USS Schuyler (AK-209)
|
History |
United States
|
Name: |
Schuyler |
Namesake: |
Schuyler County, Illinois or Schuyler County, Missouri or Schuyler County, New York |
Ordered: |
MC hull 2163 |
Builder: |
Leathem D. Smith Shipbuilding Company, Sturgeon Bay, Wisconsin |
Laid down: |
27 May 1944 |
Launched: |
date unknown |
Sponsored by: |
Miss Marilyn Hughes |
Acquired: |
20 June 1945 |
Commissioned: |
13 July 1945 |
Decommissioned: |
27 March 1946 |
Struck: |
5 June 1946 |
Identification: |
Hull symbol:AK-209 |
Fate: |
returned to the Maritime Commission, 10 December 1954, for lay up in the National Defense Reserve Fleet, Olympia, WA. |
Status: |
sold to Zidell Corp. for scrapping, 5 February 1971 |
General characteristics [1] |
Class & type: |
Alamosa-class cargo ship |
Type: |
C1-M-AV1 |
Displacement: |
- 2,382 long tons (2,420 t) (standard)
- 7,450 long tons (7,570 t) (full load)
|
Length: |
388 ft 8 in (118.47 m) |
Beam: |
50 ft (15 m) |
Draft: |
21 ft 1 in (6.43 m) |
Installed power: |
1,750 shp (1,300 kW) |
Propulsion: |
|
Speed: |
11.5 kn (13.2 mph; 21.3 km/h) |
Capacity: |
3,945 t (3,883 long tons) DWT |
Complement: |
|
Armament: |
|
USS Schuyler (AK-209) was an Alamosa-class cargo ship that was constructed for the U.S. Navy during the closing period of World War II. She served with distinction in the Pacific Ocean theatre of operations and returned home in 1946 to be placed into the "mothball" fleet where she silently remained until she was scrapped in 1971.
Built in Sturgeon Bay, Wisconsin
Schuyler (AK-209) was laid down under U.S. Maritime Commission contract (MC hull 2163) on 27 May 1944 by Leathem D. Smith Shipbuilding Company, Sturgeon Bay, Wisconsin; sponsored by Miss Marilyn Hughes; acquired by the Navy on 20 June 1945; and commissioned on 13 July 1945, at Galveston, Texas, Lt. B. G. Fold, USNR, in command.
World War II service
Schuyler loaded cargo at Gulfport, Mississippi, and Mobile, Alabama, and sailed from the latter port on 9 August 1945 for the Pacific Ocean. She arrived at Leyte on 28 September; but, due to the end of the war, neither the cargo nor the ship was required there. She remained in the Philippine Islands until the cargo was purchased by the United Nations Relief and Rehabilitation Administration for distribution in China.
The ship then proceeded to Shanghai and discharged her cargo there between 18 January and 22 March. She arrived at Yokosuka on 27 March, was decommissioned and simultaneously returned to the War Shipping Administration on 22 April 1946, and struck from the Navy List on 5 June 1946.
Post-war inactivation
After service under charter to the Japanese government, the ship was laid up on 10 December 1954 in the National Defense Reserve Fleet at Olympia, Washington, where she remained until sold on 5 February 1971 for scrapping.
References
Alamosa-class cargo ship |
---|
| | |
- * = Canceled August 1945
- ** = Canceled August 1945, but completed as Coastal Guide
- † = Canceled August 1945, but completed as Coastal Crusader
|
|
|
---|
| Type C1-M-AV1 | |
---|
| Type C1-M-AV7 | |
---|
| Type C1-M-AV8 |
- Crossing Knot
- Flat Knot
- Marline Bend
- Persian Knot
- Single Hitch
- Solid Sinnet
|
---|
| Type C1-MT-BU1 |
- Arizona Pine
- California Redwood
- Oregon Fir
- Washington Cedar
|
---|
|