Alandur metro station

Alandur Metro
ஆலந்தூர் மெட்ரோ
Chennai Metro Station

Alandur Metro Rail Station
Platforms Side platforms
Construction
Structure type Elevated
Platform levels 2
History
Opened 29 June 2015 (Green Line)
Services
Preceding station   Chennai Metro   Following station
Blue Line
toward Washermanpet
Green Line
Terminus

Alandur Metro station is a station on Lines 1 and 2 of the Chennai Metro, which is currently under construction. The station is one of the two metro stations where Corridor I (Airport–Washermanpet) of the project will intersect with Corridor II (Chennai Central–St Thomas Mount via Egmore and CMBT), the other being the Chennai Central metro station. It is the city's first multi-level railway station.[1] It is the only station where passengers from the two corridors can swap the direction of travel.[2]

The station

As the station acts as a transit point for two different corridors of the Chennai Metro, the two lines are constructed at two different levels at the station—the first one serving the line from Guindy towards Officers Training Academy (OTA) and Chennai airport and the second one for the line from St. Thomas Mount towards CMBT.[3] The two levels are being built at 26.55 m and 35.41 m within the station, connected by means of escalators.[1] Each levels will have two access points for entry and exit.[3] A mezzanine floor—an intermediate level between ground floor and level I—is being built to be utilised for maintenance purpose.[1]

Metro Rail arriving at Alandur station

A total of eight elevators will function at the station—four connecting the ground floor with level I and another four, along with four escalators, connecting level I with level II. The station will have 10 ticket counters apart from 18 automatic ticket-vending machines (ATVMs).[1]

The station will have four access points on the ground floor—two for entry/exit from the front and two more on the rear. Ticket counters, one at either side of the lobby, are located past the access points. Crossing the lobby, passengers can move on to level I using any of the eight escalators and four lifts.[2]

Level I is the alighting point for those travelling on the Guindy–OTA–Airport route. From this level, there are four escalators and lifts leading to level II, from where passengers bound for the Koyambedu–SIDCO–St. Thomas Mount route can embark.[2]

The station will also have disabled-friendly facilities, including separate escalators and entry ramps.[1]

The station is one of the few in the corridor that will have parking facilities.[4]

Receiving sub-station

A 230-kV receiving substation (RSS) is being built by the Tamil Nadu Electricity Board near the station for CMRL project. TNEB would supply 110 kV power from nearby TNEB substation (being built by TNEB) to the RSS, which will be stepped down to 33 kV and 25 kv by two transformers. The station is one of the three stations in the Chennai Metro Rail network to have a 230-kV receiving sub-station for power supply from the state's electricity grid, the other two being Koyambedu and Chennai Central.[5]

Supporting facilities

The Cantonment Board has decided to set up three AC bus shelters at Asar Ghana junction near the metro station, which would become an intermodal transport hub. Each shelter will be spread over 370 sq ft with a seating capacity of 32 passengers and standing capacity of 45. Other facilities at the shelters would include ATM, CCTV, security guards, public urinals, drinking water, coffee-vending machines and announcements about bus arrivals. Commuters will be able to see a bus coming from 500 metres on an LCD screen in the shelter. This would be the first of AC bus shelters in Chennai. The shelters would come up under a PPP model at an estimated cost of 12.5 million, which would be constructed and maintained for five years by a private firm, after which it will hand over the shelters to the board. The firm's revenue generation would be through advertisements in the shelter.[6]

Commercial hub

Alandur station is one of the five stations in the first phase of the Chennai Metro project identified to be converted into commercial hubs, the others being CMBT, Arumbakkam, Ekkattuthangal, and Ashok Nagar. A 118,000 sq ft building with a basement and stilt floor for car park is planned behind the station.[7]

Incidents

On 4 September 2014, a fire broke out in a storage room on the ground floor of the under-construction Alandur metro station in the afternoon. Three fire tenders were rushed to the spot to put out the fire. Nobody was injured in the accident. However, the cause of the fire was not known.[8]

See also

References

  1. 1 2 3 4 5 Karthikeyan, K. (14 April 2012). "Designed for excellence: Alandur to become prime metro station". The Deccan Chronicle (Chennai: Deccan Chronicle). Retrieved 13 Nov 2012.
  2. 1 2 3 Raja Simhan, T. E. (4 May 2012). "Multi-level Metro rail corridor structure coming up at Alandur". Business Line (Chennai: The Hindu). Retrieved 4 Feb 2015.
  3. 1 2 "ஆலந்தூரில் பிரமாண்ட மெட்ரோ ரயில் நிலையம்". Chennai Online (in Tamil) (Chennai: Chennai Online). 14 April 2012. Retrieved 16 Nov 2012.
  4. "Single train trip to equal 16 buses, 300 cars and 600 bikes". The Hindu (Chennai: The Hindu). 29 August 2012. Retrieved 25 Nov 2012.
  5. "Metro rail sets up units to power trains, stations to meet year-end deadline to start services". The Times of India (Chennai). 15 April 2014. Retrieved 18 Apr 2014.
  6. Mathew Philip, Christin (17 September 2014). "3 AC bus shelters planned near Alandur metro station". The Times of India (Chennai: The Times Group). Retrieved 2 October 2014.
  7. TNN (23 September 2014). "In less than a year, you can park, shop and ride at metro rail stations". The Times of India (Chennai: The Times Group). Retrieved 3 February 2015.
  8. Ayyappan, V. (4 September 2014). "Fire breaks out at under construction Metro Rail station in Chennai". The Times of India (Chennai: The Times Group). Retrieved 2 October 2014.

External links

Wikimedia Commons has media related to Alandur metro station.

This article is issued from Wikipedia - version of the Wednesday, March 02, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.