Light rail in Sydney

This article is about the modern light rail system in Sydney. For the city's historic tram system, see Trams in Sydney.
Light rail in Sydney
Light rail Hop logo

CAF Urbos 3 on the L1 Dulwich Hill Line.
Overview
Owner Transport for NSW
Locale Sydney
Transit type Light rail
Number of lines 1
Number of stations 23
Annual ridership 6.1 million in 2014-15[1]
Website www.transdevsydney.com.au
Operation
Began operation 31 August 1997
Operator(s) Transdev Sydney
Technical
System length 12.8 km (8 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 V (DC) overhead line
Dulwich Hill Line, in blue

The Sydney light rail network is a form of light rail public transport serving the Australian city of Sydney, New South Wales. The network presently consists of a single 12.8-kilometre (8 mi) line of 23 stations.[2][3] A second line is under construction and two further lines serving Western Sydney have been announced. The network is controlled by Transport for NSW, a statutory authority of the Government of New South Wales.

History

Light rail stops are identified with a red and white L symbol

In the 19th and early 20th centuries, Sydney developed an extensive tram network, which grew to be one of the largest in the world. The increasing rate of private car ownership and the perception that trams contributed to traffic congestion led to the progressive replacement of tram services with buses, with the final section of the tram network closing in February 1961.

In the 1980s and 1990s, the inner city areas of Darling Harbour and Pyrmont were the subject of an urban renewal program. In 1988 the Sydney Monorail opened, connecting Darling Harbour to the Central Business District. With poor integration between the monorail and other transport modes, and the increasing redevelopment of the Pyrmont peninsula - including the establishment of Sydney's first legal casino - it was decided to convert a disused section of the Metropolitan Goods railway line into a light rail line. A section of track between Pyrmont and Haymarket was upgraded and a new on-street section constructed to link the line to Central railway station. The privately owned line opened in August 1997 as the Sydney Light Rail.

The line's owner soon made proposals for a western extension along the disused section of the goods line, plus a new line through the Central Business District from Central to Circular Quay.[4] The western extension opened in 2000, but the company was unsuccessful in its attempts to develop a CBD line, which saw development of light rail stagnate for the remainder of the decade. By contrast, the 2010s have seen major expansion and reform of light rail in Sydney including the announcement and delivery of multiple new infrastructure projects, integration of ticketing with the city's other transport modes, the introduction of new trams and the transfer of the network to full public ownership. The extensions announced during the decade total almost 40-kilometres. If all projects are completed, the network would expand in size from 7.2-kilometres at the start of the decade to approximately 50-kilometres.

Ownership and operation

The original line was set up as a public-private partnership, with the Sydney Light Rail Company awarded a 30.5 year concession, allowing it to operate the line until February 2028, when ownership would pass to the New South Wales Government.[5] The contract gave the company significant control over the commercial arrangements relating to future extensions or interconnecting lines.[6] In August 1998, the owners of the light rail purchased the Sydney Monorail.[7] The company owning the light rail and monorail became known as Metro Transport Sydney and the systems were renamed Metro Light Rail and Metro Monorail.

The Government of New South Wales purchased Metro Transport Sydney on 23 March 2012 for $19.8 million, and the company was placed under the control of Transport for NSW.[8] The purchase removed the contractual restrictions on expanding the light rail network and allowed the government to dismantle the monorail, assisting their plans to redevelop the Sydney Convention and Exhibition Centre.[9][10] The monorail closed on 30 June 2013.[11] From 1 July, the Metro Light Rail brand was phased out as part of part of a broader rebranding and reorganisation of public transport services in New South Wales.[12] The process of shutting down Metro Transport Sydney and transferring assets to Transport for NSW was completed in September 2014.[13]

When it opened in 1997, the system was operated by TNT.[7] In August 1998, the private owners contracted operation of the service to CGEA Transport - a predecessor of the current operator, Transdev.[7][14] In December 2014, Transport for NSW awarded the contract to construct the CBD and South East Light Rail and operate and maintain both lines of the inner city network to the ALTRAC Light Rail consortium, consisting of Alstom, Transdev, Acciona Infrastructure & Capella Capital. The operating contract commenced 1 July 2015 and runs until 2034.[15][16] The network continues to be operated and maintained by Transdev as part of the consortium.[17]

Network

L1 Dulwich Hill Line

Main article: Dulwich Hill Line

The Inner West Light Rail - branded as the L1 Dulwich Hill Line - is the network's original line. It connects the Inner Western suburbs with the Pyrmont peninsula, Darling Harbour and the southern end of the Central Business District. The line operates along a former freight railway, with a short on-street section at the city end. The route opened between Central and Wentworth Park in August 1997.[18] The line was extended west from Wentworth Park to Lilyfield in August 2000 and then south-west from Lilyfield to Dulwich Hill in March 2014.[19][20]

Under construction

CBD and South East line

The CBD and South East Light Rail is a future line that will operate from Circular Quay at the northern end of the Central Business District to Central station at the southern end, then continuing to the south-eastern suburbs. The line is being built to reduce bus congestion in the CBD and provide higher capacity public transport to the Sydney Football Stadium, Sydney Cricket Ground, Randwick Racecourse and the University of New South Wales, which are currently served only by buses. In contrast to the Dulwich Hill Line, the route is mostly on-street and follows a similar path to routes used by the former tramway network. Major construction began in October 2015.[21] The line is projected to open in early 2019.[15]

Planned extensions

Parramatta lines

Main article: Parramatta Light Rail

Parramatta Light Rail is the name given to two planned lines that converge on the Western Sydney centre of Parramatta. The first is a new line running from Strathfield to Westmead, passing through the Sydney Olympic Park events precinct, industrial lands slated for urban renewal and the Parramatta CBD. The second line converts most of the under-utilised existing heavy rail Carlingford line to light rail standards. The Carlingford branch will join the Strathfield branch at Camellia and follow the same route through Parramatta to Westmead.[22] The lines will have no connection to the Inner West or CBD and South East lines.

Tram fleet

All services are operated by a single class of trams. A second class will be added to the fleet to operate services on the CBD and South East Light Rail. All trams to have operated on the system have been articulated, low floor and bi-directional. The system uses standard gauge track and 750 volt direct current electrification.

Urbos 3

Urbos3, fleet number 18
recorded 14 February 2016

Problems playing this file? See media help.

Services on the Inner West Light Rail are provided by a fleet of twelve Urbos 3 trams. A tender for six trams was awarded to Spanish company Construcciones y Auxiliar de Ferrocarriles (CAF) on 16 August 2012.[23] The trams were ordered to service the Dulwich Hill extension and increase service frequencies.[24] The first tram arrived in Sydney on 19 December 2013 and entered service on 24 July 2014.[25][26]

On 11 October 2013, the Government announced an order for six additional Urbos 3 trams to replace the Variotrams that had been providing services on the Inner West Light Rail since the first section of the line opened in 1997.[27] All trams from the additional order entered service by the end of June 2015.[17][28]

The Urbos 3 trams are approximately 33 metres long and feature two double and two single doors on each side. Seats are generally in the transverse configuration - at 90 degrees to the sides of the vehicle.[29] Digital voice announcements and internal dot-matrix displays provide information about the next stop. The trams are numbered 2112, 2114-2124.

Future trams

Citadis X05

As part of the winning consortium to build and operate the CBD and South East Light Rail, Alstom will supply thirty coupled pairs of Citadis X05 trams to provide the services.[30] Original plans for the line intended for the trams to be approximately 45 metres long and use batteries to offer wire free operation in a section of George Street between Bathurst Street and Circular Quay.[31][32] In December 2014, it was announced that the design of the trams would be lengthened to approximately 67 metres and that Alstom's proprietary Aesthetic Power Solution ground-level power supply technology would be used in place of batteries.[33]

Withdrawn trams

Variotram

Two-tone blue tram with doors open
Variotram at Capitol Square in Sydney/Metro Light Rail livery
Interior view
Variotram interior

The network's original rolling stock was the Variotram which was introduced with the opening of the first section of the Inner West Light Rail in 1997. Seven German-designed vehicles were manufactured in Dandenong, Victoria by Adtranz.[34] The Variotram design is modular and was extended for the Sydney system. The capacity of the vehicles is 217 passengers, of which 74 are seated.[35] On tests up to three trams have been coupled together allowing a maximum capacity of 600 passengers if required.[34] They were numbered 2101-2107, continuing the Sydney trams sequence that finished at 2087 with the last Sydney R1-Class Tram.

The vehicles have a floor to rail height of 30 centimetres and the bogies have no axles between the wheels and are powered with hub motors.[34] The design weight was reduced to compensate for the addition of climate-control air-conditioning equipment. Each tram is fitted with three double doors each side which have enhanced safety systems with obstacle detection interlocked with the traction system.[34] Seats are generally in the transverse configuration - at 90 degrees to the sides of the vehicle. In 2014, the original external destination rolls were replaced with dot-matrix displays and digital voice announcements were installed. There are no internal displays. The last Variotram was withdrawn from service after operating overnight between Central and The Star on 27/28 May 2015.[36]

Urbos 2

Pair of Urbos 2s passing each other.
Pair of Urbos 2s on the Dulwich Hill Line

Four leased Urbos 2 trams were introduced on the Inner West Light Rail in 2014. The trams entered service to coincide with the extension of the line to Dulwich Hill, supplementing the Variotrams and ensuring service frequencies on the line could be maintained. The four trams had previously operated in Spain. Three units (2108-2110) were from Vélez-Málaga, where they operated between 2006 and 2012.[37] The other tram (2111) was from Seville. The first tram arrived in Sydney on 4 September 2013.[38] Delivery was completed in November. The trams entered service on 22 March 2014, five days before the opening of the extension to Dulwich Hill.[39] Following the introduction of the Urbos 3 trams in July 2014, the Urbos 2s were withdrawn and returned to Spain.[26] The Urbos 2s were unpopular with passengers and attracted complaints.[40]

The trams featured four double and two single doors on each side. The seats were unpadded and were generally built in the longitudinal seating configuration - running parallel to the sides of the tram body. Digital voice announcements and internal dot-matrix displays provided information about the next stop.

Ticketing

When it first opened, the light rail network used its own paper-based ticketing system. The light rail's ticketing system has gradually been merging with the broader Sydney ticketing system. The network currently has two separate ticketing systems, the traditional paper-based system and a smartcard-based system.

The Opal smartcard was introduced to the light rail network on 1 December 2014. Light rail fares are the same as bus fares but are calculated separately. Once the CBD and South East Light Rail opens, all light rail passengers interchanging with buses will only pay one fare, calculated from the start of their trip on one mode to the end of their trip on the other.[41][42] The Opal validators are located at stops, contrasting with the system for paper tickets, which must be purchased or presented on the trams.

From 1 January 2016, most paper tickets sold or recognised on light rail services have been discontinued. The only tickets still available are single and return tickets.[43] The paper-based system will eventually be completely phased out, achieving full ticketing integration with other public transport services in Sydney.

Potential extensions

Several transport corridors have significant potential to allow for the growth of the network beyond its current route structure.

In December 2012, the State Government released a policy document entitled Sydney's Light Rail Future. The document identified the following priority corridors for investigation by Transport for NSW:[44]

Anzac Parade

Transport for NSW is investigating an extension of the CBD and South East line along the southern Anzac Parade corridor. Three potential options are being examined; a 1.9 kilometre extension to Maroubra Junction, a 5.1 kilometre extension to Malabar and a 8.2 kilometre extension to La Perouse.[45]

Green Square

The City of Sydney Council has recommended that a Light Rail link be built from the city to Green Square, to service the commercial and residential developments currently being constructed in the area and has spent more than $30 million buying land for a light rail corridor.[46][47] In July 2015, New South Wales Transport Minister Andrew Constance stated that the area was likely to be served by a light rail link in the future.[48] This led to a decision in October by the City of Sydney to allocate $445 000 to develop plans for a light rail line from the city to Green Square. The City estimated a link would cost $350–500 million.[47]

The Bays Precinct

The Bays Precinct is a large waterfront area to the west of the Sydney CBD being proposed for urban renewal by the New South Wales Government. The southern part of the precinct is served by the existing Dulwich Hill Line. A planning document released by the government in October 2015 suggested light rail could be extended to the northern part of the precinct, possibly utilising the Glebe Island Bridge.[49]

Bondi

The Waverley Municipal Council advocates the extension of the light rail network to link the current infrastructure to Bondi Junction and Bondi Beach.[50][51][52] The council commissioned AECOM to undertake a feasibility assessment of the reintroduction of light rail on the corridor between Bondi Beach and Bondi Junction (Stage 1) and onto the CBD (Stage 2) to achieve mass transit of passengers and formally requested Transport for NSW consider the CBD to Bondi Beach corridor as a priority route in the Sydney Light Rail Plan.[53] The assessment, published in 2013, recommended the construction of the light rail along a 3.9 km route from Bondi Junction to Bondi Beach along Bondi Road. It investigated three potential connections to the existing light rail network, via Randwick, via Moore Park Road and via Oxford Street but recommended that a more detailed feasibility assessment was necessary to select the route.[54]

See also

References

  1. "5. Service Delivery - Volume Six 2015 Transport". Audit Office of New South Wales. 19 November 2015. Retrieved 25 November 2015. Light rail patronage increased from 3.9 million passengers in 2013-14 to 6.1 million in 2014-15.
  2. "Sydney Light Rail Extension - Stage 1 - Inner West Extension Preliminary Environmental Assessment" (pdf). Transport for New South Wales. July 2010. p. 10. Retrieved 2014-07-05.
  3. "The Light Rail Network - Sydney Fish Markets, The Star Casino, Darling Harbour and Chinatown are all on the list of destinations easily accessible by Sydney Light Rail". Transdev. Retrieved 2014-07-05.
  4. "Nominated Loan Council Allocations For 1998-99". The Australian Treasury Website. 7 May 1998. Retrieved 12 December 2015.
  5. "Sydney Light Rail Extension – Stage 1 Inner West Extension Product Definition Report" (PDF). Transport NSW. July 2010.
  6. Mills, Gordon (1997). "Light Rail in Sydney: Some Privatisation Lessons" (PDF). Agenda 4 (4): 435, 438.
  7. 1 2 3 Stock Exchange Announcement Australian Infrastructure Fund 11 August 1998
  8. Cosgriff, Stuart; Griffiths, Emily (5 July 2012). "Light rail strategy for Sydney". Clayton Utz Insights. Clayton Utz. Retrieved 6 July 2012.
  9. Campion, Vikki (23 March 2012). "Last stop for Sydney Monorail". The Daily Telegraph.
  10. Tan, Gillian (23 March 2012). "Australian Infrastructure Fund sells Metro Transport stake". The Australian (from The Wall Street Journal).
  11. van den Broeke, Leigh (1 July 2013). "Sydney monorail makes its last loop after 25 years of service". The Daily Telegraph.
  12. Saulwick, Jacob (18 April 2013). "All together now: Sydney's public transport united under one 'brand'". The Sydney Morning Herald. Retrieved 5 April 2015.
  13. "Transport for NSW 2013/14 Annual Report" (PDF). Transport for NSW. pp. 329, 344. Retrieved 1 January 2015.
  14. "Light rail in Sydney". Transdev. Retrieved 6 June 2013.
  15. 1 2 "CBD and South East Light Rail contract awarded with earlier delivery date". Transport for NSW. 18 December 2014.
  16. "Transdev consortium achieves financial close on Sydney Light Rail PPP" (Press release). Transdev. 25 February 2015. Retrieved 5 April 2015.
  17. 1 2 Delivering an integrated light rail system: ALTRAC takes over operation of inner west light rail Transport for NSW 2 July 2015
  18. "Sydney's new light rail system". Railway Digest. September 1997. p. 14.
  19. "Sydney's Tram Extension Opens". Railway Digest. September 2000. p. 4.
  20. "Inner West Light rail extension now complete". Transport for New South Wales. 27 March 2014.
  21. "Final countdown to construction: Sydney Light Rail major works start October 23". Transport for NSW. 28 May 2015.
  22. O'Sullivan, Matt (8 December 2015). "Parramatta light rail line via Sydney Olympic Park gets green light". The Sydney Morning Herald.
  23. "Contract awarded for delivery of new light rail vehicles". Transport for NSW. Retrieved 16 August 2012.
  24. "Sydney's Light Rail Future". Transport for NSW. 13 December 2012. p. 12. Retrieved 14 December 2012.
  25. O'Rourke, Jim (20 December 2013). "Sneak peek at Sydney's new trams". The Daily Telegraph. Retrieved 20 December 2013.
  26. 1 2 First new light rail vehicle on the tracks as customer trips pass 1.5 million, Transport for NSW, Retrieved 23 July 2014
  27. "Six more new light rail vehicles for Sydney". Transport for NSW. Retrieved 11 October 2013.
  28. "Inner West Light Rail extension celebrates first year as new light rail vehicles go into operation" (Press release). Gladys Berejiklian. 27 March 2015. Retrieved 5 April 2015.
  29. "Sydney Tram". CAF. Retrieved 1 March 2013.
  30. "Alstom to deliver to Sydney Citadis X05, the latest evolution of its tram range" (Press release). Alstom. February 2015. Retrieved 25 February 2015.
  31. Dean, Emma; Moore, Adam; Bunting, Kathleen (Parsons Brinckerhoff Australia) (21 June 2013). "CBD and South East Light Rail - State Significant Infrastructure Application Supporting Document" (PDF). Transport for NSW. pp. 4, 23. Retrieved 12 July 2013.
  32. "CBD and South East Light Rail - Industry Briefing Session" (PDF). Transport for NSW. 9 April 2013. p. 11. Retrieved 10 April 2013.
  33. "CBD and South East Light Rail – Modification Report" (PDF). Transport for NSW. pp. 25, 66. Retrieved 3 December 2014.
  34. 1 2 3 4 "Sydney Light Rail Construction and Extension". Railway Technology.
  35. "Technical Details and All That Stuff..." (PDF). Metro Transport Sydney. Archived from the original (PDF) on 15 February 2012. Retrieved 2 July 2013.
  36. Sydney Light Rail Vlog 25: Vario Trams: The End Of An Era. 28 May 2015.
  37. "Sydney to lease Velez-Malaga LRVs". International Railway Journal. Retrieved 17 May 2013.
  38. Walker, Ian (4 September 2013). "Early morning tram delivery brings George St to a halt". The Daily Telegraph. Retrieved 4 September 2013.
  39. Inner West Light Rail Extension opens next week Transport for NSW 21 March 2014
  40. "Transport for NSW 2013/14 Annual Report" (pdf). Transport for NSW. 4 April 2014. p. 45.
  41. "Opal to go live on light rail months ahead of schedule". Transport for NSW. 24 November 2014.
  42. Opal rollout extends to light rail Transport Info NSW 25 November 2014
  43. "Most paper tickets no longer sold from 1 January 2016". transportnsw.info. Transport for NSW. Retrieved 13 August 2015.
  44. "Sydney's Light Rail Future". Transport for NSW. 13 December 2012. p. 20. Retrieved 14 December 2012.
  45. "2014 State Infrastructure Strategy Update" (PDF). Infrastructure NSW. p. 40.
  46. "Light Rail". City of Sydney. Archived from the original on 6 October 2012.
  47. 1 2 "Green Square light rail moves another step closer". sydneymedia.com.au. City of Sydney. 30 October 2015.
  48. Saulwick, Jacob (28 July 2015). "Green Square needs light rail, Transport Minister says in break from past". The Sydney Morning Herald. Retrieved 28 July 2015.
  49. Saulwick, Jacob (22 October 2015). "Return of trams to Glebe Island Bridge floated in inner harbour overhaul". The Sydney Morning Herald.
  50. "Waverley Transport Plan". Waverley Municipal Council. December 2011. Retrieved 11 August 2013.
  51. "Call for Light Rail Welcomed by Waverley – But Bring it to Bondi!". Waverley Municipal Council. 4 October 2012. Retrieved 11 August 2013.
  52. Paperny, Daniel (11 October 2012). "Light rail on track for Bondi". Alternative Media Group. Retrieved 11 August 2013.
  53. "Urgent Business for Consideration" (PDF). Waverley Municipal Council. 21 May 2013. Retrieved 11 August 2013.
  54. "Waverley Light Rail Report" (PDF). Waverley Municipal Council. AECOM. Retrieved 11 April 2014.

External links

Wikimedia Commons has media related to Light rail in Sydney.