List of Apollo mission types
In September 1967, Owen Maynard of the Manned Spacecraft Center in Houston, Texas proposed a series of Apollo missions that would lead up to a manned lunar landing.[1] Seven mission types were outlined, each testing a specific set of components and tasks, and each previous step would need to be completed successfully before the next mission type could be undertaken.[2] These were:
The planned sequence was changed when it became clear the first manned Lunar Module, LM-3, would not be ready in time for the December 1968 launch date of Apollo 8, so Apollo 8 was flown as a lunar orbital mission using just the CSM (sometimes referred to as "the C Prime mission") and the E mission was canceled.
- F - Manned CSM and LM operations in lunar orbit, a "dress rehearsal" for the first landing (Apollo 10)
- G - First manned lunar landing (Apollo 11)
- H - precision landings with up to two-day stays on the Moon, with two lunar Extra-Vehicular Activities or "moonwalks" (Apollo 12, Apollo 13 (planned), Apollo 14)
- I - long duration CSM lunar orbital surveys using a Scientific Instrument Module mounted in an empty Service Module bay. These were incorporated into the J missions.
- J - longer three-day stays using an Extended LM, with three LEVAs and a Lunar Roving Vehicle (Apollo 15, Apollo 16, Apollo 17). Apollo 18 to 20 would have been J missions. Apollo 15 was originally planned as an H mission but was promoted to J as the program was curtailed.
References
- ↑ Murray, Charles, and Catherine Bly Cox. Apollo: The Race to the Moon. New York: Simon and Schuster, 1989. pp. 315-316.
- ↑ "Part 2(D) - July through September 1967". The Apollo Spacecraft — A Chronology. Volume IV. NASA. 1975. Retrieved 2008-01-29.
|
---|
| Rocket tests | | |
---|
| Abort tests | |
---|
| Boilerplate tests | |
---|
| Unmanned missions | |
---|
| Low Earth orbit missions | |
---|
| Lunar orbit missions | |
---|
| Lunar landing missions | |
---|
| Failed missions | |
---|
| |
|