Guangzhou–Dongguan–Shenzhen Intercity Railway
Guangzhou-Dongguan-Shenzhen Intercity Railway 穗莞深城际轨道交通 | |
---|---|
Overview | |
Type | High-speed rail |
Status | Under Construction |
Locale | People's Republic of China |
Termini |
Guangzhou East Airport |
Stations | 18 |
Operation | |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 87 km (54 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Electrification | 50Hz 25,000V |
Operating speed | 160 km/h (99 mph) |
Guangzhou-Dongguan-Shenzhen ICR route map | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Guangzhou–Dongguan–Shenzhen Intercity Railway, also known as Guangzhou-Shenzhen Intercity Railway, is an express regional railway built to high-speed railway standards in the Pearl River Delta of Guangdong, China. The construction route traces roughly along the east bank of the Pearl River,[1] connecting Guangzhou, Dongguan and Shenzhen Bao'an International Airport. It will feature a length of about 87 km,[2] operating at a top speed of 140 kilometres per hour (below the semi high-speed rail threshold of 160 km/h and an ordinary high-speed rail threshold of 200 km/h) using CRH6 EMU trains.[3]
History
Route planning in 2009 within Guangzhou changed several times and then a big change, with Xintang in Guangzhou's Zengcheng District chosen as the originating point, straight into Hongmei, Dongguan. This changed the access to the Guangzhou Metro to Line 13, with future access to the planned Line 16.[4][5] Guangzhou–Dongguan–Shenzhen Intercity Railway originally planned include route of Shenzhen Metro Line 11 and the use of that metro line in an express route to Futian Station in central Shenzhen.[6] However, in September 2010, it was announced that this railway will no longer enter into the Shenzhen city center. Despite this, reservations for extending services into Shenzhen's Futian station at some point in the future still exist.[7][8]
Chronology
- December 21, 2008 - Construction started.[9]
- November 25, 2009 - Dongguan-Changan segment started[10]
- June 6, 2012 - Deletion of Mayong station from plans.[2]
- September 21, 2012 - Dongguan-Shenzhen section started.[11]
- October 17, 2012 - Planning extends to Guangzhou East Railway Station, with renovating and running alongside the Guangzhou-Shenzhen Railway corridor[12] and the transformation of Jishan and Shipai stations will be upgraded for intercity use.
- December 6, 2012 - Shenzhen route basically established, with two sites in Shenzhen: Airport East Station and Qianhaiwan Station.[13]
- May 14, 2013 - Shenzhen section of the railway adjusted again, terminating at Airport Station, cancelling this line running to Airport East and Qianhaiwan stations.[14]
Station List
Guangzhou
- Guangzhou East Railway Station, interchange with Guangzhou-Shenzhen Railway[12]
- Shipai Railway Station, interchange with Guangzhou-Shenzhen Railway[12]
- Jishan Railway Station, interchange with Guangzhou-Shenzhen Railway[12]
- Xiayuan Railway Station, interchange with Guangzhou-Shenzhen Railway[12]
- Xintang Railway Station, interchange with Guangzhou Metro Line 13 & 16 and Guangzhou-Shenzhen Railway, elevated station.[3]
Dongguan
- Zhongtang Railway Station, elevated station
- Wangniudun Railway Station, elevated station.[3]
- Wanghong Railway Station, interchange with Dongguan-Huizhou ICR[2] & Foshan-Dongguan ICR, Dongguan Rail Transit R1 line, elevated station.[3]
- Hongmei Railway Station, elevated station.
- Shatian Railway Station, elevated station.
- Houjie Railway Station, elevated station.
- Humen Railway Station, interchange with Guangzhou-Shenzhen-Hong Kong Express Rail Link, Dongguan Rail Transit R2 line[3]
- Humen South Railway Station, underground station
- Chang'an Habian Railway Station[7][8]
- Chang'an Jinsha Railway Station[7][8]
Shenzhen
- Haishang Tianyuan Railway Station[7][8]
- Heping Railway Station[7][8]
- Airport North Railway Station, (Jichang Bei), interchange with Shenzhen-Maoming High Speed Railway, Shenzhen Metro Line 11[7][8]
- Airport Railway Station, (Jichang), interchange with Shenzhen Metro Line 11 and Shenzhen Bao'an International Airport[14][15]
Future development
It is planned in the future to extend this railway further north eventually extending to Guangzhou Baiyun Airport and Guangzhou North Railway Station. A Sino-French joint venture is pursuing this option. Construction is expected to start in August 10, 2012, with an opening in 2015.
There are possible links too with the proposed Hong Kong-Shenzhen Western Express Railway, allowing for cross-border services and an eventual rail link between Hong Kong Airport with Shenzhen Airport and Guangzhou Airport.
There is also the option to make use of the rail reservation alongside Shenzhen Metro's Line 11 into central Shenzhen at Futian Station.
References
- ↑ 附件F,香港立法會 交通事務委員會鐵路事宜小組委員會,二零零七年一月五日. "北環線和廣深港高速鐵路香港段資料文件]" (PDF).
珠三角城際快速軌道RTS(廣州至深圳段)最高時速 Max. Speed 140 km/h
- 1 2 3 "穗莞深城际轨道减了一个站". June 6, 2012.
- 1 2 3 4 5 "穗莞深城轨东莞境内设10站". June 7, 2012.
- ↑ "增城区新塘镇被改成穗莞深城轨地铁的起点". Archived from the original on July 15, 2009.
- ↑ "新塘将交汇三轨道线穗莞深城轨全程一个钟". May 7, 2009.
- ↑ "远期轨道交通线网方案". 深圳市規劃局. Archived from the original on May 28, 2010.
- 1 2 3 4 5 6 "穗莞深城轨2015年建成 共设15车站深圳占4个". June 7, 2012.
- 1 2 3 4 5 6 "穗莞深城际2015年建成 全线设立15个站点". June 7, 2012.
- ↑ "穗莞深城际轨道干线在深圳开工". December 22, 2008.
- ↑ "穗莞深城際軌道長安段動工 8社區設3個站". November 25, 2009.
- ↑ "穗莞深城轨莞深段已动工 广州到深圳只需20元". September 21, 2012.
- 1 2 3 4 5 "穗莞深将连通到广州东站". October 17, 2012.
- ↑ "福田至九龙乘高铁仅14分钟". December 6, 2012.
- 1 2 "穗莞深城轨莞深段再调:站点少两个投资多16.29亿元". 南方都市报. April 18, 2013. Retrieved May 14, 2013.
- ↑ "設16站 全程1小時 穗莞深鐵路開工". Archived from the original on January 9, 2015.
|