British Rail Class 93

British Rail Class 93

Artist’s impression of a Class 93 locomotive
Type and origin
Power type Electric
Builder Siemens, GEC-Alsthom or ABB Traction
Build date Never Built
Total produced None
Specifications
Configuration Bo-Bo
AAR wheel arr B-B
UIC class Bo'-Bo'
Gauge 1,435 mm (4 ft 8 12 in) standard gauge
Length Unknown
Width Unknown
Height Unknown
Loco weight Unknown
Electric system(s) 25 kV AC Catenary
Current collection Pantograph (2 per power car)
Traction motors Asynchronous 3-Phase AC
Loco brake Disc, Tread & Rheostatic
Train brakes Disc
Performance figures
Maximum speed 155 mph (250 km/h)
Power output 5.5 MW (Est.)
Tractive effort Unknown
Loco brakeforce Unknown
Career
Operators Intended for British Rail
Intercity West Coast
Numbers 93001–93040?

British Rail Class 93 is the traction classification assigned to the electric locomotives that were to enter service as part of British Rail (BR)'s InterCity 250 project on the West Coast Main Line (WCML). They would have been capable of travelling at up to 155 mph (250 km/h), and powering a push-pull train of up to nine Mark 5 coaches and a driving van trailer (DVT), similar to the InterCity 225 sets.

The locomotives would have been derived from the Class 91 locomotives that entered service on the East Coast Main Line in 1989, and would thus have traced a lineage back to the Advanced Passenger Train (APT) that was planned to run on the WCML more than a decade earlier.

Tenders to construct the locomotives and rolling stock were issued in March 1991, with an expected in service date of 1995; it was envisaged that up to 30 complete trains would be initially required, with a total cost estimated at £380 million. However, the cancellation of the InterCity 250 project in July 1992 meant that the rolling stock orders were never made.

Speed and aerodynamic properties

The sleek, aerodynamic properties of the Class 93 would have allowed maximum speeds of up to 155 mph (250 km/h). The maximum speed however would initially have been 125 mph (201 km/h) because of signalling and track alignment limitations.

Limited funding

The Intercity 250 project was to be the next major infrastructure project following the East Coast Main Line electrification and delivery of the Intercity 225s. However, BR was also beginning a major upgrade of its suburban and commuter Electric Multiple Unit (EMU) rolling stock on Network SouthEast, with the introduction of the Networker series as well as the construction of the Channel Tunnel lines. As a consequence, funding was limited. This meant that the £380 million for the locomotives added to the required cost of upgrades to the WCML infrastructure was not available. So due to this and other complications, the project was scrapped.

Legacy

A life-size mock-up of the Class 93 is on display at the Midland Railway – Butterley in Swanwick and a 1:20 scale model is displayed in the Warehouse in the National Railway Museum (NRM), York. Prior to the recent announcement of Agility Trains as the preferred bidder for the Intercity Express Programme a number of commentators called for the Intercity 250/Class 93 idea to be revived as the basis for replacement rolling stock on the East Coast Main Line. Even though the Class 93s were never built, the traction characteristics of the locomotives were used in Railtrack WCML feasibility studies to determine the electrification requirements for an upgraded line.[1] Virgin Trains (the operators of the West Coast Main Line franchise after privatisation) consequently ordered new rolling stock for the route, albeit EMUs rather than loco-hauled stock.

References

  1. "West Coast Main Line Modernisation - Feasibility Study Report", WCML Development Company Ltd, 1994.

External links

This article is issued from Wikipedia - version of the Tuesday, December 15, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.