] a letter from the MBTA spokesperson arguing that a major study is needed before the MBTA spends money,[5] and a letter arguing that the T's spokesperson is giving too many excuses.[6]

In January 2008, the MBTA hired a consultant to study the issue.[7] As of 2011, the Town of Brookline was considering formally asking the MBTA to cooperate in setting up traffic signal prioritization to speed up Green Line trains on Beacon Street.[8]

History

Now-discontinued Boeing US Standard Light Rail Vehicle near St. Marys Street in 2005
The St. Marys Street Portal connects the C branch to the Boylston Street Subway

The first tracks on Beacon Street were laid in 1888, running from Massachusetts Avenue west to Coolidge Corner. The next year the rest of the line to Cleveland Circle opened, with access to the Reservoir Carhouse. In 1889, the first electric streetcar route (see Green Line "A" Branch) used Beacon Street from Coolidge Corner east to Massachusetts Avenue, then ran south on Massachusetts Avenue and east on Boylston Street to Park Square. That same year the line on Beacon Street to Cleveland Circle was electrified.

Another connection to the Beacon Street line was provided at Washington Square; streetcars came from Brookline Village along Washington Street and turned west on Beacon Street. This line was later extended north on Chestnut Hill Avenue and west on Commonwealth Avenue to Boston College and was the predecessor of the 65 bus route.

On September 1, 1897, the Tremont Street Subway opened and then or soon after Beacon Street service began to run into it via the Boylston Street Portal at the Public Garden, turning around at Park Street. On October 3, 1914, the Boylston Street Subway extended the underground portion to the Kenmore Incline just east of Kenmore Square, and the underground Kenmore and the St. Marys Street Incline extended it west on October 23, 1932.

Until 1967, when it was named the "C" Branch, the Beacon Street route had the map number 61.

Beacon Street service was extended from Park Street to Lechmere on February 7, 1931. Since then, Beacon Street service has had the following east terminals:[9]

As of 2013, regular C service terminates at North Station.

Station listing

Washington Square station
A train pulls out of Cleveland Circle to change direction for an inbound trip
Station Location Time to Park Street[10] Transfers and notes
North Station to Kenmore segment shared by other Green Line branches
St. Marys Street Beacon Street at St. Marys Street 19 minutes CT2 bus to Sullivan or Ruggles
Hawes Street Beacon Street at Hawes Street 20 minutes
Kent Street Beacon Street at Powell Street 21 minutes
St. Paul Street Beacon Street at St. Paul Street 22 minutes
Coolidge Corner Beacon Street at Harvard Street 24 minutes 66 Bus to Harvard Square or Dudley
Summit Avenue Beacon Street at Summit Avenue 25 minutes Used to be named Winchester Street.
Brandon Hall Beacon Street across from Brandon Hall 26 minutes
Fairbanks Beacon Street at Fairbanks Avenue 27 minutes
Washington Square Beacon Street at Washington Street 28 minutes 65 Bus to Kenmore Square or Brighton Center
Tappan Street Beacon Street at Tappan Street 29 minutes
Dean Road Beacon Street at Dean Road 30 minutes
Englewood Avenue Beacon Street at Englewood Avenue 31 minutes
Cleveland Circle Beacon Street at Chestnut Hill Avenue 32 minutes Nearby to Reservoir and Chestnut Hill Avenue stations

No stations on the "C" Branch have MBTA parking, although some have a small number of locally-controlled parking spots. The only stations with MBTA parking served by "C" streetcars are North Station and Haymarket, which also serve "E" Branch streetcars.[11]

All of the street-level "C" branch stations from St. Marys Street to Englewood Avenue are in Brookline; all the underground subway stops are in Boston and the Cleveland Circle terminus is in Brighton, Boston at street level.

References

  1. "Ridership and Service Statistics" (PDF) (13th ed.). Massachusetts Bay Transportation Authority. 2010. Retrieved 31 July 2011.
  2. "Google Maps". Google Inc. 2011. Retrieved 27 September 2011.
  3. Masis, Julie (2 December 2007). "Beacon gets smart lights, but T isn't along for the ride". The Boston Globe. Retrieved 31 July 2011.
  4. "Letters". The Boston Globe. 9 December 2007. Retrieved 31 July 2011.
  5. "Letters". The Boston Globe. 16 December 2007. Retrieved 31 July 2011.
  6. "Letters". The Boston Globe. 30 December 2007. Retrieved 31 July 2011.
  7. Masis, Julie (27 January 2008). "T may get edge on Beacon St.". The Boston Globe. Retrieved 31 July 2011.
  8. Parker, Brock (January 11, 2011). "Brookline mulling how to speed up C Line along Beacon Street". boston.com (The Boston Globe). Retrieved 2011-08-02.
  9. Belcher, Jonathan (20 July 2011). "Changes to Transit Service in the MBTA district" (PDF). Retrieved 31 July 2011.
  10. Association for Public Transportation, Car-Free in Boston, A Guide for Locals and Visitors, 10th ed. (2003), p. 117.
  11. "Green Line: Cleveland Circle (C)". Massachusetts Bay Transportation Authority. Retrieved 27 September 2011.

External links

Wikimedia Commons has media related to Green Line "C" Branch.
This article is issued from Wikipedia - version of the Thursday, July 30, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.