Seremban Line
1 Seremban Line | |
---|---|
KTM Class 92 train at KL Sentral | |
Overview | |
Native name | Laluan Seremban |
Type | Commuter Rail |
System | KTM Komuter |
Status | Operational |
Locale |
Perak, Selangor, Kuala Lumpur, Negeri Sembilan and Malacca |
Termini |
Rawang Seremban |
Stations | 29 |
Services | Shuttle: Rawang-Tanjung Malim |
Line number | 1 (blue) |
Website |
www |
Operation | |
Opened | August 14, 1995 |
Owner | Keretapi Tanah Melayu |
Operator(s) | KTM Komuter |
Depot(s) |
Rawang Seremban |
Technical | |
Line length | 105.15 km (65.34 mi) |
Track gauge | 1,000 mm (3 ft 3 3⁄8 in) metre gauge |
Electrification | Overhead |
Operating speed | Up to 120 km/h (75 mph) |
KTM Komuter | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Seremban Line (Malay: Laluan Seremban) or Seremban Komuter Line (Malay: Laluan Komuter Seremban) is one of the three KTM Komuter Central Sector provided by Keretapi Tanah Melayu. KTM Komuter is an electrified commuter train service first introduced in 1995, catering especially to commuters in Kuala Lumpur and the surrounding suburban areas. It is a popular mode of transportation for commuters working in Kuala Lumpur, as they can travel to the city without the hassle of traffic congestion. Coaches are modern and air-conditioned. For those who drive to the stations/halts, 'Park & Ride' facility is provided at a nominal charge.
The system is one of the components of the Klang Valley Integrated Transit System.
Line information
Stations
Station Name | Platform type | Interchange station/Notes |
Tanjung Malim | Island & Side | Terminus of the Tanjung Malim branch line. |
Kuala Kubu Bharu | Side | branch line |
Rasa | Side | branch line |
Batang Kali | Side | branch line |
Serendah | Side | branch line |
Rawang | Island & Side | Terminus of the main line. Stairless cross-platform interchange for Tanjung Malim branch line. |
Kuang | Side | |
Sungai Buloh | Side | Exit paid area station to 9 Sungai Buloh-Kajang Line |
Kepong Sentral | Side | |
Kepong | Side | |
Segambut | Side | |
Putra | Side | Cross-platform interchange to 2 Port Klang Line, walking distance of 250 meter exit paid area station to PWTC for 3 Ampang Line. |
Bank Negara | Side | Cross-platform interchange to 2 Port Klang Line, walking distance of 100 meter exit paid area station to Bandaraya for 3 Ampang Line. |
Kuala Lumpur | Island & Side | Stairless cross-platform interchange to 2 Port Klang Line and 200 meter walking distance exit paid area station to Pasar Seni for 4 Kelana Jaya Line & 8 Sungai Buloh-Kajang Line. |
KL Sentral | Island | Cross-platform interchange to 2 Port Klang Line, exit paid area station to 4 Kelana Jaya Line, 6 KLIA Ekspres, 7 KLIA Transit, 200 meter walking distance to 5 Monorail Line & and 600 meter walking distance exit paid area station to Muzium Negara for 8 Sungai Buloh-Kajang Line. |
Mid Valley | Side | |
Seputeh | Side | |
Salak Selatan | Side | The nearest rail transit station is 550 meter exit paid area station to Salak Selatan for 3 Ampang Line despite their same name. |
Bandar Tasik Selatan | Side | Exit paid area station to 3 Ampang Line, 7 KLIA Transit & walking distance to Terminal Bersepadu Selatan. |
Serdang | Side | |
Kajang | Island & Side | Exit paid area station to 8 Sungai Buloh-Kajang Line |
UKM | Side | |
Bangi | Island & Side | |
Batang Benar | Side | |
Nilai | Side | Exit to KLIA & KLIA2 by shuttle bus. |
Labu | Side | |
Tiroi | Side | |
Seremban | Island & Side | With the introduction of KTM Komuter Southern Sector, all commuter service will terminate at this station. |
Rawang-Tanjung Malim Shuttle Service
The KTM Komuter service was expanded to include three new stations beyond Rawang on April 21, 2007 under what was formerly known as the Rawang-Rasa shuttle service. The stations are Serendah, Batang Kali, and Rasa. This 22 km stretch is the first portion of the Rawang-Ipoh double tracking and electrification project to become operational. The service was extended to Kuala Kubu Bharu on January 5, 2008. It was further extended to Tanjung Malim on June 1, 2009, and the service is thus renamed as the Rawang-Tanjung Malim shuttle service.
Passengers have to disembark at Rawang and take the Rawang-Tanjung Malim shuttle service for these stations. Service runs at 30 minutes interval. The first and last trains to leave Rawang are at 05:42 and 21:24 while the first and last trains leaving Tanjung Malim are at 05:42 and 21:54. Journey time between Rawang and Tanjung Malim is 45 minutes.
Seremban-Gemas Shuttle Service
On 1 October 2015 KTMB announced the introduction of the new commuter service for Seremban-Gemas stretch. The new service will be plied by 3-car KTM Komuter trains running the electrified double tracks at speeds up to 140 km/h. Spanning over 100 km, the service will stop at Seremban, Senawang, Sungai Gadut, Rembau, Pulau Sebang/Tampin, Batang Melaka and ends at Gemas.[1]
The service will be offering 59 services daily - 55 services between Seremban and Pulau Sebang and 4 services from Seremban to Gemas. Trains start at 5 am and ends at 11 pm. There will be a 30 minute interval between trains. Travel time from Seremban to Pulau Sebang is estimated to be at 38 minutes while a trip from Seremban to Gemas will take approximately 65 minutes.
The service had been operationally effective 10 October 2015.
KTM Komuter Trial Route
According to the media release issued by KTM, new route for KTM Komuter services will be introduced for the preparation of the infrastructure upgrading works in the Klang Valley Double Tracking project which is due in April 2016. It aims to increase the frequency and the smooth running of the KTM ETS, KTM Komuter, KTM Intercity & Freight at the Central Sector. [2] The current route for Seremban Line from Rawang-Seremban will be changed to Batu Caves-Seremban effective 15 December 2015.
Rolling stock
The line uses KTM Class 92 trains in 6 car formations.
Gallery
-
KTM Komuter section at KL Sentral
-
The (modified—with walls cut open and additional handle bars) interior of a KTM Class 81 EMU
-
A KTM Class 92 SCS 18 commuter train.
External links
- Keretapi Tanah Melayu official website
- KTM Komuter official website
- Keretapi.com - Railway Fan website
- Keretapi Tanah Melayu Railway Fan Club website
See also
References
- ↑ "KTMB introduces new commuter service from Seremban to Gemas". The Malaysian Insider. Retrieved 3 October 2015.
- ↑ KTM Komuter trial route effective 15 December 2015
|
|
|