Upper Hutt Railway Station

Upper Hutt
Metlink suburban rail

Upper Hutt Railway Station, prior to rebuilding.
Location Station Crescent, Upper Hutt, New Zealand
Coordinates 41°7′34.11″S 175°4′13.77″E / 41.1261417°S 175.0704917°E / -41.1261417; 175.0704917
Owned by Greater Wellington Regional Council
Line(s) Wairarapa Line
Platforms Single, Island with bay platform (southern end)
Tracks Main lines: 1
Crossing loops: 1
Sidings: 1 (Bay Platform)
Row sidings: 5 (EMU storage in fenced area)
Private sidings: 1 (to Parapine)
Connections Bus services
Construction
Parking Yes
Bicycle facilities Yes
Disabled access Yes
Other information
Station code UPPE (Metlink)
UPH (KiwiRail Network)
Fare zone 7[1]
History
Opened 1 February 1876
Rebuilt 1955
2015
Electrified 24 July 1955
Services
  KiwiRail Network  
Preceding station   Tranz Metro   Following station
TerminusHutt Valley Line
toward Wellington
toward Masterton
Wairarapa Connection
toward Wellington
Upper Hutt station layout
Legend
to Maymorn
end of electrification
Suburban platform
Main platform
Traction sub-station
Blenheim Street
to Wallaceville

Upper Hutt Railway Station is a suburban railway station serving central Upper Hutt, New Zealand. The station is on the Wairarapa Line, 32.4 km (20.1 mi) north of Wellington, and is served by Tranz Metro on behalf of the Greater Wellington Regional Council. The station is the northern terminus for the electrified Hutt Valley Line to and from Wellington. The diesel-hauled Wairarapa Connection stops at Upper Hutt on its route between Wellington and Masterton.

The station has two platforms, a side platform on the main line and a bay platform on a spur off the main line. Overnight storage of electric multiple units is provided in fenced sidings adjacent to the station. As of 2015, work is underway to rebuild the station.

History

Construction of the Wairarapa Line to Upper Hutt was covered by the River Contract, which was let to contractor Charles McKirdy. The rails reached Upper Hutt in January 1876. Severe flooding at the end of January caused the road between Upper Hutt and Taita to become blocked and damaged, and so to minimise the impact caused by delays to road traffic, the Upper Hutt station was opened on 1 February, despite the concerns of the Public Works Department that the move was premature. The station was not ready for business, as the station and ancillary buildings had not been completed. However, the line and station were handed over to the Provincial Council to run while construction of the line beyond Upper Hutt commenced.

With the line open as far as Upper Hutt, traffic began to increase. Goods traffic initially consisted mostly of timber, followed closely by wool. Passenger services consisted of three weekday return services to Wellington. One effect of the introduction of services between Wellington and Upper Hutt was the reduction in road coach services, which, from the north, terminated at Upper Hutt. Goods wagons, however, continued on to Wellington. Still, railway traffic benefited by a 50% increase due to the establishment of the railhead at Upper Hutt.

The year the station opened, it gained a fourth-class station building, goods shed, coal store, an engine shed and two water tanks for the sum of £2,040. In 1955, as part of the station upgrading programme for the imminent arrival of electric multiple unit working of the Hutt Valley Line, a new station building was erected at Upper Hutt.

While trains only operated as far north as Upper Hutt, they were not protected by fixed signals. It was felt that as services were few, slow, and operated only in daylight hours, signals were not necessary. Upper Hutt was one of the first stations on the Wairarapa Line to receive signals, with initial instructions requiring south-bound trains to wait in the siding or loop, and north-bound trains to take the main line. These signals were first listed in the working timetables of 1887. By 1921, increased traffic was causing operational issues, and it was decided to install new automatic signalling which had been recently developed in the United States. Work began in 1921, and by early 1923 was operating between Wellington and Upper Hutt.

In 1955, with the opening of the Rimutaka Tunnel and deviation, a Centralised Traffic Control system was installed at Upper Hutt station to control main line points and signals between Trentham and Featherston inclusive. However, only one crossover (18) and four signals (8, 23, 23A and 29) at Trentham could be controlled from Upper Hutt; the remainder, which were typically only used on race days at the adjacent Trentham Racecourse, were controlled by a panel at Trentham itself. The semaphore signals were replaced with three-colour searchlight signals. On 6 February 2007, the Upper Hutt signal box was decommissioned and control of the line from Trentham to Featherston was moved to Train Control in central Wellington.

All locomotive hauled passenger trains between Wellington and Upper Hutt were replaced with electric multiple units from 24 July 1955.

2015 rebuild

Greater Wellington Regional Council adopted the regional public transport plan in June 2014 that includes a provision for the upgrade of Upper Hutt station.[2]

Work rebuilding the station commenced on 5 January 2015, starting with upgrading the platform south of the station building. The platform was resealed, services upgraded, and two "butterfly" shelters were installed.[3] The ticket office and staff facilities moved to portable buildings on 11 May 2015, coinciding with the completion of the platform work. Work on asbestos removal started shortly afterwards in preparation for demolition.

Future

The 2011  2012 Regional Rail Plan (RRP) proposes duplicating the track between Trentham and Upper Hutt in 2012. This will increase the frequency of services from Upper Hutt to Wellington.[4]

Services

Rail

Tranz Metro operates Hutt Valley Line electric suburban services between Wellington and Upper Hutt. It also operates the Wairarapa Connection diesel-hauled service between Wellington and Masterton via Upper Hutt. The basic daytime off-peak timetable is:

The basic morning peak timetable is:

Bus

The following Metlink bus routes serve Upper Hutt station:

Previous timetabled stop Metlink Bus Services Next timetabled stop
Emerald Hill
Terminus
110
Upper Hutt
Silverstream Station
towards Petone Station
Terminus 111
Totara Park
Totara Park Shops
towards Totara Park
112
Te Marua
Timberlea
towards Te Marua
114
Poets Block
Royal Sreet at Pak'n Save
towards Trentham Station
115
Pinehaven
Silverstream Station
towards Pinehaven

Gallery

References

Footnotes

  1. Metlink. "Text description of fare zone boundaries". Greater Wellington Regional Council. Retrieved 2011-01-18.
  2. FORBES, MICHAEL (27 June 2014). "Date set for trolleys' exit". The Dominion Post (Wellington: Fairfax New Zealand). Retrieved 27 June 2014.
  3. "Upper Hutt Station upgrade - 5 January 2015". Greater Wellington Regional Council. Retrieved 22 January 2015.
  4. "Regional Rail Plan" (PDF). Greater Wellington Regional Council. November 2011. Retrieved 7 December 2011.

External links

This article is issued from Wikipedia - version of the Tuesday, February 09, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.