Telok Ayer MRT Station
DT18 Telok Ayer MRT Station 直落亚逸地铁站 தெலுக் ஆயெர் Stesen MRT Telok Ayer | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
Platform A of Telok Ayer MRT station. | |||||||||||
Location |
7 Cross Street Singapore 048416 | ||||||||||
Coordinates | 1°16′56″N 103°50′54″E / 1.282125°N 103.848472°E | ||||||||||
Operated by | SBS Transit DTL | ||||||||||
Line(s) | |||||||||||
Platforms | Side | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Platform levels | 2 | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | DT18 | ||||||||||
Fare zone | 1 | ||||||||||
History | |||||||||||
Opened | 22 December 2013 | ||||||||||
Previous names | Cross Street | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Telok Ayer MRT Station (DT18) is the name for an underground Mass Rapid Transit train station on the Downtown Line Stage 1 in Singapore. It is a 10-minute walk from Raffles Place and is located under Cross Street at the junction with Telok Ayer Street at Tanjong Pagar district.[1]
Art in Transit
The station features artwork located at walls, floors and columns of the station created by Lim Shing Ge titled, "Bulbous Abode". The artwork demonstrates a whimsical dreamscapes of large rocks depicting ancient monuments, reminiscing the background of Chinese immigrants of old.[2]
Station layout
L1 | Street Level | Exit/ Entrance |
B1 | Concourse | Faregates, Ticketing Machines, Station Control |
B2 | Side platform, doors will open on the left | |
Platform B | Downtown Line towards DT19 NE4 Chinatown (→) | |
Platform A | Downtown Line towards DT1 BP6 Bukit Panjang via DT17 Downtown (←) | |
Side platform, doors will open on the left | ||
Exits
- A: Far East Bank Building
- B: China Square Food Centre, Capital Square
- C: Cross Street
Transport connections
Destination | First Train | Last Train | ||||
---|---|---|---|---|---|---|
Mon – Sat | Sunday & Public Holiday | Daily | ||||
Downtown Line | ||||||
to DT1 Bukit Panjang | 6.11am | 6.29am | 12.11am | |||
to DT19 Chinatown | 6.06am | 6.26am | 12.11am |
Gallery
-
Fitting works underway at the south entrance
-
Platform B of Telok Ayer MRT station
References
- ↑ "Cross Street Station". Land Transport Authority. Retrieved 2008-04-07.
- ↑ "Downtown Line 1: Art-In-Transit" (PDF). Land Transport Authority. Retrieved 16 October 2013.
External links
|
This article is issued from Wikipedia - version of the Thursday, January 28, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.