Cantonment MRT Station
CC31 Cantonment MRT Station 广东民地铁站 கெண்டோன்மண்ட் Stesen MRT Cantonment | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
Coordinates | N/A | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) (Circle Line) | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Connections | Taxi | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Platform levels | 2 | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | CC31 | ||||||||||
History | |||||||||||
Opened | 2025 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Cantonment MRT Station (CC31) is a future MRT station in Singapore. The station was announced as part of Stage 6 of the Circle Line in 2015 and slated to be completed in 2025. It is located at Tanjong Pagar Railway Station.
History
This station was first announced on 29 October 2015.[1]
Cantonment station will be built in the vicinity of the Tanjong Pagar Railway Station, with its design inspired by the old train station.
The heritage building, which has been designated as a National Monument, will not be affected, the Land Transport Authority said. However, parts of the former railway station's platform will need to be removed for the new underground Cantonment station.
LTA is looking at several options, which include dismantling and then reinstating the old platform, or creating a replica of the old platform.
|
References
- ↑ "Joint News Release by the Land Transport Authority & Singapore Land Authority - Circle Line 6 - Becoming A Full Circle". Land Transport Authority. 29 October 2015.