Bartley MRT Station

 CC12 
Bartley MRT Station
巴特礼地铁站
பார்ட்லி
Stesen MRT Bartley
Rapid transit

Platform level of Bartley MRT station.
Location 90 Bartley Road
Singapore 539788
Coordinates 1°20′34″N 103°52′47″E / 1.342756°N 103.879697°E / 1.342756; 103.879697
Operated by SMRT Trains (SMRT Corporation)
Line(s)
Platforms Island
Tracks 2
Connections Bus, Taxi
Construction
Structure type Underground
Platform levels 2
Disabled access Yes
Other information
Station code  CC12 
History
Opened 28 May 2009
Services
Preceding station   Mass Rapid Transit   Following station
towards Dhoby Ghaut
Circle Line
towards HarbourFront
Location

Bartley MRT Station (CC12) is an underground Mass Rapid Transit station on the Circle Line in Singapore. The station is situated along Bartley Road outside Maris Stella High School. There are two exit and entry points for this station which was constructed under Stage 3 of the Circle Line.

History

This station is being built in tandem with the Outer Ring Road System project which consists of extending Bartley Road to Eunos Road via a viaduct over the part of the underground site of the Kim Chuan Depot. As part of the project, Upper Paya Lebar Road was rebuilt and opened on 17 January 2010 as an underpass heading towards MacPherson and Paya Lebar. The station opened first on 28 May 2009 along with the rest of Stage 3 of the Circle Line due to the result of Nicoll Highway collapse on 20 April 2004.[1]

Before the station opened, Singapore Civil Defence Force conducted the third Shelter Open House at this station on 4 April 2009, together with Bishan and Lorong Chuan stations. It also held an open house for the SMRT staff on 1 May. This station was a terminal for the Circle Line until the opening of the Dhoby Ghaut wing of the Circle Line on 17 April.

Art in Transit

The art piece at this station, which called The Coin Mat, consists of a mural consisting of 160,000 one-cent coins embedded in glass, done by Jane Lee.

Station layout

L1 Street Level Bartley Road, Society for the Prevention of Cruelty to Animals (SPCA)
B1 Concourse Faregates, Ticketing Machines, Station Control, Transitlink Counter
B2 Platform A Circle Line towards  CC29  NE1  HarbourFront via  CC13  NE12  Serangoon (→)
Island platform, doors will open on the right
Platform B Circle Line towards  CC1  NS24  NE6  Dhoby Ghaut via  CC11  Tai Seng (←)
track to Kim Chuan Depot

Exits

Transport connections

Rail

Destination First Train Last Train
Mon – Sat Sunday &
Public Holiday
Daily
Circle Line
to CC1 Dhoby Ghaut 5.47am 6.14am 11.42pm
to CC29 HarbourFront 5.16am 5.40am 11.10pm
to CC26 Pasir Panjang 11.41pm
to CC23 one-north 11.57pm
to CC7 Mountbatten 12.19am
to CC17 Caldecott 12.24am

References

  1. "Part of Circle Line opens today". ChannelNewsAsia. 2009-05-28.

External links


This article is issued from Wikipedia - version of the Thursday, November 26, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.