Southern (Govia Thameslink Railway)
| |||||
Overview | |||||
---|---|---|---|---|---|
Franchise(s): |
| ||||
Main Region(s): | London, Sussex, Surrey, Hampshire, Kent | ||||
Other Region(s): | Hertfordshire, Buckinghamshire | ||||
Fleet size: | 297 | ||||
Stations called at: | 213 | ||||
Stations operated: | 156 | ||||
Route km operated: | 666.3 | ||||
National Rail abbreviation: | SN | ||||
Parent company: | Govia Thameslink Railway | ||||
Website: | www.southernrailway.com | ||||
|
Southern[1] is the brand name used by the Govia Thameslink Railway train operating company on the Southern routes of the Thameslink, Southern and Great Northern franchise. It is a subsidiary of Govia, a joint venture between transport groups Go-Ahead and Keolis, and operated the South Central rail franchise since August 2001 and the Gatwick Express service since June 2008.
On 26 July 2015, the franchisee was subsumed into Govia Thameslink Railway, but the existing Southern and Gatwick Express brand identities have been retained alongside those of Thameslink and Great Northern.
Southern operates the majority of commuter services from its Central London terminals at London Bridge and London Victoria to South London and Sussex as well as regional services in parts of Hampshire, Kent and Surrey. It is also provides services between Milton Keynes and Croydon via the West London Line.
Major destinations served include Banstead, Beckenham Junction, Epsom Downs, Epsom, Leatherhead, East Croydon, Mitcham Junction, Sutton, East Grinstead, Uckfield, Caterham, Tattenham Corner, Redhill, Gatwick Airport, Crawley, Horsham, Littlehampton, Worthing, Bognor Regis, Southampton, Portsmouth, Brighton, Eastbourne and Ore.
It also operates services from Brighton to Ashford, Brighton to Seaford, Brighton to Southampton and South Croydon to Milton Keynes.
History
Connex South Central was awarded the Network SouthCentral franchise by the Director of Passenger Rail Franchising. Operations began on 26 May 1996.
In March 2000, the Shadow Strategic Rail Authority (SSRA) announced its intention to relet the franchise from May 2003 with Connex and Govia the shortlisted bidders.[2][3] In October 2000 the SSRA announced that Govia had been awarded the franchise and would operate it from May 2003.[4] Govia negotiated a deal with Connex to buy out the remainder of its franchise, and this was completed in August 2001.[5][6][7] Govia trading as SouthCentral[8] took over operations on 26 August 2001.
The franchise was originally to run for twenty years but in 2002 the Strategic Rail Authority changed the way it wanted investment funded, and Govia was awarded a seven-and-a-half-year franchise until December 2009.[4][9][10]
In May 2004 the franchise was rebranded as Southern in a recall of the pre-nationalisation Southern Railway, using a green roundel logo with Southern in yellow in a green bar.
In April 2007 the Department for Transport (DfT) announced that the Gatwick Express franchise was to be incorporated into the South Central franchise.[11][12] This was part of a plan to increase capacity on the Brighton Main Line, involving the extension of peak-hour services from Gatwick to Brighton and Eastbourne from December 2008. This doubled the number of London to Brighton express trains during those periods.[13]
In December 2008, Southern took over the services on the Redhill to Tonbridge Line from Southeastern.[14]
The South Central franchise end date was brought forward to September 2009 upon the integration of the Gatwick Express service, to allow the new operator to be in place during major changes to the timetable in and around South London in December 2009.[15] In the run-up to the bidding process for the franchise, reports emerged suggesting that Transport for London, the operator of the London Overground service, wished to take control of all overground services in South London, including the 'Metro' area of the South Central franchise.[16][17] However, such a transfer never took place and the DfT put out the entire franchise for tender.
In August 2008 the DfT shortlisted Abellio, Govia, National Express, NedRail and Stagecoach for the new South Central franchise.[18][19][20] In June 2009 the DfT announced that Govia had retained the franchise, to start on 20 September 2009.[21][22]
At the conclusion of the Southern franchise in July 2015, the South Central franchise was merged into the Govia Thameslink Railway franchise.[23][24] However the Southern brand was retained.[25]
In March 2012 the Department for Transport announced that Abellio, FirstGroup, Govia, MTR and Stagecoach had been shortlisted for the new Thameslink, Southern and Great Northern franchise.[26][27] The Invitation to Tender was to be issued in October 2012, with the successful bidder announced in spring 2013. However, in the wake of the collapse of the InterCity West Coast refranchising process, the government announced in October 2012 that the process would be put on hold pending the results of a review.[28]
In December 2012, Southern's London Victoria to London Bridge via Denmark Hill service ceased, being partially replaced by London Overground's new Clapham Junction to Surrey Quays service.
Routes
The network of services operated by Southern includes local suburban ("Metro") services in South London and regional services extending into the southern Home Counties. All routes are south of the river Thames, with the exception of the West London service, which crosses the city via Shepherd's Bush and runs up the West Coast Mainline to Milton Keynes. Along with the Thameslink route, this provides one of the few long-distance National Rail routes to run right across London instead of terminating at one of the London rail termini. Southern routes which do not serve London include the West Coastway and East Coastway Lines along the south coast of Sussex, Kent and Hampshire.
Details of each route, including maps and timetables, are on Southern's website (see External links, below). As of 13 December 2015, its routes off-peak Monday to Saturday, with frequencies in *trains per hour* (tph), include:
Brighton Mainline | ||
---|---|---|
Route | tph | Calling at |
London Victoria to Brighton (semi-fast) | 1 | Clapham Junction, East Croydon, Horley, Burgess Hill |
London Victoria to Brighton (semi-fast) | 1 | Clapham Junction, East Croydon, Gatwick Airport, Hassocks |
Gatwick Express | ||
Route | tph | Calling at |
London Victoria to Brighton (express)[29] | 2 | Gatwick Airport |
London Victoria to Gatwick Airport | 2 | non-stop |
Mainline East | ||
Route | tph | Calling at |
London Victoria to Eastbourne | 1 | Clapham Junction, East Croydon, Gatwick Airport, Haywards Heath, Wivelsfield, Plumpton, Cooksbridge (limited service), Lewes, Polegate, Hampden Park Service runs with Mainline West service to/from Littlehampton (fast) between London Victoria and Haywards Heath, where both services divide/attach. |
London Victoria to Ore | 1 | Clapham Junction, East Croydon, Gatwick Airport, Haywards Heath, Lewes, Polegate, Eastbourne, Hampden Park, Pevensey & Westham, Cooden Beach, Collington, Bexhill, St Leonards Warrior Square, Hastings Service runs with Mainline West service to/from Littlehampton (semi-fast) between London Victoria and Haywards Heath, where both services divide/attach. |
Mainline West | ||
Route | tph | Calling at |
London Victoria to Littlehampton (fast) | 1 | Clapham Junction, East Croydon, Gatwick Airport, Haywards Heath, Burgess Hill, Hove, Shoreham-by-Sea, Worthing, West Worthing, Durrington-on-Sea, Goring-by-Sea, Angmering Service runs with the Mainline East service to/from Eastbourne between London Victoria and Haywards Heath, where both services divide/attach. |
London Victoria to Littlehampton (semi-fast) | 1 | Clapham Junction, East Croydon, Gatwick Airport, Haywards Heath, Preston Park, Hove, Portslade, Shoreham-by-Sea, Lancing, Worthing, West Worthing, Durrington-on-Sea, Goring-by-Sea, Angmering Service runs with the Mainline East service to/from Ore between London Victoria and Haywards Heath, where both services divide/attach. |
London Victoria to Portsmouth Harbour | 1 | Clapham Junction, East Croydon, Gatwick Airport, Three Bridges, Crawley, Horsham, Barnham, Chichester, Havant, Fratton, Portsmouth & Southsea Service runs with the Mainline West service to/from Bognor Regis (semi-fast) between London Victoria and Horsham, where both services divide/attach. |
London Victoria to Bognor Regis | 2 | Clapham Junction, East Croydon, Gatwick Airport, Three Bridges, Crawley, Horsham, Christ's Hospital (1tph), Billingshurst, Pulborough, Amberley (1tph), Arundel, Ford, Barnham Service runs with Mainline West services to/from Portsmouth Harbour or Southampton Central between London Victoria and Horsham, where both services divide/attach. |
London Victoria to Southampton Central | 1 | Clapham Junction, East Croydon, Gatwick Airport, Three Bridges, Crawley, Horsham, Barnham, Chichester, Southbourne, Emsworth, Havant, Cosham, Portchester, Fareham, Swanwick, Netley (limited service), Woolston (limited service), St Denys (limited service) Service runs with Mainline West service to/from Bognor Regis (stopping) between London Victoria and Horsham, where both services divide/attach. |
Coastway East | ||
Route | tph | Calling at |
Brighton to Seaford | 2 | London Road (Brighton), Moulsecoomb, Falmer, Lewes, Southease (1tph), Newhaven Town, Newhaven Harbour, Bishopstone |
Brighton to Lewes | 1 | London Road (Brighton), Moulsecoomb, Falmer |
Brighton to Ore | 1 | London Road (Brighton), Moulsecoomb, Falmer, Lewes, Glynde, Berwick (Sussex), Polegate, Hampden Park, Eastbourne, Hampden Park, Pevensey & Westham, Pevensey Bay (limited service), Normans Bay, Cooden Beach, Collington, Bexhill, St Leonards Warrior Square, Hastings |
Brighton to Ashford International | 1 | Lewes, Polegate, Eastbourne, Bexhill, St Leonards Warrior Square, Hastings, Ore (limited service), Three Oaks (1tp2h), Doleham (limited service), Winchelsea (1tp2h), Rye, Appledore, Ham Street Trains alternate between calling at Three Oaks and Winchelsea, making it difficult to travel between the two stations. Only a few services in peak hours call at both stations (these services also stop at Ore and Doleham). |
Coastway West | ||
Route | tph | Calling at |
Brighton to West Worthing | 2 | Hove, Aldrington, Portslade, Fishersgate, Southwick, Shoreham-by-Sea, Lancing, East Worthing, Worthing |
Brighton to Hove | 2 | |
Brighton to Portsmouth Harbour | 1 | Hove, Portslade, Southwick, Shoreham-by-Sea, Lancing, Worthing, Angmering, Barnham, Chichester, Southbourne, Emsworth, Havant, Fratton, Portsmouth & Southsea |
Brighton to Southampton Central | 1 | Hove, Portslade, Southwick, Shoreham-by-Sea, Lancing, Worthing, West Worthing, Durrington-on-Sea, Goring-by-Sea, Angmering, Ford, Barnham, Chichester, Emsworth, Havant, Cosham, Fareham, Swanwick, Bursledon (limited service), Hamble (limited service), Netley (limited service), Sholing (limited service), Woolston (limited service), Bitterne (limited service), St Denys (limited service) Some peak-time services take an alternative route between Fareham and Southampton Central via Eastleigh. These services stop at Eastleigh (where they reverse) and Southampton Airport |
Littlehampton to Portsmouth & Southsea | 1 | Ford, Barnham, Chichester, Fishbourne, Bosham, Nutbourne, Southbourne, Emsworth, Warblington, Havant, Bedhampton, Hilsea, Fratton |
Littlehampton to Bognor Regis | 1 | Ford, Barnham |
Barnham to Bognor Regis | 1 | |
Oxted | ||
Route | tph | Calling at |
London Victoria to East Grinstead | 2 | Clapham Junction, East Croydon, Sanderstead, Riddlesdown, Upper Warlingham, Woldingham, Oxted, Hurst Green, Lingfield, Dormans |
London Bridge to Uckfield | 1 | East Croydon, Oxted, Hurst Green, Edenbridge Town, Hever, Cowden, Ashurst, Eridge, Crowborough, Buxted On days when Crystal Palace F.C. hosts matches at Selhurst Park, trains additionally call at Norwood Junction (London Bridge-bound trains call before kick-off, Uckfield-bound trains call after kick-off) |
Redhill | ||
Route | tph | Calling at |
London Victoria to Tonbridge | 1 | Clapham Junction, East Croydon, Redhill, Nutfield, Godstone, Edenbridge, Penshurst, Leigh |
London Victoria to Reigate | 1 | Clapham Junction, East Croydon, Redhill |
London Bridge to Horsham | 2 | New Cross Gate, Norwood Junction, East Croydon, Purley, Coulsdon South, Merstham, Redhill, Earlswood, Salfords, Horley, Gatwick Airport, Three Bridges, Crawley, Ifield, Faygate (limited service), Littlehaven |
West London | ||
Route | tph | Calling at |
East Croydon to Milton Keynes Central | 1 | Selhurst, Thornton Heath, Norbury, Streatham Common, Balham, Wandsworth Common, Clapham Junction, Imperial Wharf, West Brompton, Kensington Olympia, Shepherds Bush, Wembley Central, Harrow & Wealdstone, Watford Junction, Hemel Hempstead, Berkhamstead, Tring, Leighton Buzzard, Bletchley |
Metro | ||
Route | tph | Calling at |
London Victoria to London Bridge via Crystal Palace | 2 | Battersea Park, Clapham Junction, Wandsworth Common, Balham, Streatham Hill, West Norwood, Gipsy Hill, Crystal Palace, Sydenham, Forest Hill, Honor Oak Park, Brockley, New Cross Gate |
London Victoria to Epsom via Mitcham Junction | 2 | Clapham Junction, Balham, Mitcham Eastfields, Mitcham Junction, Hackbridge, Carshalton, Sutton, Cheam, Ewell East |
London Victoria to Horsham via Leatherhead | 1 | Clapham Junction, Sutton, Cheam, Ewell East, Epsom, Ashtead, Leatherhead, Box Hill & Westhumble, Dorking, Holmwood, Ockley, Warnham |
London Victoria to Dorking via Epsom | 1 | Clapham Junction, Sutton, Cheam, Epsom, Ashtead, Leatherhead |
London Victoria to Sutton via Norbury | 4 | Battersea Park, Clapham Junction, Wandsworth Common, Balham, Streatham Common, Norbury, Thornton Heath, Selhurst, West Croydon, Waddon, Wallington, Carshalton Beeches.
One train per hour continues to Epsom, calling at Cheam and Ewell East. Another continues to Epsom Downs, calling at Belmont and Banstead |
London Victoria to Sutton via Crystal Palace | 2 | Battersea Park, Clapham Junction, Wandsworth Common, Balham, Streatham Hill, West Norwood, Gipsy Hill, Crystal Palace, Norwood Junction, West Croydon, Waddon, Wallington, Carshalton Beeches |
London Victoria to Caterham via Norbury | 2 | Battersea Park, Clapham Junction, Wandsworth Common, Balham, Streatham Common, Norbury, Thornton Heath, Selhurst, East Croydon, South Croydon, Purley Oaks, Purley, Kenley, Whyteleafe, Whyteleafe South |
London Bridge to Caterham via Forest Hill | 2 | New Cross Gate, Brockley, Honor Oak Park, Forest Hill, Sydenham, Penge West, Anerley, Norwood Junction, East Croydon, South Croydon, Purley Oaks, Purley, Kenley, Whyteleafe, Whyteleafe South |
London Bridge to Tattenham Corner | 2 | Norwood Junction, East Croydon, Purley, Reedham (London), Coulsdon Town, Woodmansterne, Chipstead, Kingswood, Tadworth |
London Bridge to Beckenham Junction via Crystal Palace | 2 | South Bermondsey, Queens Road Peckham, Peckham Rye, East Dulwich, North Dulwich, Tulse Hill, West Norwood, Gipsy Hill, Crystal Palace, Birkbeck |
London Bridge to West Croydon via Norbury | 2 | South Bermondsey, Queens Road Peckham, Peckham Rye, East Dulwich, North Dulwich, Tulse Hill, Streatham, Streatham Common, Norbury, Thornton Heath, Selhurst |
Rolling stock
South Central inherited a fleet of Class 205, Class 207, Class 319, Class 421, Class 423, Class 455 and Class 456 multiple-unit trains from Connex South Central. Southern inherited a Class 73 locomotive and Class 460 Juniper trains from Gatwick Express.
A franchise commitment was to replace all the Mark 1 slam-door stock, resulting in Southern ordering 28 three-car, 139 four-car and 15 four-car dual-voltage Class 377 Electrostars in September 2001 and March 2002 to replace the Class 421, Class 422 and Class 423s.[30]
In August 2002 Southern ordered nine two-car and six four-car Class 171 Turbostars to replace the Class 205s and Class 207s on the routes that are not fully electrified.[31] In 2006 a tenth two-car Class 171 was transferred from South West Trains.
In 2007, Southern ordered 12 four-car, dual-voltage Class 377/5 Electrostars to replace the remaining twelve Class 319s for transfer to First Capital Connect. In March 2008 Go Ahead purchased a further 11 Class 377/5s. All 23 ended up being sublet to First Capital Connect to provide extra stock for the Thameslink Programme Key Output Zero changes from March 2009.
To provide stock for the extended Gatwick Express services to Brighton, in 2008 Southern leased 17 Class 442 Wessex Electrics withdrawn by South West Trains in early 2007. After retaining the franchise in 2009, Southern leased the remaining seven Class 442s. The last of the Class 460 Junipers were withdrawn in September 2012.
To release Class 377/3s for use on London suburban services, Southern introduced a fleet of ex-London Overground Class 313s on the Coastway lines from May 2010.[32][33]
In 2011, Southern announced that, because of delays in procuring new trains for the Thameslink Programme, the 23 Class 377/5s on sub-lease to First Capital Connect would not be returned in time to deliver the operator's planned capacity increases from the December 2013 timetable change. It therefore began a process to procure 130 new vehicles.[34] It was announced in December 2011 that Bombardier had been contracted to supply 26 five-car Class 377/6s.[35] In November 2012 it was announced that an option for a further 40 vehicles was being exercised.[36]
All twenty-four Class 456 sets were transferred to South West Trains in 2014 after the introduction of the Class 377/6 fleet.
Current fleet
Class | Image | Type | Top speed | Number | Cars per set | Routes operated | Built | |
---|---|---|---|---|---|---|---|---|
mph | km/h | |||||||
Class 73 | Electro-diesel locomotive | 90 | 145 | 1[37] | 1 | Thunderbird locomotive | 1965–1967 | |
Class 171 | DMU | 100 | 160 | 171/7 - 10[38] | 171/7 - 2 | Oxted Line (Uckfield branch) Marshlink Line |
2003–2004 | |
171/8 - 6[38] | 171/8 - 4 | |||||||
171/9 - 4[38] | 171/9 - 3 | |||||||
Class 313 | EMU | 75 | 120 | 19 | 3 | West Coastway Line: Brighton – Hove/West Worthing/Portsmouth Harbour and Littlehampton – Barnham/Bognor Regis/Portsmouth & Southsea East Coastway Line: Brighton – Lewes/Seaford Also operate services between Brighton and Littlehampton, Bognor Regis, Eastbourne and Ore during peak hours |
1976–1977 | |
Class 377 | EMU | 100 | 160 | 377/1 - 64 | 377/1 - 4 | Entire Southern network (apart from the Uckfield and Marshlink lines). 377/5 and a number of 377/2 units in use with Thameslink sub-leased from Southern |
2002–2014 | |
377/2 - 6 | 377/2 - 4 | |||||||
377/3 - 28 | 377/3 - 3 | |||||||
377/4 - 75 | 377/4 - 4 | |||||||
377/6 - 26 | 377/6 - 5 | |||||||
377/7 - 8 [39] | 377/7 - 5 | |||||||
Class 442 (5Wes) Wessex Electric | EMU | 100 | 160 | 24[40] | 5 | London Victoria – Gatwick Airport/Brighton (Gatwick Express) London Bridge – Eastbourne Weekends: London Victoria – East Croydon – Brighton (Southern) |
1988–1989 | |
Class 455 | EMU | 75 | 120 | 46[37] | 4 | Suburban services from London Victoria and London Bridge on London Metro | 1982–1984 |
Future fleet
Class | Image | Type | Top speed | Number | Cars per set | Seat layout | Routes operated | Built | Years operated | Notes | |
---|---|---|---|---|---|---|---|---|---|---|---|
mph | km/h | ||||||||||
Class 387/2 | EMU | 110 | 177 | 27 | 4 | 2+2 | Brighton & Gatwick Express route | 2015 | From 2016 | Govia has also announced that, in addition to the new Thameslink trains, it will order new trains for the Brighton and Gatwick Express routes; 108 carriages are expected. | |
Class 170/4 | DMU | 100 | 160 | 4 | 3 | 2+2 | London Bridge - Uckfield | 1999-2004 | From 2016 | Obtained from First ScotRail following transfer of franchise[41] To be converted to Class 171[42] |
Past fleet
Class | Image | Type | Built | Withdrawn | Notes |
---|---|---|---|---|---|
Class 205 (3H) | DMU | 1957–60 | 2004 | Some preserved. | |
Class 207 (3D) | DMU | 1962 | 2004 | Some preserved. | |
Class 319 | EMU | 1987 | 2008 | Transferred to First Capital Connect after being made redundant by newer Class 377 trains. | |
Class 350 Desiro | EMU | 2004-2005 | 2009 | These trains were subleased from London Midland from 2008 to 2009, to provide cover for Class 377 units subleased to First Capital Connect. After newer Class 377 trains were built, these units were returned to London Midland.[43] | |
Class 421 (4Cig) | EMU | 1964–66 | 2005 | Some preserved. | |
Class 423 (4Vep) | EMU | 1967–71 | 2005 | Some preserved. | |
Class 456 | EMU | 1990–1991 | 2013-2014 | Transferred to South West Trains after being made redundant by newer Class 377/6 units. | |
Class 460 (8Gat) Juniper | EMU | 2000–2001 | 2011–2012 | Have been merged to work with Class 458 fleet used by South West Trains. |
Depots
Southern's fleet is maintained at Brighton Lovers Walk and Selhurst depots. The Gatwick Express fleet is maintained at Stewarts Lane. Since December 2014, the Class 455 fleet is now maintained at Stewarts Lane (having transferred from Selhurst).
Future
Southern, as part of its successful bid for the South Central franchise in 2009, made several commitments to improving services across the network.[22] These included:
- Increasing the length of suburban services in South London to 10 cars between 2011 and 2013
- Increasing the service level on all routes in South London to 4 trains per hour (tph) until 23:00 each day, and the introduction of late-night services on Fridays and Saturdays
- The introduction of an hourly service on Sundays between Brighton and Southampton Central, and an increase in the number of late-night services between Brighton and Worthing
- The introduction of late-night services on the London to Uckfield route
- Installation of new ticket gates at 22 stations across the network
- Increasing the number of car-parking spaces at stations by 1,000 and the number of cycle spaces by 1,500
- Cleaning and refreshing of all stations and trains on the network
- Major refurbishments to seven stations: Brighton, Haywards Heath, Hove, Lewes, Redhill, Three Bridges and Worthing
- Class 456 units are to be transferred to South West Trains in 2014 after the 26 new 5-car Class 377/6 fleet enters service with Southern in 2013
Thameslink, Southern and Great Northern (TSGN)
With the last franchise expiring on 26 July 2015, the South Central franchise was merged with the Thameslink Great Northern franchise to create Thameslink, Southern and Great Northern. This is operated by Govia Thameslink Railway, which is also owned by Southern's parent company, Govia. The Southern brand identity has been retained.
Southern has ordered 116 Class 387 "Electrostar" carriages which will be used on the Thameslink route until the new Class 700s are delivered.[44]
Govia operated the Thameslink franchise from March 1997 to March 2006,[45] and was awarded the TSGN franchise in May 2014.[46]
Uckfield–Lewes line
The franchise consultation paper released at the beginning of the 2009 franchising process stated that the ultimate franchise agreement would include a change mechanism to enable the DfT to incorporate additional routes into the South Central franchise, and it invited bidders to submit priced options for schemes put forward by stakeholders. One such scheme could, as indicated in the South Central Franchise Consultation Paper, be the reopening of the Uckfield – Lewes line, closed in 1969.[47] In recent years, several interested parties have been examining the possibility of reopening the line.[48][49]
Future of the franchise
On 21 January 2016 Transport for London announced that, in 2021, it will take over the London suburban parts of the franchise, rebranding the routes as London Overground from that point.[50]
The Key
In 2012, Southern became the first rail company in England to use the ITSO card on its network. The Key is a smartcard similar to Transport for London's Oyster Card. Tickets for the smartcard are available only in Single, Return, Weekly, Monthly and Annual Season tickets.[51] Southern plans to add a Pay-As-You-Go option in the near future, but tests on this are still in progress.[52] There are three types of The Key smartcards: Child, Adult and Staff. All child smartcards need a photograph to prove the age of the holder, while adults who wish to use their smartcard only for single and return tickets do not require a picture. The Key is insured so that if lost or stolen it can be de-activated and the tickets transferred to a new card sent out in the post.[52]
The Key allows customers to buy Plusbus for the Crawley and Brighton areas. This is because Metrobus (which operates in Crawley) and Brighton and Hove Buses are owned by Go-Ahead Group, Southern's parent company. Brighton & Hove Buses also uses The Key on its buses but it is not possible to use a B&H bus key on Southern and vice versa at the moment unless using Plusbus. Southern is looking to change this by the end of 2013.[52]
The Key operates only at stations managed by Southern and outside London because it is not currently compatible with the Oystercard readers. Southern has been working with Transport for London and the Department for Transport to change this, and the Oystercard readers should be compatible by December 2013.[52]
Southern operated a pilot for The Key between Brighton and Seaford in 2010 as these stations are served only by Southern trains (with the exception of Brighton). This was a success and so in 2012 it began to gradually expand across the network. Originally the only ticket type available on The Key was season tickets; in August 2013 Southern added Return and Single tickets to The Key.
Currently (December 2015), The Key is available on the entire Southern network with the exception of the West Coastway Line west of Warblington, the East Coastway Line east of Bexhill, the entire Redhill to Tonbridge Line, the West London Line north of Harrow & Wealdstone and the Mole Valley Line between Bookham and Guildford (which has a limited Southern service).[53]
Criticism
In early 2006, Southern became the focus of attention from cyclists' groups as a result of its policy prohibiting the carriage of ordinary cycles during peak hours on trains destined for London and Brighton.[54]
Southern and sister company Southeastern were criticised in January 2007 for not wishing to introduce Oyster Pay As You Go on its London routes, stating that it was not financially viable. In 2007 Southern introduced Oyster on its Watford Junction to Clapham Junction route,[55] and the company later agreed in principle to the introduction of Oyster across its network,[56] but did not give any firm timescale, managing director Chris Burchell saying
"There are still a number of outstanding issues that need to be discussed with TfL, but we do not believe these will prevent us making PAYG a reality on our network. We look forward to discussions with TfL on how we can make this happen as soon as possible for our passengers."[57]
In its successful franchise bid in 2009, Southern said it was committed to rolling out Oyster Pay As You Go in the London area, but also that such a move was subject to industry agreement.[22] Since 2 January 2010, Oyster Pay As You Go has been valid on all its London routes, along with most other train services in the London area.
In January 2015 Southern hit controversy when it was revealed that the 7.29am Brighton to London Victoria train failed to get in on time on any occasion out of all 240 attempts in 2014.[58] Later in May 2015 it was revealed that Southern had fined passengers for standing in first class on an overcrowded train.[59]
Timetables
Southern was criticised for major changes to its timetables in December 2007 and December 2008.
In December 2007, Southern changed the arrangement for the splitting of services to and from London Victoria on the Arun Valley Line, opting to split trains at Horsham rather than Barnham. Some passengers criticised this change as it increased the journey time to and from London by up to 10 minutes from certain stations, while in the event of services running behind schedule, trains were sometimes not split at Horsham, and proceeded non-stop to Barnham, leaving Arun Valley commuters at Horsham with the prospect of no onward trains.[60]
In December 2008 further timetable changes included the introduction of the extended Gatwick Express services. However, reliability and timekeeping on some of the new services were considered poor, leading to several public meetings being held.[61][62][63] On 22 January 2009, Southern responded to some of these criticisms. During 2009 these services have recorded improved timekeeping and criticisms have since subsided.[64]
The new timetable also led to unhappiness due to the difference in speed and frequency of service between East Coastway services and those on the Brighton Main Line.[65][66]
Until February 2009 Southern used to operate hourly services between Watford Junction and Brighton, but now these services no longer operate from Brighton and now terminate at East Croydon and most services are extended through Watford Junction to Milton Keynes Central.
December 2010 timetable
Further changes to the timetable were made in December 2010; the first timetable change to include many of the requirements of the new franchise. Additional services were included at evenings and weekends. In the London area a 'metro' frequency of service was introduced on most routes with the extension of the weekday daytime four-trains-per-hour norm to late evenings (up to around midnight), Saturdays and Sundays. In addition, new late-night services were introduced from London on Friday and Saturday nights with last trains leaving central London at around 00:30.
Outside London, a new later-evening service was introduced to Uckfield from London Bridge, new late-night services from Brighton along the west coastway and direct services between Southampton and Brighton on Sundays.
Southern's plans for enhanced services between Victoria and Brighton with a new four-trains-per-hour frequency were rejected at the last minute by the Office of Rail Regulation.
See also
References
- ↑ Companies House extract company no 6574965 Southern Railway Limited
- ↑ "South Central rail franchise Due this Month" (Press release). Shadow Strategic Rail Authority. 10 October 2000.
- ↑ "Six Companies Shortlisted for First Franchise Replacement Round" (Press release). Shadow Strategic Rail Authority. 14 March 2000.
- 1 2 "Connex loses rail franchise". BBC News. 24 October 2000. Retrieved 11 June 2009.
- ↑ Proposed acquisition by Govia Limited of Connex South Central Limited. Office of Fair Trading. 16 August 2001.
- ↑ "Completion of Acquisition of South Central Franchise" (Press release). Go-Ahead. 28 August 2001. Archived from the original on 21 October 2001.
- ↑ Annual Accounts 2001. Go-Ahead Group. 30 June 2001.
- ↑ Companies House extract company no 3010919. New Southern Railway Limited formerly South Central Limited.
- ↑ Rail (Peterborough). Issue 444. 18 September 2002. p. 6.
- ↑ Entrain (19) (Sheffield). 30 July 2003. p. 9. Missing or empty
|title=
(help) - ↑ (DFT) Agreement signed to amend Gatwick Express and Southern franchises. whitehallpages Archived 2 November 2013 at the Wayback Machine.
- ↑ "Agreement to amend the Gatwick Express and Southern Franchises" (Press release). Go-Ahead. 19 June 2007.
- ↑ "Gatwick service benefits Brighton". BBC News. 14 December 2008. Retrieved 11 October 2009.
- ↑ December 2008 timetable change. Southeastern News. 4 December 2008.
- ↑ "Agreement signed to amend Gatwick Express and Southern franchises". Department for Transport. 19 June 2007. Archived from the original on 18 July 2007.
- ↑ "Next stop South London". The Londoner. Greater London Authority. 8 March 2008. Archived from the original on 22 January 2009.
- ↑ "UK govt mulling handover of part of Go-Ahead's Southern franchise to TfL". Forbes (New York). 10 March 2008. Retrieved 11 June 2009.
- ↑ "Bidders for South Central franchise announced" (Press release). Department for Transport. 20 August 2008. Archived from the original on 2 November 2013.
- ↑ "Bidders for South Central franchise announced" (Press release). Department for Transport. 20 August 2008. Retrieved 17 June 2009.
- ↑ "Nat Exp and Stagecoach on rail bid shortlist". Reuters. 20 August 2008. Retrieved 11 June 2009.
- ↑ "Retention of South Central franchise" (Press release). Go-Ahead. 9 June 2009.
- 1 2 3 "More frequent and more secure rail services for London and the South East" (Press release). Department for Transport. 9 June 2009. Retrieved 17 June 2009.
- ↑ Official Journal of the European Union Notice. Department for Transport. 19 December 2011.
- ↑ Consultation on the Combined Thameslink, Southern and Great Northern franchise. Department for Transport. May 2012.
- ↑ Thameslink, Southern and Great Northern franchise Go-Ahead Group
- ↑ "Thameslink Franchise OJEU Notice" (PDF). Department for Transport. 19 December 2011. Retrieved 28 December 2011.
- ↑ "Bidders to oversee improvements on rail franchises announced" (Press release). Department for Transport. 29 March 2012.
- ↑ "West Coast Main Line franchise competition cancelled" (Press release). Department for Transport. 3 October 2012.
- ↑ "Brighton train services timetable".
- ↑ Rail (Peterborough). Issue 431. 20 March 2002.
- ↑ Rail (Peterborough). Issue 442. 21 August 2002.
- ↑ "Class 313s come to Southern". Southern Electric Group.
- ↑ Rail (Peterborough). Issue 629. 21 October 2009.
- ↑ "Southern to order more trains as Thameslink slips". Railnews. 19 September 2011. Retrieved 15 November 2011.
- ↑ "Bombardier Wins Additional Order for 130 Electrostar Cars from Southern in the UK" (Press release). Bombardier. 28 December 2011. Retrieved 28 December 2011.
- ↑ "DfT acts to ease Thameslink trains logjam". Railnews. 16 November 2012.
- 1 2 Southern: Useful Information Retrieved 11 February 2010
- 1 2 3 Southern Useful Information - Southern. Retrieved 29 August 2013.
- ↑ "EMU Formations".
- ↑ "Train facilities". Southern. Retrieved 26 December 2013.
- ↑ Clinnick, Richard (29 October 2014). "More DMUs for Southern". RAIL. Retrieved 29 October 2014.
- ↑ Booth, Chris (December 2015). "The Turbostar Family". Today's Railways (Platform 5 Publishing) (168): 38.
- ↑ Desiros for Loan to Southern - Southern Electric Group. Retrieved 6 June 2013.
- ↑ "Bombardier to manufacture 116 new train carriages for Thameslink rolling stock cascade" (Press release). Southern. 17 July 2013.
- ↑ "Franchising Program Continues Apace" (Press release). Strategic Rail Authority. 13 February 2004. Archived from the original on 22 April 2004.
- ↑ "Go-Ahead JV awarded TSGN franchise" (Press release). Go-Ahead Group Plc. 23 May 2014.
- ↑ "South Central Franchise Consultation Paper" (PDF). Department for Transport. 22 May 2008. Archived from the original (PDF) on 4 November 2013. Retrieved 21 August 2008.
- ↑ "Lewes-Uckfield rail line: re-instatement study under way" (Press release). East Sussex County Council. 3 January 2008. Retrieved 11 June 2009.
- ↑ "Green signal to reopen rail line". The Argus (Brighton). 21 June 2006. Retrieved 7 July 2013.
- ↑ "TfL to control all London commuter services and new metro network".
- ↑ As of 28 August 2013 also from https://www.southernrailway.com/smart-card/
- 1 2 3 4 "Unlock the secret to quicker, easier travel with the key".
- ↑ The Key Smartcard : Southern ("Where Can I Use My Key?")
- ↑ "Bicycle policy". Southern. Retrieved 11 October 2009.
- ↑ "Oyster card". Southern. Retrieved 11 October 2009.
- ↑ "Oyster cards for ALL trains". London Evening Standard. 31 January 2007.
- ↑ "Southern say yes to Oyster". Wimbledon Gazette. 3 February 2007. Retrieved 11 June 2009.
- ↑ "Britain's worst train service: Southern's 7.29 Brighton to London train was late every day for a year". The Daily Telegraph (London). 12 January 2015.
- ↑ "Southern Railway fines passengers forced to stand in first class". The Daily Telegraph (London). 19 May 2015.
- ↑ "Rail revolt as trains dump passengers". West Sussex County Times (Horsham). 20 January 2009. Retrieved 4 February 2009.
- ↑ "Commuters form pressure group". Eastbourne Herald. 8 January 2009. Retrieved 26 January 2009.
- ↑ "Record of Meetings". Southern East Coastway Commuters. 24 January 2009. Retrieved 26 January 2009.
- ↑ "News Christmas 2008". Bexhill Rail Action Group. Retrieved 26 January 2009.
- ↑ "News – Southern Railway". Southern. 22 January 2009. Archived from the original on 16 July 2011. Retrieved 26 January 2009.
- ↑ "BRAG's Faster Trains Campaign". Bexhill Rail Action Group. January 2009. Retrieved 26 January 2009.
- ↑ "Rail users want faster trains". Eastbourne Herald. 22 January 2009. Retrieved 26 January 2009.
External links
Wikimedia Commons has media related to Southern (train operating company). |
Preceded by Connex South Central Network SouthCentral franchise |
Operator of South Central franchise 2001 – 2009 |
Succeeded by Southern South Central (incl Gatwick Express) franchise |
Preceded by Gatwick Express Gatwick Express franchise |
Operator of Gatwick Express franchise 2008 – 2009 | |
Preceded by Southern South Central franchise |
Operator of South Central (incl Gatwick Express) franchise 2009 – 2015 |
Succeeded by Govia Thameslink Railway Thameslink, Southern and Great Northern franchise |
Preceded by Southern Gatwick Express franchise | ||
Preceded by Southern South Central (incl Gatwick Express) franchise |
Sub-brand of Thameslink, Southern and Great Northern franchise 2015 – present |
Succeeded by Incumbent |
|
|