Shenzhen Metro
Overview | |||
---|---|---|---|
Locale | Shenzhen | ||
Transit type | Rapid transit | ||
Number of lines | 5 | ||
Number of stations | 118[1] | ||
Daily ridership |
3,070,000 (2015 Avg.)[2] | ||
Annual ridership | 1.122 billion (2015)[2] | ||
Website |
Shenzhen Metro Group Co.,Ltd. Official website (English)(English)
MTR Corporation (Shenzhen) Official website (Chinese)(Chinese) | ||
Operation | |||
Began operation | 28 December 2004 | ||
Operator(s) |
| ||
Technical | |||
System length | 177.0 km (110.0 mi)[4] | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) (Standard Gauge) | ||
|
Shenzhen Metro | |||||||||||||
Simplified Chinese | 深圳地铁 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 深圳地鐵 | ||||||||||||
Cantonese Jyutping | Sam1zan3 Dei6tit3 | ||||||||||||
Cantonese Yale | Sàmján Dèihtít | ||||||||||||
Hanyu Pinyin | Shēnzhèn Dìtiě | ||||||||||||
|
The Shenzhen Metro is the subway or underground system for the city of Shenzhen in Guangdong province, China. The system opened on 28 December 2004, making Shenzhen the sixth city in mainland China to have a subway after Beijing, Tianjin, Shanghai, Guangzhou, and Wuhan. The Shenzhen Metro currently has 5 lines, 118 stations, and 177 kilometres (110 miles)[4][1] of total trackage in operation. The network underwent rapid expansion prior to the 2011 Summer Universiade, opening 110 km (68 mi) of tracks in June 2011.[5] Currently, there are three lines under construction.[6]
Current System
The current system has five lines and provides a relatively fast and economical way of traveling in the east-central part of Shenzhen, compared to buses and taxis. Line 1 (Luobao) and Line 4 (Longhua) run to the border crossings between the Shenzhen Special Economic Zone and the Hong Kong Special Administrative Region at Luohu/Lo Wu and Futian Checkpoint/Lok Ma Chau, where riders can transfer to Hong Kong's MTR East Rail Line for travel onward to Hong Kong. Each of the five lines intersect all of the other four lines at least once.
Map of Shenzhen Metro
|
Line | Terminals (District) |
Opened | Newest Extension |
Length km |
Stations | Operator | |
---|---|---|---|---|---|---|---|
Line 1 | Luohu (Luohu) |
Airport East (Bao'an) |
2004 | 2011 | 41.04 | 30 | |
Line 2 | Chiwan (Nanshan) |
Xinxiu (Luohu) |
2010 | 2011 | 35.78 | 29 | |
Line 3 | Yitian (Futian) |
Shuanglong (Longgang) |
2010 | 2011 | 41.66 | 30 | |
Line 4 | Futian Checkpoint (Futian) |
Qinghu (Longhua) |
2004 | 2011 | 19.96 | 15 | |
Line 5 | Qianhaiwan (Nanshan) |
Huangbeiling (Luohu) |
2011 | — | 40.00 | 27 | |
Total | 178.44 | 131 |
Line 1 (Luobao Line)
Line 1 also known as the Luobao Line runs westward from Luohu to Airport East. Trains operate every 2 minutes during peak hours and every 4 minutes at other times. All stations in Luobao Line are underground. The line is operated by SZMC (Shenzhen Metro Group).
- 28 December 2004: Luohu – Window of the World
- 28 September 2009: Window of the World – Shenzhen University
- 15 June 2011: Shenzhen University – Airport East[7]
Line 2 (Shekou Line)
Line 2 also known as the Shekou Line runs from Chiwan to Xinxiu. It connects with the Luobao Line at Window of the World, with the Longhua Line at Civic Center, with the Longgang Line at Futian and with the Luobao Line again at Grand Theater. The line is operated by SZMC (Shenzhen Metro Group).
- 28 December 2010: Chiwan – Window of the World[8]
- 28 June 2011: Window of the World – Xinxiu
Line 3 (Longgang Line)
Line 3 also known as the Longgang Line runs from Yitian to Shuanlong in Longgang, in the north-east of the city. Construction began on 26 December 2005.[9] The line is operated by Shenzhen Metro Line 3 Operations, who have been a subsidiary of SZMC (Shenzhen Metro Group) since 11 April 2011.
- 28 December 2010: Caopu – Shuanglong
- 28 June 2011: Yitian – Caopu[10]
Line 4 (Longhua Line)
Line 4 also known as the Longhua Line runs northward from Futian Checkpoint to Qinghu. Trains operate every 8 minutes. Stations from Futian Checkpoint to Lianhua North are underground. The line has been operated by MTR Corporation (Shenzhen), a subsidiary of MTR Corporation, since 1 July 2010.
- 28 December 2004: Fumin – Children's Palace
- 28 June 2007: Futian Checkpoint – Fumin
- 16 June 2011: Children's Palace – Qinghu
Line 5 (Huanzhong Line)
Line 5 also known as the Huanzhong Line runs from Qianhaiwan in the west to Huangbeiling in the east. Construction began in May 2009 and the line opened on 22 June 2011.[11] The Huanzhong Line required a total investment of 20.6 billion RMB. The line is operated by SZMC (Shenzhen Metro Group).
- 22 June 2011: Qianhaiwan – Huangbeiling
Ridership
Annual Ridership | ||
---|---|---|
Year | million riders | ±% p.a. |
2005[12] | 58 | — |
2006[13] | 90 | +55.17% |
2007[14] | 118 | +31.11% |
2008[15] | 136 | +15.25% |
2009[16] | 138 | +1.47% |
2010[17] | 163 | +18.12% |
2011[18] | 460 | +182.21% |
2012[19] | 781 | +69.78% |
2013[20] | 914 | +17.03% |
2014[21] | 1,037 | +13.46% |
2015[2] | 1,122 | +8.20% |
Since opening of the first phase in 2004, there has been steady growth in passenger traffic. In 2009 and 2010, passenger traffic soared with major openings of new phase 2 lines. Since the opening of phase 2 lines there has been a three-fold increase in passenger traffic in 2010.[22] The maximum daily passenger record occurred on May 1, 2014 hit, day traffic of 3,471,800 passengers.[3]
July is the busiest month of the year for the Shenzhen Metro, accounting for 9.3% annual passenger traffic. Subway passenger volume in January the lowest throughout the year, accounting for only 6.7% of annual passenger traffic. This is caused by Shenzhen's large migrant worker population.[23]
History
Early Planning
In late 1983, Party Secretary of Shenzhen Mayor Liang Xiang led a team to Singapore to study its mass transit system. Upon returning decided that 30 meters on each side of Shennan Avenue to protected as a green belt, and set aside a 16-meter wide median reserved for a light rail or light metro line.[24] In 1984, the "Shenzhen Special Economic Zone Master Plan (1985–2000)" pointed out that, with the growing population and traffic in Shenzhen, a light metro system will not have sufficient capacity to meet future demand. Instead the report proposed a heavy rail subway line to be built along Shennan Avenue.[25] The project was finally approved by the Central Planning Department in 1992.[26]
In August 1992, during and re-feasibility and rail network planning, The Shenzhen Municipal Government decided to move from building a light metro line to a heavy rail subway line. The rapid growth of Shenzhen City made a lower capacity light metro line impractical.[27] In 1994, Shenzhen organized the preparation of the "Shenzhen urban rail network master plan" to be incorporated into the "Shenzhen City Master Plan (1996–2010)".[28] The city's vision for an urban rail network consists of nine lines. Of the nine transit lines, three of them will be commuter rail lines upgraded from existing national mainline railways. The total length of the proposed network will be about 270 km. The three upgraded commuter rail lines will overlap the Guangzhou–Shenzhen Railway , Pinghu–Nanshan Railway and Pingyan railway.[28] This plan establishes the basic framework for the Shenzhen Metro network.[29]
Construction Suspended and Restarted
In December 1995, the State Council issued the "moratorium on approval of urban rapid transit projects" to suspend approval of rail transit projects in all Chinese cities except Beijing, Shanghai, and Guangzhou. The Shenzhen Metro project was postponed.[30] In 1996 prior to the handover authorities attempted to restart construction by renaming the project "The Luohu , Huanggang / Lok Ma Chau border crossing passenger rail connection project", stressing that the project is designed to meet the potential growing demand for cross-border passenger traffic after the handover.[28]
In 1997, Shenzhen reapplied it's Subway plans to the State Planning Commission, and received approval in May 1998.[27] The project was renamed the "Shenzhen Metro first phase".[31] On July 1998, Shenzhen Metro Co., Ltd. was formally established.[31] By April 1999, the subway project feasibility study report has been approved by the state.
First phase
Construction of the first sections of Line 1 (Luobao) and Line 4 (Longhua) began in 1999. The grand opening of the Shenzhen Metro system occurred at 5:00pm on Tuesday, December 28, 2004. Initially the trains operated at 15-minute frequencies and consisted of Line 1 services between Luohu and Shijie Zhi Chuang (now Window of the World) and the Line 4 services between Fumin and Shaonian Gong (now Children's Palace). Initially the English names of the stations were rendered in Hanyu Pinyin, but some of the names were changed to English translation with American spelling in mid-2011.
The Futian Checkpoint station opened on 28 June 2007 using the name Huanggang.[32]
Name Change
On April 23, 2008, Shenzhen Municipal Planning Bureau announced that it would change the nomenclature of Shenzhen's subway lines. Instead of using numbers as the lines official designation, as typically used in other mainland Chinese metro systems, lines will be given Chinese names more akin to the Hong Kong MTR.[33] On 23 October 2013, SZMC (Shenzhen Metro Group) combined both the number with the name for the current operational lines and the future lines will be in number only.[34] The name changes are as follows:
Original Naming Scheme | 2008–2013 Naming Scheme | Current Naming Scheme |
---|---|---|
Line 1 | Luobao Line | Line 1 (Luobao Line) |
Line 2 | Shekou Line | Line 2 (Shekou Line) |
Line 3 | Longgang Line | Line 3 (Longgang Line) |
Line 4 | Longhua Line | Line 4 (Longhua Line) |
Line 5 | Huanzhong Line | Line 5 (Huanzhong Line) |
Line 6 | Guangming Line | Line 6 |
Line 7 | Xili Line | Line 7 |
Line 8 | Yantian Line | Line 8 |
Line 9 | Meilin Line | Line 9 |
Line 11 | Airport Line | Line 11 |
Second Phase
From 2004 to 2007, there was a lack of official government interest and attention to expanding the subway after completion of Phase 1.[35] For three years, there has been little or no construction. Subway construction speed was reiculed as "earthworm speed".[36] In January 17, 2007 Shenzhen won the right to host the 2011 Universiade. In the bid Shenzhen committed to complete 155 km of subway lines before the games.[35]
Shenzhen Metro increased to over a hundred operating metro stations in June 2011, before the Shenzhen Universiade games. In the span of two weeks, the network expanded from 64 km to 177 km. This expansion increased rail transit's share of total public transit trips from 6% to 29% in 2014.[21]
|
|
|
in km |
| |
28 September 2009 | Line 1 - section 2 (trial) | Window of the World | Shenzhen University | 3.39 | 3 |
28 December 2010 | Line 2 - phase 1 | Chiwan | Window of the World | 15.1 | 12 |
Line 3 - phase 1 section 1 | Shuanglong | Caopu | 25.6 | 16 | |
15 June 2011 | Line 1 - section 2 | Shenzhen University | Airport East | 23.6 | 12 |
16 June 2011 | Line 4 - phase 2 | Children's Palace | Qinghu | 15.9 | 10 |
22 June 2011 | Line 5 | Qianhaiwan | Huangbeiling | 40.0 | 27 |
28 June 2011 | Line 2 - east extension | Window of the World | Xinxiu | 20.65 | 17 |
Line 3 - phase 1 section 2 | Caopu | Hongling | 7.72 | 6 | |
Line 3 - west extension | Hongling | Yitian | 8.8 | 8 |
Expansion Plans
Network Phase 3 and Phase 3 Extension
Phase 3 formally commenced in May 2011 with an expected cost of 80 billion yuan. The implementation period has been changed from 2011–2020 to 2011–2016.[37] It will cover Lines 6 (Guangming), 7 (Xili), 8 (Yantian), 9 (Meilin), and 11 (Airport) and will extend the length of the Shenzhen Metro to 348 kilometres and 10 lines.[6][38] In June 2011, the Shenzhen Urban Planning and Land Resources Commission started gather public input on Phase III station names.[39] Anticipated development and growth in Longgang has prompted officials to fast track the planning and construction of Line 10 (formerly Line 16), from Futian Free Trade Zone to Pinghu via Meilin, to start in 2015 instead of after 2020.[40][41][42] Although Line 10 is not part of the original three projects (Lines 7, 9 and 11) approved by the National Development and Reform Commission, the project was fast tracked in order to ease the pressure on Line 4 and accommodate further growth of the Longgang area.[43][44] According to the original plan, the northern section of Line 10 runs through Fenggang town of the neighboring Dongguan City. Due to legal and government coordination issues, Line 10 will temporarily terminate in Pinghu, with capability to extend further north into Dongguan.[45]
|
|
|
in km |
|
| |
30 June 2016 | Line 11 | Futian | Bitou | 51.7 | 18 | Testing[46][47][48] |
End of 2016 | Line 7 | Xili Lake | Tai'an | 30.3 | 28 | Construction nearly completed, first train arrived.[48][49][50] |
Line 9 | Hongshuwan | Wenjin | 25.3 | 22 | Construction nearly completed, first train arrived.[48][49] | |
2017 (structural works only, actual opening time TBC) | Line 9 west extension | Hongshuwan | Hanghai Road | 10.8 | 8 | Under Construction[51][52][53] |
Line 5 south extension | Qianhaiwan | Chiwan | 8.6 | 7 | Under Construction[54] | |
2019 | Line 6 | Shenzhen North | Songgang | 37.9 | 20 | Under Construction[48][55][56][57] |
Line 10 | Futian Checkpoint | Pinghu Center | 28.8 | 23 | Under Construction[55][58][59] | |
2020 | Line 8 | Yantian Road | Kuichong Cultural Plaza | 24 | 12 | Under study, Monorail preferred, Construction may start in 2016[60] |
Line 2 east extension 2 | Xinxiu | Liantang | 3.82 | 3 | Under construction west of Liantang East.[52][53] | |
Line 4 north extension | Qinghu | Niuhu | 10.6 | 8 | Approved, Construction start in 2016[52][53] | |
2020 | Line 3 south extension | Yitian | Baoshuiqu | 1.5 | 1 | Approved, Construction start at end of 2015[52] |
Line 3 east extension | Shuanglong | Liulian | 9.4 | 6 | Approved, Construction start in 2016[52][53] | |
Line 6 south extension | Shenzhen North | Science Museum | 11.5 | 6 | Approved, Construction start in 2016[52][53] | |
Network Phase 4 Expansion
With the shortening of the Phase III implementation period,[37] a number of lines (Lines 16 and 12) planned in 2007's Phase III moved into the next phase which could possibly be completed by 2020.[61] By 2016, it was determined that Phase 4 will have an implementation period between 2017 and 2022 and consist of 274 km of new subway.[62]
|
|
|
in km |
|
| |
Before 2022 | Line 6 Branch | Lilin | Sun Yat-sen University | TBC | TBC | Planned |
Line 8 Phase 2 | Xiaomeisha | Dapeng | TBC | TBC | Planned | |
Line 10 East Extension | Futian Checkpoint | Futian Free Trade Zone | TBC | TBC | Planned | |
Line 11 East Extension | Futian | Huangbeiling Station | TBC | TBC | Planned | |
Line 12 | Taiziwan | New Exhibition Center North | 20.7 | TBC | Planned | |
Line 13 | Shenzhen Bay Checkpoint | Gongming Square | 38.6 | TBC | Planned | |
Line 14 | Huangmugang | Pingdi / Kengzi | 67.5 | TBC | Planned | |
Line 15 | Dachan Bay | Mawan | TBC | TBC | Planned | |
Line 16 | Universiade | Xinqiao Industrial Zone | 27.8 | TBC | Planned | |
Line 17 | Luohu | Pinghu | TBC | TBC | Planned | |
Line 20 | Airport North | Great Airport New Town | 11.5 | TBC | Planned | |
Long-term Plan
In the Shenzhen Metro 2007 masterplan has a further 4 lines ( Line 13 Line 14 Line 15 Line 16) which have a planned completion target of 2030.[63] In 2012, 4 further lines Qiannan (Line 17), Pinghu (Line 18), Pingshan (Line 19) and Fuyong (Line 20) where unveiled. This brings the total planned length of the Shenzhen metro to 720 km spread out over 20 lines. In addition to metro lines, 5 Pearl River Delta Rapid Transit lines connecting neighboring urban centers in the Pearl River Delta, totalling 146 km, have also been revealed.[64]
|
|
|
in km |
|
| |
After 2022 | Bao'an-Longgang Line | Shiyan | Buji East | TBC | TBC | Planned |
107 Line | Hongshuwan South | Xitou | TBC | TBC | Planned | |
Sungang Line | Laojie | Mawan | TBC | TBC | Planned | |
Central Axe Line | Shangsha | Guanlan North | TBC | TBC | Planned | |
Nanshan - Longgang(Longhua) Line | TBC | TBC | TBC | TBC | Planned |
Extended Intercity Proposal
Aside from the set masterplan, at the 12th Guangdong Provincial People's Congress in January 2014,[65] it was proposed to extend Line 4 (Longhua Line) beyond the planned Phase III terminus at the Songyuan Bus Terminal in Guanlan. The proposal wanted to further extend this line to reach the future planned Dongguan Metro Line R4 at Tangxia station. This proposal aims to shorten the distance between the two cities in residents' minds, boost tourism industries in both cities and expand housing options. It would also allow for direct connection between Hong Kong and Dongguan. As the area in the proposed area is less developed, the cost in building the line is expected to be reasonable, with a feasibility study yet to be conducted.
Fares and tickets
Metro rides are priced according to distance travelled, and fares vary from 2 RMB to 11 RMB.[66] Since December 2010 fares are based on a usage fee (2 RMB) + a distance fee. The distance fee is 1 RMB for each 4 km from 4 km to 12 km; after that 1 RMB for each 6 km from 12 km to 24 km and finally 1 RMB for every 8 km over 24 km distance.[67]
Children under the height of 120 cm or aged below 6 may ride for free when accompanied by an adult.[68] The metro also offers free rides to senior citizens over the age of 65, the physically disabled and military personnel. Tickets for children between 120 cm and 150 cm, or aged between 6 and 14 years, or middle scheool students, are half price.
Metro fares can be paid for with single-ride tokens, multiple-ride Shenzhen Metro TransCards or weekly passes.[69]
Tokens
When using cash, a green RFID token is purchased and used for the journey. The fare machines offer English and Chinese options. The purchaser touches a station name to calculate the fare. After payment, a green token is dispensed, which must be scanned at the entrance station and deposited at the exit station. A penalty fare applies should a token be lost.
Note that as of 2015 many machines accept only 5 RMB notes. Baggage X-Ray machines are located at each station, and may be manned during peak hours.
Shenzhen Tong cards
Shenzhen Tong is similar to the Octopus card system used on the MTR rail lines in Hong Kong. The multiple fare card stores credit purchased at stations. The card can be used by waving it in front of the card reader located at all entrances and exits to the subway system. Riders who pay for metro fare with a card receive a 5% discount. Since March 1, 2008, riders who pay for a bus fare with a card and then a subway fare within 90 minutes receive an additional 40% discount on the subway fare. Card users pay a distance based fare.
Unlike Hong Kong Octopus Cards, Shenzhen Tong cards cannot be sold back to the stations or have faults dealt with by SZMC. Instead, the customer must go to the offices of Shenzhen Tong. Students studying in Shenzhen can use the Shenzhen Tong to receive a 50% discount.
Integration of Shenzhen Tong and Hong Kong Octopus Cards
Since June 30, 2011, cards containing both a Shenzhen Tong and Hong Kong Octopus chip have been available in both Shenzhen and Hong Kong. There are plans to further integrate the two systems, and for a new card which will be accepted all over Guangdong province and China's two SARs.[70][71]
Station facilities, amenities and services
Stations have toilets (free of charge), and public telephones. SZMC also operates luggage storage facilities in the concourse above Luohu Station. Cellphone service is available throughout the system provided by China Mobile, China Telecom, and China Unicom.[72]
Like the Hong Kong MTR, Guangzhou, and Foshan metros, station announcements are in Mandarin, Cantonese and English. Some announcements, such as train arrival, are in Mandarin and English only.
Equipment
Rolling Stock
Line 1 (Luobao):
- 22 Bombardier Transportation Movia 456 6-car sets(101–122)
- 4 Changchun Railway Vehicles Type A 6-car sets, traction units by Bombardier Transportation(123–126)
- 26 Zhuzhou Electric Locomotive Co., Ltd. Type A 6-car sets, traction units by Siemens(127–152)
Line 2 (Shekou):
- 35 Changchun Railway Vehicles Type A 6-car sets, traction units by Bombardier Transportation(201–235)
Line 3 (Longgang):
- 43 Changchun Railway Vehicles Type B 6-car sets, traction units by Hyundai Rotem
Line 5 (Huanzhong):
- 22 Zhuzhou Electric Locomotive Co., Ltd. Type A 6-car sets, traction units by Siemens(501–522)
- 8 Zhuzhou Electric Locomotive Co., Ltd. Type A 6-car sets, traction units by CSR Times Electric(523–530)
Signalling system
On the Luobao and Longhua Lines and the extension of the Luobao Line, Siemens Transportation Systems supplied 7 (Phase 1) and 6 (Phase 2) LZB 700 M continuous automatic control systems; 7 (Phase 1) and 6 (Phase 2) electronic Sicas ESTT interlockings; the Vicos OC 501 operations control system with 2 operations control centers, fall-back level with Vicos OC 101 and RTU (FEP), 230 (Phase 1) and 240 (Phase 2) FTG S track vacancy detection units.[73]
Shekou & Huanzhong Lines use Casco CBTC system with 2.4 GHz frequencies, and so the system has suffered frequent problems with interference from consumer Wi-Fi equipment.[74] By the end of November 2012, CASCO solved the problem on lines 2 and 5 by switching to their standard solution with frequency diversity on 2 different channels.
See also
- List of Shenzhen Metro stations
- List of rapid transit systems
- Dongguan Rail Transit
- FMetro
- Guangzhou Metro
- Hong Kong MTR
References
- 1 2 "Shenzhen Metro". exploremetro. Retrieved May 27, 2014.
- 1 2 3 深圳市交通运输委员会 (2016-01-19). "2015年12月交通运输运营指标统计月报".
- 1 2 "深圳2020年建成420公里地铁版图". 晶报. 2016-03-04.
- 1 2 深圳市统计局 (December 2, 2008). "深圳市2011年国民经济和社会发展统计公报".
- ↑ ""【深圳】2011年地铁达177公里 长过香港地铁" 星岛网讯" (in Chinese). Archived from the original on 2013-09-23.
- 1 2 "City to spend 48b yuan on 3 Metro lines". Shenzhen Daily. Retrieved 2012-07-28.
- ↑ Shenzhen Metro Line 1, from Luohu to Airport East was put into a trial operation
- ↑ photo of ongoing construction in Shekou
- ↑ (Chinese) Wang, Xiaoqing and Qiu, Gang, "深圳地铁3号线动工 2009年建成通车" southcn.com December 27, 2005
- ↑ (Chinese) 深圳地铁3号线规划线路图 August 21, 2008
- ↑ (Chinese) Xiaoqing, Wang, "深圳地铁5号线全面开工" Xinhua September 19, 2008
- ↑ 深圳市统计局. "2005年度12月份深圳统计月报:运输邮电:地铁客流量1-12月累计" (in Chinese). Archived from the original on January 25, 2013.
- ↑ 深圳市统计局 (December 2, 2008). "深圳市2006年国民经济和社会发展统计公报" (in Chinese).
- ↑ 深圳市统计局 (December 2, 2008). "深圳市2007年国民经济和社会发展统计公报" (in Chinese).
- ↑ 深圳市统计局 (March 24, 2009). "深圳市2008年国民经济和社会发展统计公报" (in Chinese).
- ↑ 深圳市统计局 (April 27, 2010). "深圳市2009年国民经济和社会发展统计公报" (in Chinese).
- ↑ 深圳市统计局 (April 28, 2011). "深圳市2010年国民经济和社会发展统计公报" (in Chinese).
- ↑ 深圳市统计局. "2011年度12月份深圳统计月报:运输邮电:地铁客流量1-12月累计" (in Chinese). Archived from the original on December 4, 2012.
- ↑ "深圳地铁客流量 去年猛增近七成" (in Chinese). 深圳商报. January 10, 2013.
- ↑ "深圳市2013年国民经济和社会发展统计公报" (in Chinese). 深圳市统计局. April 8, 2014.
- 1 2 "2014年度全市交通运输运营主要概况及分析" (in Chinese). Retrieved January 16, 2015.
- ↑ 杨丽,杨德明 (2012). "深圳市城市轨道交通网络化客流变化研究". 现代城市轨道交通 (in Chinese) 6.
- ↑ 陈煜 (2011). "深圳地铁运营对轨道交通客流预测的启示". 铁道工程学报 (in Chinese) 8.
- ↑ 彭森 (August 21, 2005). "从7米到140米——深南大道的宽度之谜" (in Chinese). 深圳晚报.
- ↑ 深圳经济特区总体规划简介[J]. 城市规划,1986,06:9–14.
- ↑ 深圳市地铁有限公司 (2007). 深圳地铁一期工程建设与管理实践.上册 (in Chinese). 北京: 人民交通出版社. ISBN 978-7-114-06262-9.
- 1 2 "深圳地铁十年始获"出生证"" (in Chinese). 深圳新闻网. June 22, 2011.
- 1 2 3 张家识 (1999). "深圳地铁一期工程建设前期工作回顾". In 陈锡贤. 地下铁道文集:中国土木工程学会隧道及地下工程分会地下铁道专业委员会第十三届学术交流会论文选 (in Chinese). 深圳: 海天出版社. ISBN 7-80615-959-2.
- ↑ "深圳地铁网络框架15年前基本敲定" (in Chinese). 深圳特区报. June 25, 2011.
- ↑ "深圳地铁"十年怀胎"终圆梦". 深圳特区报. 2010-04-10.
- 1 2 "深圳地鐵一期工程主要里程碑時間" (in Chinese). 深圳新闻网. Archived from the original on 2012-12-02.
- ↑ "深圳地铁皇岗站正式开通" (in Chinese). Archived from the original on 2007-09-30. Retrieved 2007-07-01.
- ↑ "關於我市近期建設地鐵線路及站點命名的通告" (in Chinese). Retrieved 2012-11-22.
- ↑ "New Line Naming Scheme". Shenzhen Metro Group Official Weibo. Shenzhen Metro Group. Retrieved October 23, 2013.
- 1 2 "地铁不如期完工,我主动请求处分". 南方日报. 2007-02-01.
- ↑ "网友声讨"进度慢",市长强调"拖不起",地铁建设"蚯蚓速度"". 南方日报. 2007-01-19.
- 1 2 "未来五年深圳再建五条地铁". 南方都市报. Retrieved 2012-08-27.
- ↑ "The Shenzhen urban rail transportation recent construction plan approval (2011–2016)". National Development and Reform Commission. Retrieved 2012-08-27.
- ↑ "Public notice (draft)". Shenzhen Urban Planning and Land Resources Committee. Retrieved 2012-08-27.
- ↑ "龙岗加快地铁16号线建设准备". 深圳商报. Retrieved 2012-08-27.
- ↑ "地铁16号线 2014年初开工". 深圳商报. Retrieved 2012-08-27.
- ↑ SZ to advance Metro Line 16 work-szdaily多媒体数字报刊平台
- ↑ "深圳交委称早7点以前或实行地铁票价优惠". 南方网. December 5, 2012.
- ↑ "我市召开轨道交通建设指挥部会议,地铁16号线有望提前开工". 深圳市交通运输委员会. January 7, 2013.
- ↑ "市地铁集团首席规划师刘卡丁:16号线力争提前建设,暂时不到龙岗中心城". 南方日报. December 5, 2012.
- ↑ "深圳市轨道交通11号线可行性研究报告通过批准". 中华人民共和国国家发展与改革委员会. September 5, 2012. Archived from the original on December 1, 2012.
- ↑ "深圳市城市轨道交通规划(修编)环境影响评价第一次公示". The 3rd Railway Survey & Design Institute. March 28, 2013.
- 1 2 3 4 "深圳地铁6号线拟年底开建 11号线预计后年通车". 搜房网. June 10, 2014.
- 1 2 "深圳交委:地铁7、9、11号线2016年通车". 深圳商报. December 6, 2012.
- ↑ "Rail construction for Metro Line 7 completed". SZDaily. November 25, 2015.
- ↑ 深圳地铁9号线西延线前海段动工 - 中国轨道交通协会官网
- 1 2 3 4 5 6 "深圳地铁7,9,11号线明年开通 今年将增加铁路始发列车". 本地宝. 2015-03-31. Retrieved 2015-04-07.
- 1 2 3 4 5 "8号线用磁悬浮相对经济 现有线路除1号线外都要延长". 深圳晚报. February 19, 2014. Retrieved 2014-02-19.
- ↑ 深圳地鐵-地鐵5號線南延段破土動工
- 1 2 地铁6号线10号线预计2019年通车-深圳晚报
- ↑ "地铁6号线10号线预计2019年通车".
- ↑ 刘世雄,陈福贵 (2013). "深圳地铁6号线运营成本测算研究". 现代城市轨道交通 1.
- ↑ 地铁10号线预计本月开工|10号线|地铁|轨道_新浪新闻
- ↑ 深圳地铁10号线拟年底开工 2019年12月开通
- ↑ 深圳地铁6条延长线线路图!看看哪些经过你家 - 深圳本地宝
- ↑ "轨道交通近期建设规划方案". Shenzhen Urban Planning and Land Resources Committee. Retrieved 2012-08-27.
- ↑ http://www.sutpc.com/ad.asp
- ↑ "轨道线网规划方案". Shenzhen Urban Planning and Land Resources Committee. Retrieved 2012-11-21.
- ↑ "Four more Metro lines planned". Shenzhen Daily. Retrieved 2012-11-21.
- ↑ "Dongguan Metro connection called for". Shenzhen Daily. Retrieved 2014-01-22.
- ↑ (Chinese) fare information
- ↑ New Metro fares announced
- ↑ (Chinese) SZMC fare policy
- ↑ types of tickets
- ↑ One smartcard to rule them all: Guangdong, HK team up to offer unified travel card | The Nanfang
- ↑ Guangdong and Hong Kong Linked by One Transportation Card _Life of Guangzhou
- ↑ "features". southcn.com. Retrieved 2012-08-27.
- ↑ "Metro Lines 1 and 4, Shenzhen, China". Archived from the original on 2009-02-04. Retrieved 2008-07-06.
- ↑ "Pocket Wi-Fi hotspots paralyse Chinese metro lines."
External links
Wikimedia Commons has media related to Shenzhen Metro. |
- Shenzhen Metro Group Co.,Ltd. Official website (English)(English)
- Shenzhen Metro Group Co.,Ltd. Official website (Chinese)(Chinese)
|
|
|
|